KEGIATAN PEMBORAN (DRILLING)Pembuatan sumur (well) dengan cara membor lubang jauh kedalam bumi hingga mencapai kedalaman yang ditujuJENIS PEMBORAN: 1. Lokasi : darat (onshore) atau laut (offshore) 2. Orientasi: vertikal, directional, horizontal KEDALAMAN: Mencapai hingga > 10 000 m SUMUR PERTAMA: Oleh Kol. Edwin l. Drake di Titusville, Penssylvania, usa, 1859. Kedalaman 21 m dan menghasilkan minyak 25 bopd1

2

3

4

5

WIRELINE LOGGINGPerekaman keadaan lapisan-lapisan yang telah ditembus oleh lubang sumur JENIS-JENIS LOGGING Mengukur sifat listrik batuan: SP LOG RESISTIVITY LOG Mengukur sifat perambatan bunyi batuan: SONIC LOG Mengukur sifat radioaktif: GAMMA RAY LOG DENSITY LOG Logging tool NEUTRON LOG

6

CONTOH HASIL REKAMAN LOGSP LOG IES LOG

permeable bed permeable bed

gas bearingoil bearing

permeable bed

oil w/owc

permeable bed

water bearing

permeable bed

water bearing7

INTERPRETASI HASIL PEREKAMAN LOGKWALITATIF, dapat menentukan: Jenis dan kedalaman lapisan-lapisan yang ditembus Kedalaman dan ketebalan lapisan -lapisan prospek Isi kandungan fluida lapisan-lapisan prospek

KWANTITATIF, dapat menentukan: Porositas Saturasi air (Sw) Movable Hidrocarbon Saturation (SMH) Residual Hidrocarbon Saturation (SRH) Kandungan clay (Vcl) Densitas fluida8

PENGUJIAN PRODUKSI DAN TEKANANSP LOG IES LOG FORMATION/ WELL TESTING GAS OIL OIL TEST TEST TEST SURFACE WELL TESTING

TESTING BIASANYA DILAKUKAN LAPISAN PERLAPISAN, SECARA SENDIRI-SENDIRI9

PENYELESAIAN SUMUR (WELL COMPLETION)CARA-CARA PENYELESAIAN SUMUR: 1. Berkaitan dengan aliran Migas dari Lapisan batuan ke sumur: Openhole completion Liner completion (perforated, slotted) Cased hole completion (perforated) 2. Berkaitan dengan lapisan yang dibuka dan cara mengalirnya migas: Single completion Comingle completion Dual completion with 2 tubings Dual completion with 1 tubing Triple completion

11

4-1/2"Tbg

2.75" Nipple

Cement Plug

6-1/4" Open Hole

VICO IndonesiaDF El evation : 76.70 Ft.

A Divi si on of Virgi nia Indonesia Company

WELL SKETCH Nilam # 167Tubing ha nger

tAs

Kutai-2Zero is DF : 16.90 Ft above hanger 1 J t,3-1 /2 "Tbg CSCB X-Ov er,3-1 /2 "CSCB x 3 -1 /2 "CSCB 3 -1 /2 "(4 )Pup jo ints CSCB

20"Csg @ 173' 13-3/8"Csg,68.0 #/ft K-55 BUTT @ 3003'2 5 9 Jts, 3-1 /2 "Tbg ,9 .3 # /ft N-8 0 CSCB

9 -5 /8 "BAKE R T-2 Pa cker @ 80 6 5 ' 2 8 J ts, 3 -1 /2 "Tbg ,9 .3 # /ft N-80 CSCB

Perf'd the D-59 zone on April 03, 1997 and tested gas. 32/64"Chk, FTHP 2260 psi, 13.48 mmcfd, 172 bcpd @ 53.0 deg API, bs&w 8 %, Cl 10000 ppm.

Perfs : 8953'- 9017' (D-59)2 1 J ts, 3 -1 /2 "Tbg ,9 .3 # /ft N-80 CSCB X-Ov er,3-1 /2 "CSCB x 2 -3 /8 "CSCB @ 96 5 2 ' 2 -3 /8 "LXE Co nn. @ 9 6 7 3' 9 -5 /8 "BAKE R FH Pa cker @ 9 6 8 9' 2 -3 /8 "OT IS SSD @ 97 5 8 '

G

Perf'd the E-54C zone on April 01, 1997 and tested gas. 32/64"Chk, FTHP 2440 psi, 10.5 mmcfd, 897 bcpd @ 49.0 deg API, Trace water.

Perfs : 9798'- 9804' (E-54C)2 -3 /8 "LXE Co nn. @ 1 0 1 28 ' 9 -5 /8 "BAKE R FH Pa cker @ 1 0 1 48 ' 2 -3 /8 "SSD @ 1 0 1 8 4'

G

Perf'd the E-62/60A zones on March 30, 1997 and tested oil. 32/64"Chk, FTHP 766 psi, 3.4 mmcfd, 343 bopd @ 33.4 deg API,bs&w 14 %, Cl 8000 ppm.

Perfs : 10229'-10236' (E-60A)4 J ts, 2 -3 /8 "Tbg ,4 .7 #/ft N-8 0 CSCB

OPerfs : 10393'-10398' (E-62)2 -3 /8 "LXE Co nn. @ 1 0 7 79 ' 9 -5 /8 "BAKE R FH Pa cker @ 1 0 7 98 '

Perfs : 10880'-10899' (E-70) 10906'-10917' (E-71)

TOL @ 11104' DPM

Perfs : 11101'-11136' (F-50/50A)

9-5/8"Csg,47.0 #/ft N-80 BUTT @ 11259'2 -3 /8 "SSD @ 1 1 7 7 1'

G

Perf'd the F-70A/69/64/62/50A/50/E-71/70 zones on March 28, 1997 and tested gas. 32/64"Chk, FTHP 200 psi, 1.3 mmcfd, bs&w 3 %, Cl 16000 ppm.

Perfs : 11822'-11829' (F-62) 11886'-11893' (F-64) Perfs : 12088'-12093' (F-69) 12145'-12155' (F-70A)2 -3 /8 "LXE Co nn. @ 1 2 4 27 ' 9 -5 /8 "BAKE R SB -3 Pa cker @ 1 2 4 45 '

2 -3 /8 "SSD @ 1 2 4 7 9' 2 -3 /8 "OT IS XN-Nipple @ 12 5 1 1 '

Perf'd the G-59A/59/58B/58A/53/51/50B zones on March 24, 1997 and tested gas. 48/64"Chk, FTHP 380 psi, 5.51 mmcfd, bs&w 95 %, Cl 3000 ppm. Conf. tested on April 03, 1997. 48/64"Chk, FTHP 182 psi, 1.9 mmcfd, 18.6 bcpd, bs&w 94 %, Cl 6000 ppm.PBT D @ 1 33 2 8 ' FC @ 1 33 5 6 '

Perfs : 12550'-12557' (G-50B) 12624'-12635' (G-51) 12707'-12716' (G-53)Perf. pup jo int @ 1 2 72 2 '

G

Perfs : 13130'-13171' (G-58A) 13178'-13198' (G-58A) 13215'-13222' (G-58B) 13234'-13296' (G-59 13324'-13335' (G-59A)

7"Liner,32.0 #/ft P-110 BUTT @ 13400'TD @ 1 34 6 4 '

Spud date : 17-Nov-1996Da te : -

Prep. by : AR Date : 040497

Drawn by : AR Date : 040497

Checked by : B I Date : 070497

Date : 04-Apr-1997 Date : | X| New Completion | | Recompletion

Rev'd. by : Remarks :

Technic al Admini strative Support - Jkt

14

FORMATION/WELL TESTING Dilakukan sebelum/ sesudah pemasangan casing, penyemenan, dan perforasi dilakukan. Open Hole Testing diikuti dengan Cased Hole Testing menjadi standard di beberapa area

Merupakan langkah akhir untuk menentukan profitabilitas sumur Wireline Formation Testers, Drill Stem Test Tools, dan Surface Well Tests dapat digunakan baik di Opehole maupun Cased Hole15

FORMATION/WELL TESTING Wireline Formation Test, DST, dan Surface Well Test bisa digunakan tunggal atau kombinasi Masing-masing Test berbeda dalam jangkauan dan waktu yang dibutuhkan Dibutuhkan data yang baik untuk memudahkan pengambilan keputusan dalam desain komplesi dan perencanaan produksi sumur Secara umum, Formation Testing dapat menentukan jenis fluida yang diproduksi berikut laju alirnya

Data Formation Test, bersama Logging, Coring, dan Data lain yang telah dikumpulkan dari suatu sumur membantu untuk menentukan jenis komplesi yang terbaik/ sesuai16

Peralatan Testing