07.POTONGAN MELINTANG

download 07.POTONGAN MELINTANG

of 1

Transcript of 07.POTONGAN MELINTANG

  • 8/17/2019 07.POTONGAN MELINTANG

    1/1

             2         7         4  .

             0         0

             2         6         6  .

             0         0

             2         6         9  .

             0         0

             3         0         4  .

             0         0

             2         7         7  .

             0         0

      +102.00

      +101.00

      +103.00

      +104.00

      PATOK (STA)

      JARAK TITIK (cm)

      KEMIRINGAN EXISTING (%)

      ELEVASI EXISTING

      ELEVASI RENCANA

      KEMIRINGAN RENCANA (%)

    P8 (0+400)

    1000

            1        0        3

      .        6        9

     A D

    2%

    2%

            1        0        4

      .        0        4

    2%

    2%

    B C

            1        0        3

      .        6        5

            1        0        3

      .        7        4

            1        0        3

      .        7        7

             2         7         9  .

             2         5

             2         8         9  .

             0         0

             2         7         7  .

             0         0

             3         2         6  .

             0         0         3

             1         3  .

             9         6

      PATOK (STA)

      JARAK TITIK (cm)

      KEMIRINGAN EXISTING (%)

      ELEVASI EXISTING

      ELEVASI RENCANA

      KEMIRINGAN RENCANA (%)

    P9 (0+450)

    1000

            1        0        3  .

            7        7

     A D

    2%

    2%

            1        0        4  .

            2        6

    2%

    2%

    B C

            1        0        3  .

            8        9

            1        0        3  .

            7        9

            1        0        4  .

            1        4

      +105.00

    2000.00

    URUGAN PILIHAN T : 20 CM

    URUGAN BIASAGALIAN

    URUGAN PILIHAN T : 20 CM

    URUGAN BIASAGALIAN

    500.00 500.00

    2000.00

    URUGAN PILIHAN T : 20 CM

    URUGAN BIASAGALIAN URUGAN PILIHAN T : 20 CM

    URUGAN BIASAGALIAN

    500.00 500.00

    MUH. SAID, STDIREKTUR

    JASMAN, ST

    KEGIATAN

    SIPIL

    DRAFTER

    DINAS PEKERJAAN UMUMPROVINSI SULAWESI TENGGARA

    IRFAN M. MANOPPO, ST

    RIJAL ANSAPUTRA, ST

    SURVEYOR

    PEKERJAAN

    CATATAN / REVISI

    KONSULTAN PERENCANA

    TEAM PERENCANA

    NAMA GAMBAR SKALA

    NO. LEMBAR JML. LEMBAR KODE GAMBAR

    08

    PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)

    DINAS PEKERJAAN UMUM

    PROVINSI SULAWESI TENGGARA

    MENGETAHUI / MENYETUJUI

    HAMKA, ST

    NIP. 19770630 201001 1 010

    PERENCANAAN PEMBANGUNAN DRAINASE JALANPROVINSI POROS ANDOLO - PALANGGA

    (RUAS PUNGGALUKU - ALANGGA)

    PEMBANGUNAN DRAINASE JALAN PROVINSI POROS

    ANDOLO - PALANGGA

    (RUAS PUNGGALUKU - ALANGGA)

    PROFIL MELINTANG SEGMEN 3

    STA. 0+400 - 0+450

    07

      H = 1 : 20

      V = 1 : 10

      +101.00

      +103.00

      +104.00

      +105.00

      +102.00