Universitas Kristen Maranatha 93 LAMPIRAN LI Gambar Struktur LII Bill of Quantity / RAB LIII Hasil Perhitungan Bill of Material LIV Time Schedule

description

marketing

Transcript of 0721074 Appendices

Page 1: 0721074 Appendices

Universitas Kristen Maranatha 93

LAMPIRAN

LI Gambar Struktur

LII Bill of Quantity / RAB

LIII Hasil Perhitungan Bill of Material

LIV Time Schedule

Page 2: 0721074 Appendices

Universitas Kristen Maranatha 94

LAMPIRAN I

GAMBAR STRUKTUR

L1.1 Denah Lantai 1

L1.2 Denah Lantai Mezzanine

L1.3 Denah Lantai 2

L1.4 Denah Lantai 3

L1.5 Denah Lantai 4 S/D 9

L1.6 Denah Lantai 10

L1.7 Portal As C Lantai B2 S/D Lantai 5

L1.8 Portal As C Lantai 6 S/D Lantai Atap

L1.9 Tabel Balok

L1.10 Tabel Kolom

L1.11 Tabel Tulangan Pelat

L1.12 Site Plan Lapangan

Page 3: 0721074 Appendices

SLAB

S1

S2

S3

S4

S5

S6

S7

S8

S9

S10

S11

S12 150

120

120

170

200

170

170

150

150

120

120

120600X600

500X800

500X800

900X800

500X800

500X500

500X500

400X400

Ø600K5

K4

K3A

K3

K2C

K2B

K2A

K2

K1C

K1B

K1A

K1

KOLOM

K6

K6A

K6B

K6C

K6D

K7

K7A

K7B

K8

KL9

K10

K10A 400X750

400X750

700X700-300

300X300

700X800

300X750

400X750

800X800-300

800X800-300

400X400

200X200K15

K12

KL11A

KL11

KA0B

600X600

600X600

600X600

300X750

300X750

300X750

300X750

700X800

700X800

1400X400

1400X400

900X500

700X1500

700X1500-700

700X500

700X700-500

400X800

400X800

400X700

400X700

400X600B10

B8A

B8

B6A

B6

B4A

B4

B3A

B3

B2

B1A

B1

BALOK

B10B

B12

B12A

B14

B14A

B14B

B14C

B16

B17

B17C

B18

B18A 300X500

300X600

300X600-500

300X600

500X1000

300X700

300X700

300X700-500

300X700

550X500

550X500

400X600

300X500

250X500

200X400

200X450B22

B20

B19

B18C

LEGEND :

1 2 3 4 5 6 7 8 9 9'

H

G

F

E

D

C

B

A

A'

33650

1625 4000 4000 4000 4000 4000 4000 4000 5650 4584

4378

2147

2825

6000

3700

6000

1675

3775

3050

0

B20

(20

0X40

0)B

20(2

00X

400)

B20

(200

X40

0)

B20

(200

X40

0)

S1 S1 S1 S1 S1 S1 S1 S2

S4 S2 S1 S1 S1 S2

S2

S2

S2

S2

S2 S2 S2

S1 S1 S1 S1 S1

S2

S4 S4

S4 S4 S1 S2

S4 S4

S4 S4

S5

S5

NK

B1

8(3

00X

500)

B1

8(3

00X

500)

NK

KL9 KL9 K1 K1 K2 K1 K1

B10

(400

X60

0)

B10

(400

X60

0)

B10

(40

0X60

0)

B18

A(3

00X

500)

B18

A(3

00X

500)

B10

(400

X60

0)

B10

(40

0X60

0)B

17(3

00X

600)B18

(30

0X60

0)B

18(3

00X

500

)

B17

B(3

00X

600

)B

18(3

00X

500

)

B1

9(25

0X5

00)

B18

(300

X6

00)

B1

7(50

0X6

00)

B18

(30

0X50

0)

B1

8(50

0X5

00)

B17

(30

0X60

0)

B17

(30

0X60

0)

B18

(300

X50

0)

B18

(300

X50

0)

B18

(300

X50

0)

B18

(300

X50

0)

B18

(300

X50

0)

B18

(30

0X50

0)

B1

7(3

00X

600)

EL

-0.1

00

B1

7(3

00X

600)

EL

-0.1

00

B1

7(3

00X

600)

EL

-0.7

0

B1

8(3

00X

500)

EL

-0.7

0

B14(3

00X

700)

B14

(30

0X70

0)

B8(400X700) EL -0.70 B8(400X700)B8

B17(300X600) B17 K4K3A B17B(300X600) B17B(300X600)

B17B(300X600)B17B(300X600)

K4

K7BK3A K7B

K7B K7BK2A

K2A

K2A

K2A

K4 K4 K4

K2 K2

K2

K2A K2B K2 K2

B8( 400X70 0)

B14

B17B(300X600)B18

B17

B17

RAMP 2

S4 S4 S4 S2

WALL BELOW

CAPPING BEAM

B19(250X250)B19(250X250) B19(250X250)

B10B(400X600)B10B(400X600)B10B(400X600) EL - 1.050

FFL - 1.850

FFL - 1.150SFL - 1.270

C

PROPERTY LINE

FFL - 1.850

B19

B14

(30

0X70

0)

SFL

-1.0

50

B1

0(40

0X6

00)

B18

A(3

00X

500)

B18

A

B4(700X500)

SFL - 1.050

WA

LL

BEL

LO

W

PRO

PE

RTY

LIN

E

B18

B18

(300

X6

00)

B19

B19(250X500)

BALOKMIRING

WALL BELLOWt = 200 mm

B17B(300X600) EL - 1.200

B17

B(30

0X

600)

K4 B17B

B17B(300x600)

B18

S2

S2B18

(300

X50

0)

B18

(300

X50

0)

FFL - 1.150SFL - 1.200

K5 K5

SFL - 2.300

B 19

B19

K4

RAMP 1

FFL - 1.950

B18

B19

K4

K5B

19

B18

S3

FFL - 1.500SFL - 1.550

B19(250x500)

S4

WALL BELLOW

S4

S4

CAPPING BEAM

K4

B20(250X400) EL -0.70

B19

B19(250X500) EL -0.70 WALL BELLOW

TG - 03 FFL - 0.020SFL - 0.070

FFL - 0.050SFL - 0.100

TG - 05

PROPERTY LINE B19(250X500) B19(250X500)

CAPPING BEAM

B19(250X500)

KL 11

B14(300X700)

B14

B14LB - 1

LP - 1

LP - 1NK TR

2150

2050

2050

3100

2350

B6(

400X

800)

2150

TG - 01

B1 8

(3 00X

50 0)

KL 11A

B14B(300X700)FFL - 0.000SFL - 0.050

B17B(300X600)

B17B(300X600)

B18(300X500)

B18

(300

X50

0)

B19(250X500)

B1 8(30 0X500)

S2 S3

WAL L BE LLOW

B19(250X500)S3

S2

B19(250X500)

B19( 250X

500)

S3

PROPERTY LINE

B19( 250X

500)

B18(300X500)

WA

LL

BELL

OW

B18( 300X

500)B

19( 250X500)

B18

B18

S3

B18

S3

B19( 250X

500)

WA

LLB

ELLO

W

B18

Page 4: 0721074 Appendices

SLAB

S1

S2

S3

S4

S5

S6

S7

S8

S9

S10

S11

S12 150

120

120

170

200

170

170

150

150

120

120

120600X600

500X800

500X800

900X800

500X800

500X500

500X500

400X400

Ø600K5

K4

K3A

K3

K2C

K2B

K2A

K2

K1C

K1B

K1A

K1

KOLOM

K6

K6A

K6B

K6C

K6D

K7

K7A

K7B

K8

KL9

K10

K10A 400X750

400X750

700X700-300

300X300

700X800

300X750

400X750

800X800-300

800X800-300

400X400

200X200K15

K12

KL11A

KL11

KA0B

600X600

600X600

600X600

300X750

300X750

300X750

300X750

700X800

700X800

1400X400

1400X400

900X500

700X1500

700X1500-700

700X500

700X700-500

400X800

400X800

400X700

400X700

400X600B10

B8A

B8

B6A

B6

B4A

B4

B3A

B3

B2

B1A

B1

BALOK

B10B

B12

B12A

B14

B14A

B14B

B14C

B16

B17

B17C

B18

B18A 300X500

300X600

300X600-500

300X600

500X1000

300X700

300X700

300X700-500

300X700

550X500

550X500

400X600

300X500

250X500

200X400

200X450B22

B20

B19

B18C

33650

1625 4000 4000 4000 4000 4000 4000 4000 5650 4584

4378

2147

2825

6000

3700

6000

1675

3775

3050

01 2 3 4 5 6 7 8 9 9'

H

G

F

E

D

C

B

A

A'

2350

3100

2050

2050

2150

B14(300X700)

B14

B14

(300

X70

0)

B14

(300

X70

0)

B18

(30

0X50

0)

B14

(30

0X70

0)

B14

(30

0X70

0)

B14(300X700)

KL11KL11A

KL11

TG-01LP - 1

LP - 2NK TR

B14

2150

B18(300X500)

B14(300X700)

B17

500

1000

1000

1000

1000

1000

550

750 2000 2000 2000 2000 750

9500

6050

9300

1225

3200

2800

2400

1300

3250

1625

3615

2150

2760

175

2650

1150

4850

885 800 2100 800

585

1040 1385

800

1350

500

2600

B17

1600 19

75

375

3250 3250

5800

S1 S2

S3 S2 S2

S1

S1

S2

S2

S2

S3

B8(400X700) EL-3.1101100

K1AKL9KL9

B1

7(3

00X

600)

B1

7(3

00X

600)

TG-03

B17

(300

X60

0)

EL-3

.110

B1

8(3

00X

500)

B8(400X700)K2 K7B

B20(200X400)

B18

(30

0X50

0)B

18(3

00X

500

)B

18(

300

X50

0)

B18

C(3

00X

500

)

B18

C(3

00X

500)

B8(400X700)

B8(400X700)

B17(300X600)

B8A(400X700)

B20(250X400)

B18

(300

X50

0)B

18(3

00X

500)

B18

(30

0X50

0)B

18(3

00X

500)

B20(200X400)

TG

-04

TRNK

B18

C(3

00X

500)

B18

C(3

00X

500)

B8

B6A

B18

B8K2

K2

K2 K2 K2A

B20

B14A

B20

TR

B20

B18

B18

B8

K3A

K3A

K1K2 K1 K1

K7B

K7B K7B K2

K2 K2 K2

K2

K2

8000 7200 800 4000 435 5215 4584

2886

58

377

58

4433

58

KA

H100X150X6

H100X150X6

H100X150X6

H100X150X6

H100X150X6

H100X150X6

H1

00X

150X

6

WF

300

X1

50X

6.5

X9

WF

300

X1

50X

6.5

X9 H

100

X1

50X

6

WF

300X

150X

6.5

X9

LEGEND :

FFLSFL

+ 3.200+ 3.150

FFL

+3.

110

2252

5

39859

Page 5: 0721074 Appendices

SLAB

S1

S2

S3

S4

S5

S6

S7

S8

S9

S10

S11

S12 150

120

120

170

200

170

170

150

150

120

120

120600X600

500X800

500X800

900X800

500X800

500X500

500X500

400X400

Ø600K5

K4

K3A

K3

K2C

K2B

K2A

K2

K1C

K1B

K1A

K1

KOLOM

K6

K6A

K6B

K6C

K6D

K7

K7A

K7B

K8

KL9

K10

K10A 400X750

400X750

700X700-300

300X300

700X800

300X750

400X750

800X800-300

800X800-300

400X400

200X200K15

K12

KL11A

KL11

KA0B

600X600

600X600

600X600

300X750

300X750

300X750

300X750

700X800

700X800

1400X400

1400X400

900X500

700X1500

700X1500-700

700X500

700X700-500

400X800

400X800

400X700

400X700

400X600B10

B8A

B8

B6A

B6

B4A

B4

B3A

B3

B2

B1A

B1

BALOK

B10B

B12

B12A

B14

B14A

B14B

B14C

B16

B17

B17C

B18

B18A 300X500

300X600

300X600-500

300X600

500X1000

300X700

300X700

300X700-500

300X700

550X500

550X500

400X600

300X500

250X500

200X400

200X450B22

B20

B19

B18C

B14(300X700)

B14

KL11KL11A

NK TR

K1AKL9KL9

B1

8(3

00X

500)

TG-03

K2 K7A

TRNK

B2 B6A

B18

K2

K2

K2 K2 K2

K1K2B K1A K1

K7B

K7A K7A K2

K2 K2 K2

K2

K2

KA

LEGEND :

1 2 3 4 5 6 7 8 9 9'

H

G

F

E

D

C

B

A

A'

K10B K10B

TR

33650

1625 4000 4000 4000 4000 4000 4000 4000 5650 4584

4378

2147

2825

6000

3700

6000

1675

3775

3050

0

S3 S3 S3 S3 S3 S3 S3 S3

S3 S1 S1 S1 S1 S1 S1 S1 S2S1

S3 S1 S1 S2 S2 S2 S2 S2

S3 S1 S1 S1S2

S2

S2

S1 S1 S1 S1 S1S1

S2

S2

B19(250X500)B19(250X500) B19(250X500) B19(250X500) B19(250X500) B19(250X500) B19(250X500) B19(250X500)B19(250X500)

B2(900X500) B2(900X500)B8A(400X700) B8A(400X700) B8A(400X700) B8A(400X700) B8A(400X700) B8(400X700) B14A

B19

B18

B17

A

B4AB

19

B18

B4A B18

B14

A

B14

A

B1

4A

B18

B1

9(25

0X5

00)

B1

7C(3

00X

600)

B1

8(30

0X5

00)

B3

A(7

00X

1500

/700

)

B1

8(30

0X5

00)

B3

A(7

00X

1500

/700

)

B1

8(30

0X5

00)

B1

4(30

0X7

00)

B17 (3 00 X

60 0)

B14(300X

700)

B 19( 250X

500)

B18

B19

(250

X50

0)

B17

C(3

00X

600

)

B18

(300

X50

0)

B3A

(700

X1

500/

700)

B4(700X500)B4(700X500)B6C(400X800) B6C(400X800) B6C(400X800) B14B(300X700) B14A

B14( 300X

700)

B18

B19

(25

0X50

0)

B17

C(30

0X

600)

B18

(30

0X50

0)

B3(

700

X1

500)

B2(900X500) B2(900X500)

B4(700X500)B4(700X500)

B3(

700

X15

00)

B6A(400X800) B6A(400X800) B14(300X700)

B14C(300X700)

B14A

B19( 25

0X500)

B1 4(3 00X

70 0)

B18

(300

X50

0)

B14

(300

X70

0)

B18

(30

0X50

0)

B14B(300X700) B14

B14

(300

X7

00)

EL+

6.4

30

B18

(300

X50

0)E

L+

6.4

30

B3

A(7

00X

1500

/700

)EL

+6.

430

B14(300X700) EL + 6.430 B6(400X800) B6(400X800)

B3A

(700

X1

500/

700)

B18

A(3

00X

500

)

B6 A(4 00X800)B6A(400 X800)

B1 4

C(3 0 0X7 0 0 )

B6(400X800)

B14

(300

X70

0)

B18

(30

0X50

0)

B14B(300X700)B14

(300

X70

0)

B1

4(3

00X

700)

B6(

400X

800)

B6(400X800) B17A

B18(300X500)

B19(250X500)

B1

8

B 19( 250X500)

B18

B14

(300

X70

0)

B18( 300X500)

TG-05

TG-01

1600

1225

1300

2930

100°

3250

1625

2375 4000 8000 7200 800 4000 435

5215

4584 3304

1475 33548 3182

2252

5

1 3469

16530

FFLSFL

+ 6.450+ 6.430

FFLSFL

+ 6.500+ 6.450

43163

1300150

830150

700150

1000 935

1600

KL11

1150

1500 3100

2050

2050

2150

2150

1065 1785

B17 ( 3

0 0X6 00 )

Page 6: 0721074 Appendices

SLAB

S1

S2

S3

S4

S5

S6

S7

S8

S9

S10

S11

S12 150

120

120

170

200

170

170

150

150

120

120

120600X600

500X800

500X800

900X800

500X800

500X500

500X500

400X400

Ø600K5

K4

K3A

K3

K2C

K2B

K2A

K2

K1C

K1B

K1A

K1

KOLOM

K6

K6A

K6B

K6C

K6D

K7

K7A

K7B

K8

KL9

K10

K10A 400X750

400X750

700X700-300

300X300

700X800

300X750

400X750

800X800-300

800X800-300

400X400

200X200K15

K12

KL11A

KL11

KA0B

600X600

600X600

600X600

300X750

300X750

300X750

300X750

700X800

700X800

1400X400

1400X400

900X500

700X1500

700X1500-700

700X500

700X700-500

400X800

400X800

400X700

400X700

400X600B10

B8A

B8

B6A

B6

B4A

B4

B3A

B3

B2

B1A

B1

BALOK

B10B

B12

B12A

B14

B14A

B14B

B14C

B16

B17

B17C

B18

B18A 300X500

300X600

300X600-500

300X600

500X1000

300X700

300X700

300X700-500

300X700

550X500

550X500

400X600

300X500

250X500

200X400

200X450B22

B20

B19

B18C

LEGEND :

1 2 3 4 5 6 7 8 9 9'

H

G

F

E

D

C

B

A

A'

33650

1625 4000 4000 4000 4000 4000 4000 4000 5650 4584

4378

2147

2825

6000

3700

6000

1675

3775

3050

0

TG-03

B14(300X700)

B14

B1

4(3

00X

700)

B6(

400X

800)

S3 S3 S3 S3 S3 S3 S3 S3

S1S3 S1 S1 S1 S1 S1 S1 S1 S3

S3 S2 S2 S2 S2 S2 S2 S2 S2 S3

S3 S1 S1 S1 S1 S1 S1S3

S11 S11 S11 S11 S11

S11 S11

S11

S11

S11

S3

B19( EL +12.750 ) B19(250X500)

3310690B19(250X500) B19(250X500) B19(250X500)

B19( EL +12.750 )

1600

1225

1475 4150

38205

690 3310 4000 690 3310 4000 5398 3182

1654

B18

B1

4A

B4A

B18

B4A

B18

B18

B18

B1

4A B14A( EL +12.750 )

B14A B14B(300X700) B14B(300X700) B14B(300X700) B14B(300X700) B14B(300X700) B14B(300X700) B14B(300X700) B14B(300X700)

B19

(25

0X50

0)

B14

(30

0X70

0)

B18

(30

0X50

0)

B3

A(7

00X

1500

/700

)

B18

(30

0X50

0)

B3

A(7

00X

1500

/700

)

B18

(30

0X50

0)

B14

(30

0X70

0)

B18 ( 30 0X

5 00 )

B14(300X

700)

B19( 250X

500) EL

+12.750

B14A B14B(300X700) B14B(300X700) B14B(300X700) B14B(300X700) B14B(300X700) B14B(300X700) B14B(300X700) B14B(300X700) B14A( EL +12.750 )

B19

(250

X50

0)

B14

C(3

00X

700

)

B18

(30

0X50

0)

B3

A(7

00X

1500

/700

)

B18

(30

0X50

0)

B3

A(7

00X

1500

/700

)

B18

(30

0X50

0)

B14

(300

X70

0)

B18 (3

00 X50 0)

B14( 300X

700)B19( 250X

500) EL

+12. 750

B14A B6C(400X800) B6C(400X800) B6C(400X800) B6C(400X800) B6C(400X800) B6C(400X800)

B14C(300X700)

B14A( EL +12.750 )

B19

(250

X50

0)

B14

C(3

00X

700

)

B18

(30

0X50

0)

B3A

(700

X1

500/

700

)

B18

(30

0X50

0)

B3A

(700

X1

500/

700

)

B18

(30

0X50

0)

B1 4( 300 X

7 00)

TG-01

B1

7(3

00X

600)

TRNK

B17A B6A

B14B(300X700) B14B(300X700) B14B(300X700) B14B(300X700)B8 A(4 00X700)

B8A (40 0X700) B14

B16

B14

B14

B14B(300X700)

B17

B1

4(30

0X7

00)

B1

8(30

0X5

00)

B3A

(700

X1

500/

700)

B14(300X700) EL + 12.750 B14(300X700) EL + 12.750 B14(300X700) EL + 12.750

B18

(300

X50

0)

B3A

(70

0X15

00/

700)

B1

8(3

00X

500)

B1

6(5

00X

1000

)

B14(300X700) EL + 12.750 B14(300X700) EL + 12.750 B17A

B17

EL

+1

2.75

0 B20

B18 EL + 12.750

B6(400X800)

B14

EL

+12

.750

B18

EL

+12

.75

0

B 18( 300X500) EL + 12.750

B18 EL + 12.750

B19E L

+ 12.750

B14A

B19 (300X600) EL + 12.750

B19

2252

5

K10

NK TR

K10A K10 K10 K10 K10

K15

K10

K10B K10B K10 K10

K15

K15

K10 K10B K10 K10K15

K10

K10 K10B

K15

K11

K11

K3 K11

K15

K15K4

K1K15

K1K15K2B

K15

K15

K1

K15

K1

KL9KL9

4000

200

200

200

200

200

3250

1625

2375 3310 8000 7110 890 4000 5215 4584 3304

43163

435690

100°

1 3469

16530

FFL

SFL

+12

.800

+12

.750

FFLSFL

+ 12.800+ 12.750

FFLSFL

+ 12.800+ 12.750

FFLSFL

+ 12.800+ 12.750

FFLSFL

+ 12.800+ 12.750

Page 7: 0721074 Appendices

SLAB

S1

S2

S3

S4

S5

S6

S7

S8

S9

S10

S11

S12 150

120

120

170

200

170

170

150

150

120

120

120600X600

500X800

500X800

900X800

500X800

500X500

500X500

400X400

Ø600K5

K4

K3A

K3

K2C

K2B

K2A

K2

K1C

K1B

K1A

K1

KOLOM

K6

K6A

K6B

K6C

K6D

K7

K7A

K7B

K8

KL9

K10

K10A 400X750

400X750

700X700-300

300X300

700X800

300X750

400X750

800X800-300

800X800-300

400X400

200X200K15

K12

KL11A

KL11

KA0B

600X600

600X600

600X600

300X750

300X750

300X750

300X750

700X800

700X800

1400X400

1400X400

900X500

700X1500

700X1500-700

700X500

700X700-500

400X800

400X800

400X700

400X700

400X600B10

B8A

B8

B6A

B6

B4A

B4

B3A

B3

B2

B1A

B1

BALOK

B10B

B12

B12A

B14

B14A

B14B

B14C

B16

B17

B17C

B18

B18A 300X500

300X600

300X600-500

300X600

500X1000

300X700

300X700

300X700-500

300X700

550X500

550X500

400X600

300X500

250X500

200X400

200X450B22

B20

B19

B18C

LEGEND :

33650

1625 4000 4000 4000 4000 4000 4000 4000 5650 4584

4378

2147

2825

6000

3700

6000

1675

3775

3050

01 2 3 4 5 6 7 8 9 9'

H

G

F

E

D

C

B

A

A'

KL9 KL9B18

B1

8(3

00X

500)

B1

4(3

00X

700)

TRNK

TG-03

B19

(25

0X25

0)B

19(2

50X

250

)

B18

(30

0X50

0)B

18

B18

(300

X50

0)B

4(7

00X

500)

B12

B12

B12

B6A

B18

B14

K6

K6A

K6

K6 K6

K6A

K6

K6 K6A

K6

K6A

K6 K6

K6

K6

B18

B12(550X500)S8

S3

S3 S7

S6

S6

S8 S8 S8 S8 S8

S6 S6 S6 S6

S7 S7 S7

S6 S1 S3

S8 S8

S3

B12A(550X500)

B12A(550X500)

B12(550X500) B12(550X500) B12(550X500) B12(550X500)

1525

K6BK6K6B

LT. 4LT. 5 s/d 8LT. 9

LT. 9LT. 8LT. 4 s/d 5

K6BK6K6B

LT. 9LT. 4 s/d 7

K6AK6B

LT. 9LT. 5 s/d 8LT. 4

K6AK6K6A

B18

A(3

00X

500)

B1(

1400

X40

0)

B18

A(3

00X

500)

K6BK6AK6B

LT. 4 s/d 5LT. 6 s/d 8LT. 9

SFLFFLLT. 4 + 16.20

+ 16.15

+ 19.35+ 19.40LT. 5 FFL

SFL

LT. 7 s/d 8LT. 5 s/d 6LT. 4

K6AK6BK6

LT. 9K6D

LT. 6 s/d 9LT. 5LT. 4

K6K6AK6B K6A

K6LT. 4LT. 5 s/d 9

SFLFFLLT. 7 + 25.80

+ 25.75

+ 22.55+ 22.60LT. 6 FFL

SFLSFLFFLLT. 8 + 29.00

+ 28.95

+ 32.15+ 32.20LT. 9 FFL

SFL

B18

A(3

00X

500)

B18

A(3

00X

500)

LT. 9LT. 4 s/d 8

K6AK6B

K6K6A

LT. 4 s/d 5LT. 6 s/d 9

K6AK6

LT. 4 s/d 8LT. 9

LT. 9LT. 4 s/d 8

K6BK6

B12(550X500)

B18

A(3

00X

500)

B1(

1400

X40

0)

B12(550X500)

B12(550X500)

B12(550X500)

K6K6A

LT. 4 s/d 7LT. 8LT. 9K6B

K6B LT. 9LT. 8LT. 4 s/d 7

K6AK6

B12A(550X500)

B12(550X500)

1200 865 1035 585

2350

3100

1300

2350

1675

2025

2050

2150

B19(250X500)

B19

B14

A

B14(300X700)

B14BB14

B14

B14

A

B14

A

B14

(300

X70

0)

B14

(300

X70

0)

B14

(300

X70

0)

B14

(30

0X70

0)

B14

(30

0X70

0)

B14

(30

0X70

0)

B18

(30

0X50

0)

B17(300X600)

B17(300X600)

B14(300X700)

K3 KL11KL11

KL11

TG-01

LP - 1

LP - 1

LP - 2NK TR

B14C

LT. 8 s/d 9LT. 4 s/d 7

K11K11A

K6K6A

LT. 4 s/d 8LT. 9

K6A LT. 9LT. 6 s/d 8LT. 4 s/d 5

K6BK6D

B18

A(3

00X

500)

B12(550X500)

B12(550X500)

B14

(300

X70

0)

B14

K6

K6

K6

B18

B18

B18

B18

B18

B1(

1400

X40

0)

B14

Page 8: 0721074 Appendices

SLAB

S1

S2

S3

S4

S5

S6

S7

S8

S9

S10

S11

S12 150

120

120

170

200

170

170

150

150

120

120

120600X600

500X800

500X800

900X800

500X800

500X500

500X500

400X400

Ø600K5

K4

K3A

K3

K2C

K2B

K2A

K2

K1C

K1B

K1A

K1

KOLOM

K6

K6A

K6B

K6C

K6D

K7

K7A

K7B

K8

KL9

K10

K10A 400X750

400X750

700X700-300

300X300

700X800

300X750

400X750

800X800-300

800X800-300

400X400

200X200K15

K12

KL11A

KL11

KA0B

600X600

600X600

600X600

300X750

300X750

300X750

300X750

700X800

700X800

1400X400

1400X400

900X500

700X1500

700X1500-700

700X500

700X700-500

400X800

400X800

400X700

400X700

400X600B10

B8A

B8

B6A

B6

B4A

B4

B3A

B3

B2

B1A

B1

BALOK

B10B

B12

B12A

B14

B14A

B14B

B14C

B16

B17

B17C

B18

B18A 300X500

300X600

300X600-500

300X600

500X1000

300X700

300X700

300X700-500

300X700

550X500

550X500

400X600

300X500

250X500

200X400

200X450B22

B20

B19

B18C

LEGEND :33650162540004000400040004000400040005650458443782147282560003700600016753775305001234567899'HGFEDCBAA'KL9KL9 B 1 8

B18(300X500)

B14(300X700)

T R N KT G - 0 3

B19(250X250)

B18(300

X

500)

B1

4

(300

X

700)

B18

B18(300

X

500)

B5

(700

X

5

00)B 1 2 B 1 2 B 1 4 A

B6A B18B1

4K6K6AK6K6K6K6AK6K6K6AK6K6AK6K6K6K6

B18B 1 2 ( 5 5 0 X 5 0 0 )

S 8 S 3S 3 S 7S 6 S 8S 8S 8S 8S 8 S 6S 6S 6S 6S 7 S 7S 7S 6S 1 S 3S 8S 8S 3 B 1 2 A ( 5 5 0 X 5 0 0 ) B 1 4 ( 3 0 0 X 7 0 0 ) B 1 4 ( 3 0 0 X 7 0 0 )

1

5

25

K 6 BK 6 K 6 BL T . 4 L T . 5 s / d 8 L T . 9 L T . 9 L T . 8 L T . 4 s / d 5K 6 B K 6K 6 B

B18A(300X

5

00)

B14(300

X

700)S F L F F L

+ 3 6 . 2 0 0 + 3 6 . 1 5 0 K 6K 6 AL T . 4 s / d 5 L T . 6 s / d 9 K 6 AK 6L T . 4 s / d 8 L T . 9 L T . 9 L T . 4 s / d 8K 6 BK 6 B 1 2 ( 5 5 0 X 5 0 0 )

B14(300x700)

B1(1400

X

400)B 1 2 ( 5 5 0 X 5 0 0 ) B 1 2 ( 5 5 0 X 5 0 0 ) B 1 4 ( E L . + 3 6 . 3 5 0 )

B 1 2 A ( 5 5 0 X 5 0 0 )1 2 0 08 6 51 0 3 55 8 523503 1 0 0

1300

23

5

0

167

5

20

2

5

2

0

5

0

2 1 5 0B 1 9 ( 2 5 0 X 5 0 0 )

B19B14AB 1 4 ( 3 0 0 X 7 0 0 ) B 1 4 B B 1 4 B 1 4

B14A

B14A

B14

(

300X700)

B14

(

300X700)

B14

(

300X700)

B14(300X700)B14(300X700)

B

14

(

30

0X700)

B

18

(

30

0X500) B 1 7 ( 3 0 0 X 6 0 0 ) B 1 7 ( 3 0 0 X 6 0 0 ) B 1 4 ( 3 0 0 X 7 0 0 ) K 3 K L 1 1 K L 1 1 K L 1 1TG-01 L P - 1 L P - 1 L P - 2N K T RB 1 4 CLT. 8 s/d 9LT. 4 s/d 7K11K11AK6K6ALT. 4 s/d 8LT. 9K6ALT. 9LT. 6 s/d 8LT. 4 s/d 5K6BK6DB17(300X600)

B

14

(3

00X

70

0)

B1

4K6K6K6

B

14A

B6(EL. +36.150 )B

14(

E

L

+36

.

35)B 1 9 ( 2 5 0 X 5 0 0 )

400B 1 4B 1 4 ( E L . + 3 6 . 3 5 0 ) B 1 4 ( 3 0 0 X 7 0 0 ) S F L F F L+ 3 6 4 0 0 + 3 6 3 5 0

B

17(300X600)

E

L

.

+35

.

35

B17(300X600) B 1 4 ( 3 0 0 X 7 0 0 ) B 1 4 ( 3 0 0 X 7 0 0 ) B 1 4 ( 3 0 0 X 7 0 0 ) B 1 9 ( 2 5 0 X 5 0 0 ) B 1 9 ( 2 5 0 X 5 0 0 ) B 1 9 ( 2 5 0 X 5 0 0 )B17A

B

17A

B

17A

B

17A

B

14A

B

14A

B

14A

B17(300X600)B17(300X600)

B

14

(300X700)P O N D A S I R O O F T A N K

Page 9: 0721074 Appendices

L1.7 Portal As C Lantai B2 s/d Lantai 5

101

Page 10: 0721074 Appendices

L1.8 Portal As C Lantai 6 s/d Lantai atap

102

Page 11: 0721074 Appendices

L1.9 Tabel Balok

103

Page 12: 0721074 Appendices

L1.10 Tabel Kolom

104

Page 13: 0721074 Appendices

L1.11 Tabel Kolom

105

Page 14: 0721074 Appendices
Page 15: 0721074 Appendices

Universitas Kristen Maranatha 107

LAMPIRAN II

BILL OF QUANTITY / RAB

L2.1 Daftar No.4 Pekerjaan Beton

Page 16: 0721074 Appendices

BILL OF QUANTITYPEKERJAAN STRUKTUR, ARSITEKTUR & PLUMBINGDAFTAR NO. 4. - PEKERJAAN BETON

NO SATVOL

Catatan Harga

I

II

III

IV

V

Diameter Kg/m6 mm 0.2228 mm 0.395

10 mm 0.61712 mm 0.88813 mm 1.04216 mm 1.57819 mm 2.22622 mm 2.98525 mm 3.85329 mm 5.18532 mm 6.313

URAIAN PEKERJAAN

Pekerjaan struktur beton sudah termasuk tanggul-tanggul,janggutan listplang seperti yang tergambar pada gambararsitektur.

Volume pembesian plat sudah termasuk pembesian balok semudi plat / bawah pasangan dinding batu bata.

Tabel berat yang dipakai dalam menghitung berat besi dalamDaftar ini, adalah :

Harga satuan beton sudah termasuk semua hal yang diperlukan ,seperti : additive, kubus beton, penyiraman (curing), sambungan-sambungan pemberhentian beton, pembuatan parit-parit,ketrikan/bobokan dan perbaikan untuk kerapihan hasil kerja, dansebagainya.

Harga satuan untuk pembesian sudah termasuk semua yangdiperlukan seperti : besi kaki ayam (kursi), penyokong, sisaterbuang (waste) kawat pengikat / bendraad dan sebagainya.

Perbedaan yang dikeluarkan oleh suatu pabrik yang lain untukdiameter yang sama menjadi tanggung jawab kontraktor.

HOTEL DAGO BANDUNG 108

Page 17: 0721074 Appendices

BILL OF QUANTITYPEKERJAAN STRUKTUR, ARSITEKTUR & PLUMBINGDAFTAR NO. 4. - PEKERJAAN BETON

NO SATVOLURAIAN PEKERJAAN

VI

VII

VIII

IX

X

XI

XIII

4.1. Lantai Kerja

1 Lantai kerja 50 mm, di bawah :a Lantai Basement 2 (include penebalan plat raft pondasi) m3 75.80

b Area prasarana luar (Provisional BQ) m3 2.84

4.1 - Dipindahkan ke Penjumlahan daftar 4

4.2. Beton

2 Beton K-350, pada :

a Pit lift m3 14.52

b Ground Water Tank m3 35.98

c saluran air (gutter) m3 2.50

d Dinding penutup secant pile sebagai dinding basemen m3 -

e m3 17.20

Harga satuan termasuk pembuatan blockout / lubang-lubangsparing, ventilasi pada lantai dan dinding.

Harga satuan bekisting (acuan) sudah termasuk juga semuaseperti : sparing, pembentukan sudut-sudut miring pada balok,ramp, skoor (balok penguat dan sebagainya).

Volume pembesian sudah termasuk perkuatan pada pinggirlubang-lubang sparing / ducting / sleeve / stek starter bar untukdinding bata pada lantai maupun dinding / kolom.

Pekerjaan yang dilaksanakan harus juga melihat ke gambararsitektur dan harus sesuai spesifikasi dari perencana. Bila tidakjelas dapat ditanyakan pada konsultan perencana.

Pondasi genset & Pondasi mesin (Provisional BQ) includingdinding pembatas genset.

Harga satuan waterproofing membrane maupun waterstop sudahtermasuk lapisan sambungan, tekukan, las-lasan maupun lassudut (kuantitas dihitung nett), fillet, semen, dan semua pekerjaanpersiapan dan perlengkapannya.

Volume lantai kerja dihitung netto ( tidak dikurangi dengan luaspondasi tiang / pile )

Harga satuan pekerjaan sudah termasuk alat-alat yang diperlukandan sesuai spesifikasi

HOTEL DAGO BANDUNG 109

Page 18: 0721074 Appendices

BILL OF QUANTITYPEKERJAAN STRUKTUR, ARSITEKTUR & PLUMBINGDAFTAR NO. 4. - PEKERJAAN BETON

NO SATVOLURAIAN PEKERJAAN

f STP (Provisional BQ) m3 6.92

g Area prasarana luar (Provisional BQ) m3 11.37

- Pondasi R.pompa m3 1.13

h Plat BETON K-3501 lantai basemen 2, tebal 800 - 1500mm / Raft pondation m3 1,354.12

2 Lantai basement 1 m3 87.013 Lantai 1 tebal 120 - 150 mm m3 113.564 Lantai Mezzanine tebal 120 mm m3 14.325 Lantai 2 tebal 120 mm m3 61.926 Lantai 3 tebal 120 mm m3 68.497 Lantai 4 tebal 120 & 170 mm m3 76.808 Lantai 5 tebal 120 & 170 mm m3 76.809 Lantai 6 tebal 120 & 170 mm m3 76.80

10 Lantai 7 tebal 120 & 170 mm m3 76.8011 Lantai 8 tebal 120 & 170 mm m3 76.8012 Lantai 9 tebal 120 & 170 mm m3 76.8013 Lantai 10 tebal 120 & 150 mm m3 76.7714 Lantai Atap penutup R. Mesin tebal 120 mm m3 20.02

i Shear Wall dan Core Wall K-500 & kolom1 lantai basemen 2, tebal 1000mm /Raft pondation m3 96.422 Lantai basement 1 m3 72.533 Lantai 1 tebal 120 - 150 mm m3 72.054 Lantai Mezzanine tebal 120 mm m3 72.90

5 Lantai 2 tebal 120 mm m3 26.086 Lantai 3 tebal 120 mm m3 41.267 Lantai 4 tebal 120 & 170 mm m3 34.488 Lantai 5 tebal 120 & 170 mm m3 34.249 Lantai 6 tebal 120 & 170 mm m3 34.24

10 Lantai 7 tebal 120 & 170 mm m3 34.2411 Lantai 8 tebal 120 & 170 mm m3 34.2412 Lantai 9 tebal 120 & 170 mm m3 34,2413 Lantai 10 tebal 120 & 150 mm m3 17,2014 Lantai Atap penutup R. Mesin tebal 120 mm m3 5.27

HOTEL DAGO BANDUNG 110

Page 19: 0721074 Appendices

BILL OF QUANTITYPEKERJAAN STRUKTUR, ARSITEKTUR & PLUMBINGDAFTAR NO. 4. - PEKERJAAN BETON

NO SATVOLURAIAN PEKERJAAN

j Balok K-3501 Lantai basement 1 m3 84.772 Lantai 1 m3 105.003 lantai Mezzanine m3 39.914 Lantai 2 m3 136.855 Lantai 3 m3 148.826 Lantai 4 m3 86.247 Lantai 5 m3 86.24

8 Lantai 6 m3 86.249 Lantai 7 m3 86.24

10 Lantai 8 m3 86.2411 Lantai 9 m3 86.2412 Lantai 10 m3 87.19

13 Lantai Atap R.Mesin m3 33.93

k Tangga termasuk balok & kolom tangga K-3501 lantai basemen 2 - basemen 1 m3 4.302 lantai basement 1- lantai 1 m3 2.403 lantai 1 - Mezz. m3 7.104 lower Mezzanine - lantai 2 m3 4.805 Lantai 2 - 3 m3 11.99

6 Lantai 3 - 4 m3 4.597 Lantai 4 - 5 m3 4.598 Lantai 5 - 6 m3 4.599 Lantai 6 - 7 m3 4.59

10 Lantai 7 - 8 m3 4.59

11 Lantai 8 - 9 m3 4.5912 Lantai 9 - 10 m3 5.28

HOTEL DAGO BANDUNG 111

Page 20: 0721074 Appendices

BILL OF QUANTITYPEKERJAAN STRUKTUR, ARSITEKTUR & PLUMBINGDAFTAR NO. 4. - PEKERJAAN BETON

NO SATVOLURAIAN PEKERJAAN

l Ramp (termasuk balok & plat)1 lantai basemen B1 - ke lantai 1 m3 81.372 Lantai 1- Jalan luar m3 4.35

4.2 - Dipindahkan ke Penjumlahan daftar 4

4.3. Pekerjaan Pembesian

3 Pembesian U-24 dan U-39, pada :

a Pit lift kg 2,100.00

b Ground Water Tank kg 3,979.54

c saluran air (gutter) kg 531.20

d Dinding penutup secant pile sebagai dinding basemen kg -

e Dinding & Pondasi genset & mesin kg 1,065.00

f Area prasarana luar kg 704.22

g STP kg 672.32pond r. pompa kg 383.00

- Sumpit 1-3 kg 426.05

h Plat K-350

1 lantai basemen 2 (Raft pondation) kg 127,287.002 Lantai basement 1 kg 12,994.003 Lantai 1 kg 16,987.154 lantai Mezzanine kg 1,833.465 Lantai 2 kg 7,975.436 Lantai 3 kg 7,112.797 Lantai 4 kg 8,517.798 Lantai 5 kg 8,517.799 Lantai 6 kg 8,517.79

10 Lantai 7 kg 8,517.7911 Lantai 8 kg 8,517.7912 Lantai 9 kg 8,517.7913 Lantai 10 kg 9,357.6214 Lantai Atap penutup R.Mesin kg 2,628.59

HOTEL DAGO BANDUNG 112

Page 21: 0721074 Appendices

BILL OF QUANTITYPEKERJAAN STRUKTUR, ARSITEKTUR & PLUMBINGDAFTAR NO. 4. - PEKERJAAN BETON

NO SATVOLURAIAN PEKERJAAN

i Shear Wall,kolom dan Core Wall1 lantai basemen 2, (Raft pondation) kg 25,076.722 Lantai basement 1 kg 23,535.313 Lantai 1 kg 18,536.654 Lantai Mezzanine kg 18,071.645 Lantai 2 kg 33,166.836 Lantai 3 kg 12,294.437 Lantai 4 kg 10,448.908 Lantai 5 kg 10,204.629 Lantai 6 kg 9,592.47

10 Lantai 7 kg 9,592.4711 Lantai 8 kg 9,592.4712 Lantai 9 kg 9,321.6613 Lantai 10 kg 10,048.6714 Lantai Atap R.Mesin kg 1,701.53

j Balok1 lantai basemen 1 kg 22,361.002 Lantai 1 kg 17,082.003 Lantai Mezzanine kg 6,387.214 Lantai 2 kg 28,015.005 Lantai 3 kg 29,224.006 Lantai 4 kg 15,588.007 Lantai 5 kg 15,588.008 Lantai 6 kg 15,588.009 Lantai 7 kg 15,588.00

10 Lantai 8 kg 15,588.0011 Lantai 9 kg 15,588.0012 Lantai 10 kg 18,379.8713 Lantai Penutup Atap R.Mesin kg 9,042.20

k Tangga termasuk balok & kolom tangga1 lantai basemen 2 - basemen 1 kg 737.842 lantai basement 1- lantai 1 kg 368.803 lantai 1 - Mezz. kg 1,039.004 lower Mezzanine - lantai 2 kg 693.005 Lantai 2 - 3 kg 1,703.006 Lantai 3 - 4 kg 686.007 Lantai 4 - 5 kg 686.008 Lantai 5 - 6 kg 686.009 Lantai 6 - 7 kg 686.00

10 Lantai 7 - 8 kg 686.0011 Lantai 8 - 9 kg 686.0012 Lantai 9 - 10 kg 767.75

HOTEL DAGO BANDUNG 113

Page 22: 0721074 Appendices

BILL OF QUANTITYPEKERJAAN STRUKTUR, ARSITEKTUR & PLUMBINGDAFTAR NO. 4. - PEKERJAAN BETON

NO SATVOLURAIAN PEKERJAAN

l Ramp1 Lantai basemen 2-1 kg 13,832.002 Lantai basement 1-ground floor kg 503.37

4.3 - Dipindahkan ke Penjumlahan daftar 4

4.4. Pekerjaan Acuan

4 Acuan, biasa pada :

a Area prasarana luar m2 59.12

Acuan, fairface pada :

a saluran air (gutter) m2 33.32

b Dinding penutup secant pile sebagai dinding basemen m2 -

c Pit lift m2 10.09

d Ground Water Tank m2 339.63

e Dinding & Pondasi genset & mesin m2 47.08

f STP- Pondasi R.Pompa m2 11.30- Sumpit 1-3 m2 84.38

g Plat1 Lantai basement 2 ( raft Foundation) m2 180.932 Lantai Basement 1 m2 770.593 lantai 1 m2 855.374 Lantai Mezzanine m2 138.875 Lantai 2 m2 541.336 Lantai 3 m2 705.857 Lantai 4 m2 559.758 Lantai 5 m2 559.759 Lantai 6 m2 559.75

10 Lantai 7 m2 559.7511 Lantai 8 m2 559.7512 Lantai 9 m2 559.7513 Lantai 10 m2 583.7514 Lantai Penutup Atap R.Mesin m2 334.89

HOTEL DAGO BANDUNG 114

Page 23: 0721074 Appendices

BILL OF QUANTITYPEKERJAAN STRUKTUR, ARSITEKTUR & PLUMBINGDAFTAR NO. 4. - PEKERJAAN BETON

NO SATVOLURAIAN PEKERJAAN

h Shear Wall,kolom dan Core Wall1 lantai basemen 2 m2 638.002 Lantai basement 1 m2 515.173 Lantai 1 m2 336.114 lantai Mezzanine m2 341.445 Lantai 2 m2 686.266 Lantai 3 m2 297.237 Lantai 4 m2 266.068 Lantai 5 m2 265.449 Lantai 6 m2 265.44

10 Lantai 7 m2 265.4411 Lantai 8 m2 265.4412 Lantai 9 m2 290.9913 Lantai 10 m2 311.9014 Lantai Atap penutup R.Mesin m2 47.52

i Balok1 Lantai basement 1 m2 469.752 Lantai 1 m2 601.383 lantai Mezzanine m2 157.654 Lantai 2 m2 621.905 Lantai 3 m2 651.526 Lantai 4 m2 361.087 Lantai 5 m2 361.088 Lantai 6 m2 361.089 Lantai 7 m2 361.08

10 Lantai 8 m2 361.0811 Lantai 9 m2 361.0812 Lantai 10 m2 501.7313 Lantai Penutup Atap R.Mesin m2 211.10

j Tangga termasuk balok & kolom tangga1 lantai basemen 2 - basemen 1 m2 36.262 lantai basement 1- ground floor m2 20.133 lantai ground floor - lower m2 52.054 lower - upper (Provisional BQ) m2 37.80

HOTEL DAGO BANDUNG 115

Page 24: 0721074 Appendices

BILL OF QUANTITYPEKERJAAN STRUKTUR, ARSITEKTUR & PLUMBINGDAFTAR NO. 4. - PEKERJAAN BETON

NO SATVOLURAIAN PEKERJAAN

5 Lantai 2 - 3 m2 103.576 Lantai 3 - 4 m2 36.827 Lantai 4 - 5 m2 36.828 Lantai 5 - 6 m2 36.829 Lantai 6 - 7 m2 36.82

10 Lantai 7 - 8 m2 36.8211 Lantai 8 - 9 m2 36.8212 Lantai 9 - 10 m2 40.23

k Ramp1 lantai basemen 1 ke Lantai 1 m2 729.672 Lantai 1 - ke jalan masuk utama m2 40.06

4.4 - Dipindahkan ke Penjumlahan daftar 4

4.5. Pekerjaan Lain-lain

1

a. Pit lift m3 42.66b plat lantai basemen 2 m3 1,518.02c Dinding penutup secant pile sebagai dinding basemen m3 172.00d Plat lantai Basement-1 m3 87.01e Plat lantai ground floor m3 113.56

2

a plat lantai kamar mandi & Toilet Mulai B1 - 10 m2 1,017.00

3 m2 455.94

10 m2 55.74

11 Water stop yang disetujui Pemberi Tugas pada:

a pada GWT m' 103.40b pada STP m' 34.82c. pada dinding lantai basemen m' 290.74

Waterproofing tangki air bagian dasar dan dinding

Waterproofing Sewage Treatment Plant (STP) bagian dasar dandinding dalam Coating

Waterproofing membrane termasuk di dinding, berikut lapisanscreed tebal 50 mm, lengkap dengan kawat ayam, pada :

Additive Waterproofing integral ex.Fosroc CONPLAST X421Matau setara yang disetujui Pemberi Tugas pada :

HOTEL DAGO BANDUNG 116

Page 25: 0721074 Appendices

BILL OF QUANTITYPEKERJAAN STRUKTUR, ARSITEKTUR & PLUMBINGDAFTAR NO. 4. - PEKERJAAN BETON

NO SATVOLURAIAN PEKERJAAN

4.5 - Dipindahkan ke Penjumlahan daftar 4

4.6. Pekerjaan Baja Sparator beam

Balok WF 200x200x5,5x8 kg

Base plate tebal 8mm kg

Chemical angkur 12 mm bh

Pengecatan zingcromate kg

Canopy Drop off ls 1.00

a m2 94.30WF 400x200x8x13 termasuk chemical angkur hilti dia.22 mm (harga belum termasuk chemical angkur

HOTEL DAGO BANDUNG 117

Page 26: 0721074 Appendices

BILL OF QUANTITYPEKERJAAN STRUKTUR, ARSITEKTUR & PLUMBINGDAFTAR NO. 4. - PEKERJAAN BETON

NO SATVOLURAIAN PEKERJAAN

4.1. Lantai Kerja

4.2. Beton

4.3. Pekerjaan Pembesian

4.4. Pekerjaan Acuan

4.5. Pekerjaan Lain-lain

4.6. Pekerjaan Baja Sparator beam

-

DIPINDAHKAN KE PENJUMLAHAN TOTAL

SUB PENJUMLAHAN DAFTAR NO. 4

HOTEL DAGO BANDUNG 118

Page 27: 0721074 Appendices

Universitas Kristen Maranatha 119

LAMPIRAN III

HASIL PERHITUNGAN BILL OF MATERIAL

L3.1 Perhitungan Volume Beton Pelat

L3.2 Perhitungan Volume Beton Balok

L3.3 Perhitungan Volume Beton Kolom

L3.4 Perhitungan Kebutuhan Tulangan Pelat per m3

L3.5 Perhitungan Kebutuhan Tulangan Balok per m3

L3.6 Perhitungan Kebutuhan Tulangan Kolom per m3

L3.7 Perhitungan Volume Tulangan Pelat

L3.8 Perhitungan Volume Tulangan Balok

L3.9 Perhitungan Volume Tulangan Kolom

Page 28: 0721074 Appendices

120

LAMPIRAN III

HASIL PERHITUNGAN BILLS OF MATERIALS

L3.1 Perhitungan Volume Beton Pelat

Hasil perhitungan volume beton pelat disederhanakan dengan lengkap dalam

Tabel L3.1 sebagai berikut:

Tabel L3.1 Perhitungan Volume Beton Pelat

TipePanjang Lebar Tebal Jml,

PanelVolume Sub

QuantityUnit Quantitiy

(+5%)Unit

(m) (m) (m) (m3)

Lantai 1S1 3,7 5,7 0,12 7 17,716

3,7 5,125 0,12 6 13,6532,95 4,672 0,12 1 1,6543,7 3,5 0,12 1 1,5540,9 2,6 0,12 1 0,2814 0,6 0,12 1 0,288

1,3 1,997 0,12 1 0,3123,7 4,05 0,12 1 1,798

5,35 5,7 0,12 1 3,659

1,75 1,725 0,12 2 0,725 41,639 m3

S2 3,7 3,4 0,12 5 7,5485,875 2,35 0,12 1 1,657

2,6 9,05 0,12 1 2,8242,7 3,95 0,12 1 1,280

4,584 3,65 0,12 1 2,0082,35 3,05 0,12 1 0,860

1,3 4,672 1,12 1 6,802 22,978 m3

Page 29: 0721074 Appendices

121

Tabel L3.1 Perhitungan Volume Beton Pelat (Lanjutan)

TipePanjang Lebar Tebal Jml,

PanelVolume Sub

QuantityUnit Quantitiy

(+5%)Unit

(m) (m) (m) (m3)

S3 2,35 15,6 0,12 1 4,3991,2 10 0,12 1 1,4401,6 2,9 0,12 1 0,5571 4,2 0,12 1 0,504

0,6 9,7 0,12 1 0,698

1,2 4,2 0,12 1 0,605 8,203 m3

S4 5,05 5,65 0,15 1 4,2803,65 4,622 0,15 2 5,0613,7 3,8 0,15 2 4,218

13,1 1,5 0,15 1 2,9487,3 3,15 0,15 1 3,4492,8 4,053 0,15 1 1,702

4,309 4,253 0,15 1 2,7493,7 1,5 0,15 1 0,833

3,8 1 0,15 1 0,570 25,809 m3

S5 1,45 7,725 0,15 1 1,680 1,680 m3

Total Kebutuhan Beton Pelat Lantai 1 100,310 m3 105,326 m3

Lantai MezzanineS1 3,3 5,05 0,12 1 2,000

5,35 6,9 0,12 1 4,430 6,430 m3

S2 2,46 6,9 0,12 1 2,0375,35 5,7 0,12 1 3,659

5,35 1,85 0,12 1 1,188 6,884 m3

S3 1,275 3,65 0,12 1 0,558

1,275 5,6 0,12 1 0,857 1,415 m3

Total Kebutuhan Beton Pelat Lantai Mezzanine 14,729 m3 15,465 m3

Page 30: 0721074 Appendices

122

Tabel L3.1 Perhitungan Volume Beton Pelat (Lanjutan)

TipePanjang Lebar Tebal Jml,

PanelVolume Sub

QuantityUnit Quantitiy

(+5%)Unit

(m) (m) (m) (m3)

Lantai 2S1 30,25 5,6 0,12 1 20,328

7,2 5,2 0,12 1 4,4933,5 5,6 0,12 1 2,3527,2 5,25 0,12 1 4,536

3,85 5,25 0,12 1 2,4265,05 2,8 0,12 1 1,6971,85 4,85 0,12 1 1,077

3,5 4,85 0,12 1 2,037 38,945 m3

S2 7,2 3 0,12 1 2,5927,2 3,3 0,12 1 2,851

3,55 3,4 0,12 1 1,448

S2 2,785 4,8 0,12 1 1,6042,655 13,775 0,12 1 4,389

5 2,65 0,12 1 1,590 14,474 m3

S3 3,7 1,025 0,12 5 2,2763,7 0,775 0,12 2 0,6884,9 1,025 0,12 1 0,603

1,225 5,7 0,12 1 0,8381,225 5,1 0,12 1 0,750

1,225 3,4 0,12 1 0,500 5,654 m3

Total Kebutuhan Beton Pelat Lantai 2 59,073 m3 62,027 m3

Page 31: 0721074 Appendices

123

Tabel L3.1 Perhitungan Volume Beton Pelat (Lanjutan)

TipePanjang Lebar Tebal Jml,

PanelVolume Sub

Quantity Unit Quantitiy(+5%) Unit

(m) (m) (m) (m3)

Lantai 3S1 30,25 5,6 0,12 1 20,328

19,75 5,65 0,12 1 13,391 33,719 m3

S2 24,95 3,3 0,12 1 9,8801,7 3,4 0,12 1 0,694

Void 0,85 0,5 0,12 -5 -0,2550,35 0,5 0,12 -2 -0,042

2,15 0,4 0,12 -1 -0,103 10,174 m3

S3 3,7 1,025 0,12 5 2,2763,7 0,775 0,12 2 0,6884,9 1,025 0,12 1 0,603

2,655 13,775 0,12 1 4,3891 4,5 0,12 1 0,540

1,225 14,2 0,12 1 2,087 10,583 m3

S11 12,35 4,85 0,12 1 7,1885,5 5,3 0,12 1 3,4984,7 5,3 0,12 1 2,989

1,3 3,8 0,12 1 0,593 14,268 m3

Total Kebutuhan Beton Pelat Lantai 3 68,742 m3 72,201 m3

Page 32: 0721074 Appendices

124

Tabel L3.1 Perhitungan Volume Beton Pelat (Lanjutan)

TipePanjang Lebar Tebal Jml,

PanelVolume Sub

Quantity Unit Quantitiy(+5%) Unit

(m) (m) (m) (m3)

Lantai 4 s/ 9S3 1,225 8,6 0,12 1 1,264

2,8 5,925 0,12 1 1,9911,6 3,6 0,12 1 0,691 3,946 m3

S6 26,8 5,575 0,17 1 25,4003,7 5,575 0,17 1 3,50715,4 5,575 0,17 1 14,595 43,502 m3

S7 23,45 2,9 0,17 1 11,5610,45 3,7 0,17 1 0,283

Void 0,85 0,5 0,12 -5 -0,2550,35 0,5 0,12 -2 -0,042

2,15 0,4 0,12 -1 -0,103 11,444 m3

S8 32,15 1,25 0,2 1 8,03817,65 1,2 0,2 1 4,2360,8 1,675 0,2 1 0,2682,8 1 0,2 1 0,56 13,1015 m3

Total Kebutuhan Beton Pelat Lantai 4 s/d 9 71,933 m3 75,593 m3

Page 33: 0721074 Appendices

125

Tabel L3.1 Perhitungan Volume Beton Pelat (Lanjutan)

TipePanjang Lebar Tebal Jml,

PanelVolume Sub

Quantity UnitQuantitiy

(+5%) Unit(m) (m) (m) (m3)

Lantai 10S3 1,225 8,6 0,12 1 1,264

2,8 5,925 0,12 1 1,9911,6 3,6 0,12 1 0,691 3,946 m3

S9 3,7 1,125 0,17 10 7,0765,1 1,225 0,17 1 1,062

1,175 3,4 0,17 1 0,6791,175 5,7 0,17 1 1,1393,4 1,125 0,17 10 6,5033,7 1,648 0,17 1 1,0372,86 2,366 0,17 1 1,150 18,645 m3

S10 3,7 3,35 0,12 7 10,4121,859 3,4 0,12 1 0,7583,731 5,7 0,12 1 2,5522,81 2,05 0,12 1 0,6912,81 2,201 0,12 1 0,742 15,156 m3

S11 3,7 5,7 0,12 7 17,716 17,716 m3

S12 3,65 5,6 0,15 1 3,0663,65 4,8 0,15 2 5,2561,95 5,6 0,15 1 1,6383,2 4,7 0,15 2 4,512

1,95 5,042 0,15 1 1,475 15,947 m3

Total Kebutuhan Beton Pelat Lantai 10 71,410 m3 74,980 m3

Page 34: 0721074 Appendices

126

L3.2 Perhitungan Volume Beton Balok

Hasil perhitungan volume beton balok disederhanakan dengan lengkap dalam

Tabel L3.2 sebagai berikut:

Tabel L3.2 Perhitungan Volume Beton Balok

TipeL

nVolume Sub

Quantity UnitQuantitiy

(+5%) Unit(m) (m3)

Lantai 1B4

0,7 X 0,5 4 2 2,800 2,800 m3

B80,4 X 0,7 8 2 4,480

7 1 1,960 6,440 m3

B100,4 X 0,6 9,35 3 6,732

2,6 1 0,624 7,356 m3

B10B

0,4 X 0,6 4 4 3,840 3,840 m3

B140,3 X 0,7 3,6 2 1,512

4,7 2 1,9742,55 3 1,6072,9 1 0,6094,4 2 1,848

3,775 1 0,793

4,378 1 0,919 9,262 m3

Page 35: 0721074 Appendices

127

Tabel L3.2 Perhitungan Volume Beton Balok (Lanjutan)

TipeL

nVolume Sub

Quantity Unit Quantitiy(+5%) Unit(m) (m3)

B170,3 X 0,6 5,4 1 0,972

2,8 3 1,5125,65 1 1,0179,65 1 1,7373,6 1 0,648

5,45 2 1,9626 4 4,3204 2 1,440

1,5 1 0,270 13,878 m3

B17B0,3 X 0,6 5 1 0,900

4 2 1,4408 4 5,760

6,8 1 1,2246,6 1 1,188

3 2 1,080 11,592 m3

B18

0,3 X 0,5 3,7 6 3,3303 1 0,4506 5 4,500

6,4 1 0,9604,2 1 0,630

5,65 1 0,8485 1 0,750

10,5 1 1,5755 2 1,500

6,5 1 0,975

Page 36: 0721074 Appendices

128

Tabel L3.2 Perhitungan Volume Beton Balok (Lanjutan)

TipeL

nVolume Sub

Quantity Unit Quantitiy(+5%) Unit(m) (m3)

B18 1,3 2 0,3900,3 X 0,5 9,7 1 1,455

6,25 1 0,9382,5 3 1,1254,4 1 0,660

5,45 2 1,6351,625 1 0,244

2 1 0,300 22,264 m3

B18A

0,3 X 0,5 9,35 2 2,805 2,805 m3

B190,25 X 0,5 30,209 1 3,776

6 1 0,75021,6 1 2,700

4 1 0,50024,6 1 3,07513,6 1 1,700

3 1 0,3751,625 1 0,20339,859 1 4,982

5,45 1 0,681 18,743 m3

B200,2 X 0,4 30,875 1 2,470

2 1 0,160 2,630 m3

Total Kebutuhan Beton Balok Lantai 1 101,609 m3 106,690 m3

Page 37: 0721074 Appendices

129

Tabel L3.2 Perhitungan Volume Beton Balok (Lanjutan)

TipeL

nVolume Sub

Quantity Unit Quantitiy(+5%) Unit(m) (m3)

Lantai MezannineB8

0,4 X 0,7 5,5 2 3,0806,4 1 1,7928 1 2,240

1,625 2 0,910

2,8 1 0,784 8,806 m3

B8A

0,4 X 0,7 5,5 1 1,540 1,540 m3

B140,3 X 0,7 4,7 2 1,974

2,55 3 1,6073,6 2 1,512

3 2 1,260 6,353 m3

B14A

0,3 X 0,7 1,625 1 0,341 0,341 m3

B170,3 X 0,6 4 2 1,440

5,5 1 0,9905,45 2 1,962

1,625 1 0,293 4,685 m3

B18

0,3 X 0,5 2,075 1 0,3117,6 1 1,140

5,45 1 0,81815,7 2 4,710

5 1 0,750

3 1 0,450 8,179 m3

Page 38: 0721074 Appendices

130

Tabel L3.2 Perhitungan Volume Beton Balok (Lanjutan)

TipeL

nVolume Sub

Quantity Unit Quantitiy(+5%) Unit(m) (m3)

B18C

0,3 X 0,5 15,7 1 2,355 2,355 m3

B20

0,2 X 0,4 7,3 1 0,5841,05 1 0,0845,5 1 0,4402,76 1 0,221

1,625 1 0,130 1,459 m3

Total Kebutuhan Beton Balok LantaiMezzanine

33,717 m3 35,403 m3

Lantai 2B2

0,9 X 0,5 8 2 7,200

1,625 1 0,731 7,931 m3

B3

0,7 X 1,5 9,2 2 19,320 19,320 m3

B3A0,7 X 1,5 6 2 12,600

5,4502 1 5,723 18,323 m3

B4

0,7 X 0,5 8 2 5,600 5,600 m3

B4A

0,7 X 0,5 1,525 1 0,534 0,534 m3

Page 39: 0721074 Appendices

131

Tabel L3.2 Perhitungan Volume Beton Balok (Lanjutan)

TipeL

nVolume Sub

Quantity Unit Quantitiy(+5%) Unit(m) (m3)

B6

0,4 X 0,8 8 2 5,1204 1 1,280

10,234 1 3,275

5 1 1,600 11,275 m3

B6A

0,4 X 0,8 6,9 1 2,2087,2 1 2,304

1,5 1 0,480 m3

8 2 5,120 10,112 m3

B8

0,4 X 0,7 5,65 1 1,582 1,582 m3

B8A0,4 X 0,7 8 2 4,480

4 1 1,120 5,600 m3

B140,3 X 0,7 10,5 1 2,205

6 1 1,2604,3 1 0,9033,2 1 0,672

2,55 3 1,6075 1 1,050

3,6 2 1,5123 2 1,260

6,4 1 1,344

5,45 1 1,145 12,957 m3

Page 40: 0721074 Appendices

132

Tabel L3.2 Perhitungan Volume Beton Balok (Lanjutan)

TipeL

nVolume Sub

Quantity Unit Quantitiy(+5%) Unit(m) (m3)

B14A

0,3 X 0,7 2,93 2 1,2311,525 3 0,961

2,93 3 1,846 4,037 m3

B14B0,3 X 0,7 2,8 2 1,176

4 1 0,840 2,016 m3

B14C

0,3 X 0,7 3,4 1 0,714 0,714 m3

B170,3 X 0,6 6 1 1,080

3,7 1 0,6663,775 1 0,680

4,4 1 0,792 3,218 m3

B17A

0,3 X 0,6 1,525 1 0,275 0,275 m3

B17C0,3 X 0,6 6 2 2,160

3,7 1 0,666 2,826 m3

B180,3 X 0,5 6 5 4,500

3,7 2 1,1105,65 1 0,848

5 1 0,7502,8 2 0,8405,7 1 0,855

1,525 2 0,4585,45 2 1,635

1,625 3 0,731 11,726 m3

Page 41: 0721074 Appendices

133

Tabel L3.2 Perhitungan Volume Beton Balok (Lanjutan)

TipeL

nVolume Sub

Quantity Unit Quantitiy(+5%) Unit(m) (m3)

B18A

0,3 X 0,5 6,3 1 0,945 0,945 m3

B190,25 X 0,5 33,65 1 4,206

2,93 1 0,3661,625 1 0,203

10,225 1 1,2786 2 1,500

3,7 1 0,46317 1 2,125

12,4 1 1,550

1,6 1 0,200 11,891 m3

Total Kebutuhan Beton Balok Lantai 2 130,881 m3 137,425 m3

Lantai 3B3

0,7 X 1,5 6 2 12,600

3,7 2 7,770 20,370 m3

B3A0,7 X 1,5 6 2 12,600

5,45 2 11,445 24,045 m3

B4

0,7 X 0,5 1,525 2 1,068 1,068 m3

B6

0,4 X 0,8 5,2 1 1,664 1,664 m3

B6A0,4 X 0,8 8 2 5,120

6,9 1 2,208 7,328 m3

Page 42: 0721074 Appendices

134

Tabel L3.2 Perhitungan Volume Beton Balok (Lanjutan)

TipeL

nVolume Sub

Quantity Unit Quantitiy(+5%) Unit(m) (m3)

B8A

0,4 X 0,7 7,3 1 2,044 2,044 m3

B140,3 X 0,7 6 3 3,780

5 2 2,1002,55 3 1,6076,5 1 1,365

10,234 1 2,1498 3 5,0404 2 1,680

1,625 1 0,3414,45 1 0,9353,775 1 0,7932,65 2 1,1132,8 1 0,588

4,5 1 0,945 22,435 m3

B14A0,3 X 0,7 3,182 3 2,005

1,625 3 1,024

1,525 3 0,961 3,989 m3

B14B0,3 X 0,7 8 8 13,440

4 1 0,8405,385 1 1,1316,8 1 1,428

3,8 1 0,798 17,637 m3

B14C

0,3 X 0,7 3,7 1 0,777

3,5 1 0,735 1,512 m3

Page 43: 0721074 Appendices

135

Tabel L3.2 Perhitungan Volume Beton Balok (Lanjutan)

TipeL

nVolume Sub

Quantity Unit Quantitiy(+5%) Unit(m) (m3)

B16

0,5 X 1 7,75 1 3,875 3,875 m3

B170,3 X 0,6 3,775 1 0,680

5,45 1 0,981 1,661 m3

B17A

0,3 X 0,6 1,625 1 0,293 0,293 m3

B180,3 X 0,5 6 7 6,300

3,7 3 1,66512 1 1,800

4,675 1 0,7016,25 1 0,9385,45 2 1,6353,8 1 0,570

1,525 4 0,915

3,3 1 0,495 15,019 m3

B190,25 X 0,5 33,65 1 4,206

3,182 1 0,3981,625 1 0,203

17 1 2,12512,4 1 1,5501,225 1 0,153

6 2 1,500

3,7 1 0,463 10,598 m3

B20

0,2 X 0,4 2,1 1 0,168 0,168 m3

Total Kebutuhan Beton Balok Lantai 3 133,704 m3 140,389 m3

Page 44: 0721074 Appendices

136

Tabel L3.2 Perhitungan Volume Beton Balok (Lanjutan)

TipeL

nVolume Sub

Quantity Unit Quantitiy(+5%) Unit(m) (m3)

Lantai 4 s/d 9B1

1,4 X 0,4 5,8 2 6,496 6,496 m3

B1A

1,4 X 0,4 6,4 1 3,584 3,584 m3

B4

0,7 X 0,5 3,7 1 1,295 1,295 m3

B12

0,55 X 0,5 8 9 19,8004 2 2,200

5,385 1 1,4812,8 1 0,770

1,625 3 1,341

3,135 2 1,724 27,316 m3

B12A

0,55 X 0,5 8 3 6,600 6,600 m3

B140,3 X 0,7 11 1 2,310

5 3 3,1502,55 3 1,6073,7 1 0,7772,8 2 1,176

3,775 1 0,7933,135 1 0,6581,9 1 0,399

1,525 1 0,320 11,190 m3

B14A

0,3 X 0,7 1,675 3 1,055 1,055 m3

Page 45: 0721074 Appendices

137

Tabel L3.2 Perhitungan Volume Beton Balok (Lanjutan)

TipeL

nVolume Sub

Quantity Unit Quantitiy(+5%) Unit(m) (m3)

B14B

0,3 X 0,7 2,975 1 0,625

3,1 1 0,651 1,276 m3

B14C

0,3 X 0,7 2,6 1 0,546 0,546 m3

B17

0,3 X 0,6 3,135 2 1,129 1,129 m3

B180,3 X 0,5 6 4 3,600

1,525 9 2,0593,7 1 0,555

3,775 1 0,566

3 2 0,900 7,680 m3

B18A

0,3 X 0,5 6 5 4,500 4,500 m3

B19

0,25 X 0,5 3,7 1 0,4636 1 0,750

1,8 1 0,225

6,65 1 0,831 2,269 m3

Total Kebutuhan Beton BalokLantai 4 s/d 9 74,935 m3 78,682 m3

Page 46: 0721074 Appendices

138

Tabel L3.2 Perhitungan Volume Beton Balok (Lanjutan)

TipeL

nVolume Sub

Quantity Unit Quantitiy(+5%) Unit(m) (m3)

Lantai 10B6

0,4 X 0,8 4 9 11,5206 2 3,840

1,81 1 0,579

3,028 1 0,969 16,908 m3

B6A

0,4 X 0,8 1,475 1 0,472 0,472 m3

B140,3 X 0,7 4 14 11,760

5,65 1 1,1876 6 7,560

3,7 3 2,331B14 2,951 1 0,620

0,3 X 0,7 6,503 1 1,3664,010 1 0,8424,525 1 0,9503,4 1 0,714

2,65 2 1,1131,9 1 0,399

2,45 3 1,544

4,675 2 1,964 32,348 m3

B14A

0,3 X 0,7 1,4 5 1,4701,475 2 0,620

1,675 3 1,055 3,145 m3

B14B

0,3 X 0,7 3,4 1 0,714 0,714 m3

Page 47: 0721074 Appendices

139

Tabel L3.2 Perhitungan Volume Beton Balok (Lanjutan)

TipeL

nVolume Sub

Quantity Unit Quantitiy(+5%) Unit(m) (m3)

B14C

0,3 X 0,7 2,6 1 0,546 0,546 m3

B170,3 X 0,6 6 7 7,560

3,7 4 2,6641,475 2 0,5311,81 1 0,326

2,95 1 0,531 11,612 m3

B17A

0,3 X 0,6 1,4 4 1,008 1,008 m3

B180,3 X 0,5 3,7 1 0,555

6 1 1,0805,45 2 1,9621,6 4 1,152

2,95 1 0,531 5,280 m3

B19

0,25 X 0,5 4 11 5,5003,135 1 0,3921,625 1 0,203

6,075 1 0,759 6,854 m3

Total Kebutuhan Beton Balok Lantai 10 78,888 m3 82,832 m3

Page 48: 0721074 Appendices

140

L3.3 Perhitungan Volume Beton Kolom

Hasil perhitungan volume beton kolom disederhanakan dengan lengkap dalam

Tabel L3.3 sebagai berikut:

Tabel L3.3 Perhitungan Volume Beton Kolom

Tipeb h Tinggi

nVolume Sub

Quantity UnitQuantitiy

(+5%) Unit(m) (m) (m) (m3)

Lantai 1K1 0,6 0,6 5,5 4 7,920K2 0,5 0,8 5,5 8 17,600K2A 0,5 0,8 5,5 9 19,800K3A 0,7 1,5 5,5 2 11,550K7B 0,7 0,8 5,5 4 12,320Total Kebutuhan Beton Kolom Lantai 1 69,190 m3 72,650 m3

Lantai2K1 0,6 0,6 6,5 2 4,680K1A 0,6 0,6 6,5 2 4,680K2 0,5 0,8 6,5 13 33,800K4 0,4 0,4 6,5 1 1,040K7A 0,7 0,8 6,5 3 10,920K7B 0,7 0,8 6,5 1 3,640K9 0,7 0,7 6,5 2 6,370

0,4 0,4 6,5 -2 -2,080K10B 0,4 0,75 6,5 2 3,900K11 0,8 0,8 6,5 2 8,320

0,5 0,5 6,5 -2 -3,250K11A 0,8 0,8 6,5 1 4,160

0,5 0,5 6,5 -1 -1,625Total Kebutuhan Beton Kolom Lantai 2 74,555 m3 78,283 m3

Page 49: 0721074 Appendices

141

Tabel L3.3 Perhitungan Volume Beton Kolom (Lanjutan)

Tipeb h Tinggi

nVolume Sub

Quantity Unit Quantity(+5%) Unit(m) (m) (m) (m3)

Lantai 3K3 0,5 0,5 3,2 1 0,800K9 0,7 0,7 3,2 2 3,136

0,4 0,4 3,2 -2 -1,024K10 0,4 0,75 3,2 13 12,480K10A 0,4 0,75 3,2 1 0,960K10B 0,4 0,75 3,2 4 3,840K11 0,8 0,8 3,2 3 6,144

0,5 0,5 3,2 -3 -2,400K15 0,2 0,2 3,2 12 1,536Total Kebutuhan Beton Kolom Lantai 3 25,472 m3 26,746 m3

Lantai 4K3 0,5 0,5 3,2 1 0,800K6 0,3 0,75 3,2 9 6,480K6A 0,3 0,75 3,2 3 2,160K6B 0,3 0,75 3,2 5 3,600K6D 0,3 0,75 3,2 1 0,720K9 0,7 0,7 3,2 2 3,136

0,4 0,4 3,2 -2 -1,024K11 0,8 0,8 3,2 2 4,096

0,5 0,5 3,2 -2 -1,600K11A 0,8 0,8 3,2 1 2,048

0,5 0,5 3,2 -1 -0,800Total Kebutuhan Beton Kolom Lantai 4 19,616 m3 20,597 m3

Page 50: 0721074 Appendices

142

Tabel L3.3 Perhitungan Volume Beton Kolom (Lanjutan)

Tipeb h Tinggi

nVolume Sub

Quantity Unit Quantity(+5%) Unit(m) (m) (m) (m3)

Lantai 5K3 0,5 0,5 3,2 1 0,800K6 0,3 0,75 3,2 11 7,920K6A 0,3 0,75 3,2 2 1,440K6B 0,3 0,75 3,2 4 2,880K6D 0,3 0,75 3,2 1 0,720K9 0,7 0,7 3,2 2 3,136

0,4 0,4 3,2 -2 -1,024K11 0,8 0,8 3,2 2 4,096

0,5 0,5 3,2 -2 -1,600K11A 0,8 0,8 3,2 1 2,048

0,5 0,5 3,2 -1 -0,800Total Kebutuhan Beton Kolom Lantai 5 19,616 m3 20,597 m3

Lantai 6K3 0,5 0,5 3,2 1 0,800K6 0,3 0,75 3,2 10 7,200K6A 0,3 0,75 3,2 5 3,600K6B 0,3 0,75 3,2 3 2,160K9 0,7 0,7 3,2 2 3,136

0,4 0,4 3,2 -2 -1,024K11 0,8 0,8 3,2 2 4,096

0,5 0,5 3,2 -2 -1,600K11A 0,8 0,8 3,2 1 2,048

0,5 0,5 3,2 -1 -0,800Total Kebutuhan Beton Kolom Lantai 6 19,616 m3 20,597 m3

Page 51: 0721074 Appendices

143

Tabel L3.3 Perhitungan Volume Beton Kolom (Lanjutan)

Tipeb h Tinggi

nVolume Sub

Quantity Unit Quantity(+5%) Unit(m) (m) (m) (m3)

Lantai 7K3 0,5 0,5 3,2 1 0,800K6 0,3 0,75 3,2 11 7,920K6A 0,3 0,75 3,2 6 4,320K6B 0,3 0,75 3,2 1 0,720K9 0,7 0,7 3,2 2 3,136

0,4 0,4 3,2 -2 -1,024K11 0,8 0,8 3,2 2 4,096

0,5 0,5 3,2 -2 -1,600K11A 0,8 0,8 3,2 1 2,048

0,5 0,5 3,2 -1 -0,800Total Kebutuhan Beton Kolom Lantai 7 19,616 m3 20,597 m3

Lantai 8K3 0,5 0,5 3,2 1 0,800K6 0,3 0,75 3,2 10 7,200K6A 0,3 0,75 3,2 7 5,040K6B 0,3 0,75 3,2 1 0,720K9 0,7 0,7 3,2 2 3,136

0,4 0,4 3,2 -2 -1,024K11 0,8 0,8 3,2 3 6,144

0,5 0,5 3,2 -3 -2,400Total Kebutuhan Beton Kolom Lantai 8 19,616 m3 20,597 m3

Lantai 9K3 0,5 0,5 3,2 1 0,800K6 0,3 0,75 3,2 5 3,600K6A 0,3 0,75 3,2 6 4,320K6B 0,3 0,75 3,2 6 4,320K6D 0,3 0,75 3,2 1 0,720K9 0,7 0,7 3,2 2 3,136

0,4 0,4 3,2 -2 -1,024K11 0,8 0,8 3,2 3 6,144

0,5 0,5 3,2 -3 -2,400Total Kebutuhan Beton Kolom Lantai 9 19,616 m3 20,597 m3

Page 52: 0721074 Appendices

144

Tabel L3.3 Perhitungan Volume Beton Kolom (Lanjutan)

Tipeb h Tinggi

nVolume Sub

Quantity Unit Quantity(+5%) Unit(m) (m) (m) (m3)

Lantai 10K3 0,5 0,5 3,2 1 0,800K6 0,3 0,75 3,2 4 2,880K6A 0,3 0,75 3,2 3 2,160K6B 0,3 0,75 3,2 1 0,720K9 0,7 0,7 3,2 2 3,136

0,4 0,4 3,2 -2 -1,024K11 0,8 0,8 3,2 4 8,192

0,5 0,5 3,2 -3 -2,400Total Kebutuhan Beton Kolom Lantai 10 14,464 m3 15,187 m3

Page 53: 0721074 Appendices

145

L3.4 Perhitungan Kebutuhan Tulangan Pelat per m3

Hasil perhitungan kebutuhan tulangan pelat per m3 disederhanakan dengan

lengkap dalam Tabel L3.4 sebagai berikut:

Page 54: 0721074 Appendices

146

Tabel L3.4 Perhitungan Kebutuhan Tulangan Pelat per m3

Keterangan Tipe Tulangan Pelat

PanjangTulangan

Total(m)

Berat Tulangan(Kg)

KebutuhanTulangan(kg/m3)10 13

0,617 1,042 10 13

Pelat S1 4.000 x 6.000

Ara

hPe

ndek

Tumpuan Lapangan

Tebal Pelat 120 mm Tipe Tulangan A A1 B1 C DVolume Beton 2,88 m3 Spasi (mm) 250 250 125 200 -

Lebar Balok Tepi 300 & 300 Derahpenulangan (mm)

925 925 3.850 3.850

Bentang bersih Panel: n 3,7 8 3,7 16 30,8 62 19,25 20

LN 5.700 mm Lper batang tulangan

(mm)4.000 1.260 1.260 4.000

SN 3.700 mm L total (m) 32 20,16 78,12 80 210,28

Panjang penyaluran dan daerahpenulangan:

Ara

hPa

njan

g

Tumpuan Lapangan0,125 SN 462,5 mm Tipe Tulangan E E1 F1 G H0,25 SN 925 mm Spasi (mm) 300 300 150 - 200

0,3 SN 1.110 mm Derahpenulangan (mm)

925 925 1.850 1.850

0,5 SN 1.850 mm n 3,083 8 3,083 16 12,333 26 9,25 10Lper batang tulangan

(mm)6.000 1.260 1.260 3.850

L total (m) 48 20,16 32,76 38,5 139,42Total Kebutuhan Besi Pelat S1 349,7Bengkokan dan Bahan Terbuang(5%) 367,19 226,55 78,664

Page 55: 0721074 Appendices

147

Tabel L3.4 Perhitungan Kebutuhan Tulangan Pelat per m3 (Lanjutan)

Keterangan Tipe Tulangan Pelat

PanjangTulangan

Total(m)

Berat Tulangan(Kg)

KebutuhanTulangan(kg/m3)10 13

0,617 1,042 10 13

Pelat S2 3.700 x 4.000A

rah

Pend

ekTumpuan Lapangan

Tebal Pelat 120 mm Tipe Tulangan A A1 B1 C D

Volume Beton 1,776 m3 Spasi 300 300 150 200 -

Lebar Balok Tepi 300 & 300Derahpenulangan (mm) 850 850 2.000 2.000

Bentang bersih Panel: n 2,833 6 2,833 12 13,333 28 10 10

LN 3.700 mm Lper batang tulangan(mm) 3.700 1.170 1.170 3.700

SN 3.400 mm L total (m) 22,2 14,04 32,76 37 106

Panjang penyaluran dan daerahpenulangan:

Ara

hPa

njan

g

Tumpuan Lapangan0,125 SN 425 mm Tipe Tulangan E E1 F1 G H0,25 SN 850 mm Spasi 200 - 150 - 200

0,3 SN 1.020 mm Derahpenulangan (mm)

850 1.700 1.700

0,5 SN 1.700 mm n 4,25 10 11,333 24 8,5 9Lper batang tulangan(mm) 4.000 1.170 2.000

L total (m) 40 28,08 18 86,08Total Kebutuhan Besi Pelat S2 192,08Bengkokan dan Bahan Terbuang(5%) 201,684 124,44 70,067

Page 56: 0721074 Appendices

148

Tabel L3.4 Perhitungan Kebutuhan Tulangan Pelat per m3 (Lanjutan)

Keterangan Tipe Tulangan Pelat

PanjangTulangan

Total(m)

Berat Tulangan(Kg)

KebutuhanTulangan(kg/m3)10 13

0,617 1,042 10 13

Pelat S3 2.600 x 3.000A

rah

Pend

ekTumpuan Lapangan

Tebal Pelat 120 mm Tipe Tulangan A A1 B1 C D

Volume Beton 0,936 m3 Spasi 200 - 200 200 -

Lebar Balok Tepi 250 & 250 Derahpenulangan (mm) 587,5 1575 1575

Bentang bersih Panel: n 2,938 6 7,875 16 7,875 8

LN 2.750 mm Lper batang tulangan(mm) 2.600 830 2.600

SN 2.350 mm L total (m) 15,6 13,28 20,8 49,68

Panjang penyaluran dan daerahpenulangan:

Ara

hPa

njan

g

Tumpuan Lapangan0,125 SN 293,8 mm Tipe Tulangan E E1 F1 G H0,25 SN 587,5 mm Spasi 200 - 200 - 200

0,3 SN 705 mm Derahpenulangan (mm)

587,5 1.175 1.175

0,5 SN 1.175 mm n 2,938 6 5,875 12 5,875 6Lper batang tulangan(mm) 3.000 830 1.575

L total (m) 18 9,96 9,45 37,41

Total Kebutuhan Besi Pelat S3 87,09Bengkokan dan Bahan Terbuang(5%)

91,445 56,421 60,279

Page 57: 0721074 Appendices

149

Tabel L3.4 Perhitungan Kebutuhan Tulangan Pelat per m3 (Lanjutan)

Keterangan Tipe Tulangan Pelat

PanjangTulangan

Total(m)

Berat Tulangan(Kg)

KebutuhanTulangan(kg/m3)10 13

0,617 1,04 10 13

Pelat S4 4.000 x 4.972A

rah

Pend

ekTumpuan Lapangan

Tebal Pelat 150 mm Tipe Tulangan A A1 B1 C D

Volume Beton 2,983 m3 Spasi 250 250 125 250 250

Lebar Balok Tepi 300 & 400 Derahpenulangan (mm) 912,5 912,5 2.797 2.797 2.797

Bentang bersih Panel: n 3,65 8 3,65 16 22,376 46 11,188 12 11,188 12

LN 4.622 mm Lper batang tulangan(mm) 4.000 1.295 1.295 4.000 2.737,5

SN 3.650 mm L total (m) 32 20,72 59,57 48 32,85 193,14

Panjang penyaluran dan daerahpenulangan:

Ara

hPa

njan

g

Tumpuan Lapangan0,125 SN 456,3 mm Tipe Tulangan E E1 F1 G H0,25 SN 912,5 mm Spasi 250 250 125 250 250

0,3 SN 1.095 mm Derahpenulangan (mm) 912,5 912,5 1.825 1.825 1.825

0,5 SN 1.825 mm n 3,65 8 3,65 16 14,6 30 7,3 8 7,3 8Lper batang tulangan(mm) 4.972 1.295 1.295 4.972 2.797

L total (m) 39,78 20,72 38,85 39,78 22,38 161,498

Total Kebutuhan Besi Pelat S4 354,638Bengkokan dan Bahan Terbuang(5%) 372,370 387,26 129,815

Page 58: 0721074 Appendices

150

Tabel L3.4 Perhitungan Kebutuhan Tulangan Pelat per m3 (Lanjutan)

Keterangan Tipe Tulangan Pelat

PanjangTulangan

Total(m)

Berat Tulangan(Kg)

KebutuhanTulangan(kg/m3)10 13

0,617 1,04 10 13

Pelat S5 1.800 x 4.378A

rah

Pend

ekTumpuan Lapangan

Tebal Pelat 150 mm Tipe Tulangan A A1 B1 C DVolume Beton 1,182 m3 Spasi 250 250 125 200 400

Lebar Balok Tepi

Arah pendekDerahpenulangan (mm) 362,5 362,5 3.378 3.378 3.378

300 & 400Arah panjang

250 & 300Bentang bersih Panel: n 1,45 4 1,45 8 27,024 56 16,89 17 8,445 9

LN 4.103 mm Lper batang tulangan(mm) 1.800 635 635 1.800 1.087,5

SN 1.450 mm L total (m) 7,2 5,08 35,56 30,6 9,79 88,23

Panjang penyaluran dan daerahpenulangan:

Ara

hPa

njan

g

Tumpuan Lapangan0,125 SN 181,3 mm Tipe Tulangan E E1 F1 G H0,25 SN 362,5 mm Spasi 250 250 125 - 200

0,3 SN 435 mm Derahpenulangan (mm)

362,5 362,5 725 725

0,5 SN 725 mm n 1,45 4 1,45 8 5,8 12 3,625 4Lper batang tulangan (mm) 4378 585 585 3.378L total (m) 17,51 4,68 7,02 13,51 42,72

Total Kebutuhan Besi Pelat S5 130,95Bengkokan dan Bahan Terbuang(5%)

137,499 84,837 71,770

Page 59: 0721074 Appendices

151

Tabel L3.4 Perhitungan Kebutuhan Tulangan Pelat per m3 (Lanjutan)

Keterangan Tipe Tulangan Pelat

PanjangTulangan

Total(m)

Berat Tulangan(Kg)

KebutuhanTulangan(kg/m3)10 13

0,617 1,04 10 13

Pelat S6 4.000 x 6.000

Ara

hPe

ndek

Tumpuan Lapangan

Tebal Pelat 170 mm Tipe Tulangan A A1 B1 C DVolume Beton 4,08 m3 Spasi 200 200 100 200 400

Lebar Balok Tepi

Arah pendek

Derahpenulangan (mm) 962,5 962,5 3.525 3.525 3.525

300Arah panjang

550 & 550Bentang bersih Panel: n 4,81 10 4,81 20 35,25 72 17,625 18 8,81 9LN 5.450 mm Lper batang tulangan (mm) 4.000 1.305 1.305 4.000 2.887,5

SN 3.850 mm L total (m) 40 26,1 93,96 72 26 258,048

Panjang penyaluran dan daerahpenulangan:

Ara

hPa

njan

g

Tumpuan Lapangan0,125 SN 481,3 mm Tipe Tulangan E E1 F1 G H0,25 SN 962,5 mm Spasi 250 250 125 - 200

0,3 SN 1.155 mmDerahpenulangan (mm) 962,5 962,5 1.925 1.925

0,5 SN 1.925 mm n 3,85 8 3,85 16 15,4 32 9,625 10Lper batang tulangan (mm) 6.000 1.305 1.305 3.525

L total (m) 48 20,88 41,76 35,25 145,89

Total Kebutuhan Besi Pelat S6 403,94Bengkokan dan Bahan Terbuang(5%) 424,134 261,69 64,140

Page 60: 0721074 Appendices

152

Tabel L3.4 Perhitungan Kebutuhan Tulangan Pelat per m3 (Lanjutan)

Keterangan Tipe Tulangan Pelat

PanjangTulangan

Total(m)

Berat Tulangan(Kg)

KebutuhanTulangan(kg/m3)10 13

0,617 1,04 10 13

Pelat S7 3.700 x 8.000

Ara

hPe

ndek

Tumpuan Lapangan

Tebal Pelat 170 mm Tipe Tulangan A A1 B1 C DVolume Beton 5,032 m3 Spasi 300 300 150 200 -

Lebar Balok Tepi

Arah pendekDerahpenulangan (mm)

550 & 550 787,5 787,5 5.025 5.025Arah panjang

1.400 & 1.400Bentang bersih Panel: n 2,625 6 2,625 12 33,5 68 25,125 26

LN 6.600 mm Lper batang tulangan

(mm) 3.700 1.220 1.220 3.700

SN 3.150 mm L total (m) 22,2 14,64 82,96 96,2 216,000

Panjang penyaluran dan daerahpenulangan:

Ara

hP

anja

ng

Tumpuan Lapangan0,125 SN 393,8 mm Tipe Tulangan E E1 F1 G H0,25 SN 787,5 mm Spasi 250 300 200 - 200

0,3 SN 945 mm Derahpenulangan (mm) 787,5 787,5 1.575 1.575

0,5 SN 1.575 mm n 3,15 8 2,625 12 7,875 16 7,875 8

Lper batang tulangan (mm) 8.000 1.645 1.645 5.025

L total (m) 64 19,74 26,32 40,2 150,260

Total Kebutuhan Besi Pelat S7 366,260Bengkokan dan Bahan Terbuang(5%)

384,573 237,28 47,155

Page 61: 0721074 Appendices

153

Tabel L3.4 Perhitungan Kebutuhan Tulangan Pelat per m3 (Lanjutan)

Keterangan Tipe Tulangan Pelat

PanjangTulangan

Total(m)

Berat Tulangan(Kg)

KebutuhanTulangan(kg/m3)10 13

0,617 1,04 10 13

Pelat S8 1.475 x 4.000

Ara

hPe

ndek

Tumpuan Lapangan

Tebal Pelat 200 mm Tipe Tulangan A A1 B1 C DVolume Beton 1,18 m3 Spasi 400 400 200 200 -

Lebar Balok Tepi(mm)

Arah pendekDerahpenulangan (mm)

550 300 300 3.100 3.100Arah panjang

300 & 300Bentang bersih Panel: n 0,75 2 0,75 4 15,5 32 15,5 16

LN 3.700 mm Lper batang tulangan

(mm) 1.475 635 635 1.475

SN 1.200 mm L total (m) 2,95 2,54 20,32 23,6 49,410

Panjang penyaluran dan daerahpenulangan:

Ara

hP

anja

ng

Tumpuan Lapangan0,125 SN 150 mm Tipe Tulangan E E1 F1 G H0,25 SN 300 mm Spasi 400 400 200 - 200

0,3 SN 360 mm Derahpenulangan (mm) 300 300 600 600

0,5 SN 600 mm n 0,75 2 0,75 4 3 6 3 3

Lper batang tulangan (mm) 4.000 510 510 3.100

L total (m) 8 2,04 3,06 9,3 22,400

Total Kebutuhan Besi Pelat S8 71,810Bengkokan dan Bahan Terbuang(5%)

75,401 46,522 39,426

Page 62: 0721074 Appendices

154

Tabel L3.4 Perhitungan Kebutuhan Tulangan Pelat per m3 (Lanjutan)

Keterangan Tipe Tulangan Pelat

PanjangTulangan

Total(m)

Berat Tulangan(Kg)

KebutuhanTulangan(kg/m3)10 13

0,617 1,04 10 13

Pelat S9 1.400 x 4.000

Ara

hPe

ndek

Tumpuan Lapangan

Tebal Pelat 170 mm Tipe Tulangan A A1 B1 C DVolume Beton 0,952 m3 Spasi 300 300 150 200 -

Lebar Balok Tepi

Arah pendek

Derah penulangan 281,3 281,25 3.137,5 3.137,5250 & 300

Arah panjang300 & 300

Bentang bersih Panel: n 0,938 2 0,938 4 20,917 42 15,688 16

LN 3.700 mm Lper batang tulangan

(mm) 1.400 487,5 487,5 1.400

SN 1.125 mm L total (m) 2,8 1,95 20,47 22,4 47,625

Panjang penyaluran dan daerahpenulangan:

Ara

hPa

njan

g

Tumpuan Lapangan0,125 SN 140,6 mm Tipe Tulangan E E1 F1 G H0,25 SN 281,3 mm Spasi 200 - 200 - 200

0,3 SN 337,5 mm Derahpenulangan (mm)

281,3 562,5 562,5

0,5 SN 562,5 mm n 1,406 4 2,81 6 2,8125 3Lper batang tulangan (mm) 4.000 487,5 3.137,5

L total (m) 16 2,925 9,412 28,338

Total Kebutuhan Besi Pelat S9 75,963Bengkokan dan Bahan Terbuang(5%) 79,761 49,212 51,694

Page 63: 0721074 Appendices

155

Tabel L3.4 Perhitungan Kebutuhan Tulangan Pelat per m3 (Lanjutan)

Keterangan Tipe Tulangan Pelat

PanjangTulangan

Total(m)

Berat Tulangan(Kg)

KebutuhanTulangan(kg/m3)10 13

0,617 1,04 10 13

Pelat S10 3.700 x 4.000

Ara

hPe

ndek

Tumpuan Lapangan

Tebal Pelat 120 mm Tipe Tulangan A A1 B1 C DVolume Beton 1,776 m3 Spasi 200 - 200 200 -

Lebar Balok Tepi

Arah pendekDerahpenulangan (mm) 837,5 2.025 2.025

300 & 400Arah panjang

300 & 300Bentang bersih Panel: n 4,188 10 10,125 22 10,125 11

LN 3.700 mm Lper batang tulangan

(mm) 3.700 1.205 3.700

SN 3.350 mm L total (m) 37 26,51 40,7 104,210

Panjang penyaluran dan daerahpenulangan:

Ara

hP

anja

ng

Tumpuan Lapangan0,125 SN 418,8 mm Tipe Tulangan E E1 F1 G H0,25 SN 837,5 mm Spasi 200 - 200 - 200

0,3 SN 1.005 mm Derahpenulangan (mm) 837,5 1.675 1.675

0,5 SN 1.675 mm n 4,188 10 8,375 18 8,375 9

Lper batang tulangan (mm) 4.000 1.155 2.025

L total (m) 40 20,79 18,22 79,015

Total Kebutuhan Besi Pelat S10 183,225Bengkokan dan Bahan Terbuang(5%)

192,386 118,7 66,837

Page 64: 0721074 Appendices

156

Tabel L3.4 Perhitungan Kebutuhan Tulangan Pelat per m3 (Lanjutan)

Keterangan Tipe Tulangan Pelat

PanjangTulangan

Total(m)

Berat Tulangan(Kg)

KebutuhanTulangan(kg/m3)10 13

0,617 1,04 10 13

Pelat S11 4.000 x 6.000

Ara

hPe

ndek

Tumpuan Lapangan

Tebal Pelat 120 mm Tipe Tulangan A A1 B1 C DVolume Beton 2,88 m3 Spasi 200 - 200 200 -

Lebar Balok Tepi 300 & 300 Derahpenulangan (mm) 925 3.850 3.850

Bentang bersih Panel: n 4,625 10 19,25 40 19,25 20

LN 5.700 mm Lper batang tulangan(mm) 4.000 1.260 4.000

SN 3.700 mm L total (m) 40 50,4 80 170,400

Panjang penyaluran dan daerahpenulangan:

Ara

hPa

njan

g

Tumpuan Lapangan0,125 SN 462,5 mm Tipe Tulangan E E1 F1 G H0,25 SN 925 mm Spasi 250 - 250 - 200

0,3 SN 1.110 mm Derahpenulangan (mm)

925 1.850 1.850

0,5 SN 1.850 mm n 3,7 8 7,4 16 9,25 10Lper batang tulangan(mm) 6.000 1.260 3.850

L total (m) 48 20,16 38,5 106,660

Total Kebutuhan Besi Pelat S11 277,060Bengkokan dan Bahan Terbuang(5%) 290,913 179,49 62,324

Page 65: 0721074 Appendices

157

Tabel L3.4 Perhitungan Kebutuhan Tulangan Pelat per m3 (Lanjutan)

Keterangan Tipe Tulangan Pelat

PanjangTulangan

Total(m)

Berat Tulangan(Kg)

KebutuhanTulangan(kg/m3)10 13

0,617 1,04 10 13

Pelat S12 4.000 x 6.000

Ara

hPe

ndek

Tumpuan Lapangan

Tebal Pelat 170 mm Tipe Tulangan A A1 B1 C DVolume Beton 4,08 m3 Spasi 200 200 100 200 400

Lebar Balok Tepi

Arah pendekDerahpenulangan (mm) 912,5 912,5 3.775 3.775 3.775

300 & 400Arah panjang

400 & 400Bentang bersih Panel: n 4,563 10 4,563 20 37,75 76 18,875 19 9,4375 10

LN 5.600 mm Lper batang tulangan

(mm) 4.000 1.295 1.295 4.000 2.737,5

SN 3.650 mm L total (m) 40 25,9 98,42 76 27,37 267,695

Panjang penyaluran dan daerahpenulangan:

Ara

hPa

njan

g

Tumpuan Lapangan0,125 SN 456,3 mm Tipe Tulangan E E1 F1 G H0,25 SN 912,5 mm Spasi 250 250 125 - 200

0,3 SN 1.095 mm Derahpenulangan (mm)

912,5 912,5 1.825 1.825

0,5 SN 1.825 mm n 3,65 8 3,65 16 14,6 30 9,125 10Lper batang tulangan (mm) 6.000 1.295 1.295 3.775

L total (m) 48 20,72 38,85 37,75 145,320

Total Kebutuhan Besi Pelat S12 413,015Bengkokan dan Bahan Terbuang(5%) 433,666 267,57 65,581

Page 66: 0721074 Appendices

158

L3.5 Perhitungan Kebutuhan Tulangan Balok per m3

Hasil perhitungan kebutuhan tulangan Balok per m3 disederhanakan dengan

lengkap dalam Tabel L3.5 sebagai berikut:

Page 67: 0721074 Appendices

159

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B1 1.400x400 5,85Vol.Beton 3,276 m3

Tum

puan

Kir

i Tul. Atas 20D22 20 1,463 29,250 87,311Tul. Bawah 9D22 9 1,463 13,163 39,29Tul. Pinggang -

Tul. Sengkang2,5D10 -

100 1,463 0,1 15 8,400 126,00 77,742Tul. Kait -

Lap

anga

n

Tul. Atas 5D22 5 2,925 14,625 43,656Tul. Bawah 5D22 5 2,925 14,625 43,656

Tul. Pinggang -

Tul. Sengkang 2D10-100 2,925 0,1 30 6,720 201,60 124,387Tul. Kait -

Tum

puan

Kan

an Tul. Atas 10D22 10 1,463 14,625 43,656Tul. Bawah 15D22 15 1,463 21,938 65,483

Tul. Pinggang-

Tul. Sengkang 2D10-100 1,463 0,1 15 6,720 100,80 62,194Tul. Kait -

Total Kebutuhan Besi BalokB1 264,32 323,05Bengkokan dan BahanTerbuang (10%) 290,76 355,36 88,753 108,473

Page 68: 0721074 Appendices

160

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B2 900x500 8Vol. Beton 3,6m3

Tum

puan

Kir

i Tul. Atas 14D22 14 2,000 28 83,58Tul. Bawah 5D22 5 2,000 10 29,85Tul. Pinggang -Tul. Sengkang 1,5D10 -100 2 0,1 20 3,840 76,8 47,386Tul. Kait -

Lap

anga

n

Tul. Atas 5D22 5 4,000 20 59,7Tul. Bawah 5D22 5 4,000 20 59,7Tul. Pinggang -

Tul. Sengkang 1,5D10-100 4 0,1 40 3,840 153,6 94,771Tul. Kait -

Tum

puan

Kan

an Tul. Atas 12D22 12 2,000 24 71,64Tul. Bawah 5D22 5 2,000 10 29,85

Tul. Pinggang -

Tul. Sengkang 1,5D10-100 2 0,1 20 3,840 76,8 47,386

Tul. Kait -Total Kebutuhan Besi BalokB2 189,54 334,32Bengkokan dan BahanTerbuang (10%) 208,5 367,75 57,916 102,153

Page 69: 0721074 Appendices

161

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B3 700x1.500 9,2Vol. Beton 9,66m3

Tum

puan

Kir

i Tul. Atas 18D22 18 2,300 41,400 123,58Tul. Bawah 12D22 12 2,300 27,600 82,386Tul. Pinggang 6D10 6 2,300 13,800 8,515Tul.Sengkang 2,5D13-150 2,3 0,15 16 10,400 166,400 173,39

Tul. Kait 3D10 -1.000 2,3 1 3 1,920 5,760 3,554

Lap

anga

n

Tul. Atas 8D22 8 4,600 36,800 109,85Tul. Bawah 32D22 32 4,600 147,200 439,39Tul. Pinggang 6D10 6 2,300 13,800 8,515Tul.Sengkang 2,5D13-100 4,6 0,1 46 10,400 478,400 498,49

Tul. Kait 3D10 -1.000 4,6 1 5 1,920 9,600 5,923

Tum

puan

Kan

an Tul. Atas 12D22 12 2,300 27,600 82,386Tul Bawah 5D22 5 2,300 11,500 34,328Tul. Pinggang 6D10 6 2,300 13,800 8,515Tul.Sengkang

1,5D13-100 2,3 0,1 23 6,240 143,52 149,55

Tul. Kait 3D10 -1.000 2,3 1 3 1,920 5,760 3,554Total Kebutuhan Besi Balok B3 38,575 821,43 871,92Bengkokan dan Bahan Terbuang(10%) 42,432 903,57 959,11 4,393 93,538 99,287

Page 70: 0721074 Appendices

162

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang

Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

mm

m m m 0,617 1,042 1,5782,22

6 2,98510 13 16 19 22

Balok B3A 700x1.500 6Vol. Beton 5,46m3

Tum

puan

Kir

i Tul. Atas 12D22 12 1,500 18,00 53,73Tul. Bawah 6D22 6 1,500 9,00 26,865Tul. Pinggang 4D10 4 1,500 6,00 3,702Tul. Sengkang 1,5D13-150 1,5 0,15 10 6,240 62,40 65,021Tul. Kait 3D10 -1.000 1,5 1 2 1,920 3,84 2,369

Lap

anga

n

Tul. Atas 9D22 9 3,000 27,00 80,595Tul. Bawah 6D22 6 3,000 18,00 53,73Tul. Pinggang 4D10 4 1,500 6,00 3,702Tul. Sengkang 1,5D13-100 3 0,1 30 6,240 187,20 195,06Tul. Kait 3D10 -1.000 3 1 3 1,920 5,760 3,554

Balok B3A 700x700

Tum

puan

Kan

an Tul. Atas 9D22 9 1,500 13,50 40,298Tul. Bawah 6D22 6 1,500 9,00 26,865

Tul. Pinggang 2D10 2 1,500 3,00 1,851

Tul. Sengkang 1,5D13-100 1,5 0,1 15 3,840 57,60 60,019

Tul. Kait 3D10 -1.000 1,5 1 2 1,920 3,84 2,369Total Kebutuhan Besi Balok B3A 17,55 320,1 282,1Bengkokan dan Bahan Terbuang(10%) 19,3 352,1 310,3 3,535 64,489 56,83

Page 71: 0721074 Appendices

163

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B4 700x500 4Vol. Beton 1,4m3

Tum

puan

Kir

i Tul. Atas 13D22 13 1,000 13,000 38,805Tul. Bawah 5D22 5 1,000 5,000 14,925Tul. Pinggang -

Tul. Sengkang 1D10-150 1 0,15 7 2,160 15,120 9,329Tul. Kait 1D10 -1.000 1 1 1 0,440 0,440 0,271

Lap

anga

n

Tul. Atas 5D22 5 2,000 10,000 29,85Tul. Bawah 7D22 7 2,000 14,000 41,79Tul. Pinggang -Tul. Sengkang 1D10-200 2 0,2 10 2,160 21,600 13,327Tul. Kait 1D10 -1.000 2 1 2 0,440 0,880 0,543

Tu

mpu

anK

anan Tul. Atas 10D22 10 1,000 10,000 29,85

Tul. Bawah 5D22 5 1,000 5,000 14,925

Tul. Pinggang -

Tul. Sengkang 1D10-150 1 0,15 7 2,160 15,120 9,329

Tul. Kait 1D10 -1.000 1 1 1 0,440 0,440 0,271Total Kebutuhan Besi Balok B4 33,07 170,1Bengkokan dan Bahan Terbuang(10%) 36,38 187,2 25,985 133,685

Page 72: 0721074 Appendices

164

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B4A 500x700 1,525Vol. Beton 0,4956 m3

Tum

puan

Tul. Atas 6D22 6 0,381 2,288 6,8282Tul. Bawah 6D22 6 0,381 2,288 6,8282Tul. Pinggang 2D10 2 0,381 0,763 0,470Tul. Sengkang 1D10-150 0,38125 0,15 3 2,160 6,480 3,998Tul. Kait 1D10 -1.000 0,38125 1 1 0,440 0,440 0,271

Balok B4A 500x500

Uju

ng

Tul. Atas 4D22 4 0,381 1,525 4,5521Tul. Bawah 3D22 3 0,381 1,144 3,4141

Tul. Pinggang -

Tul. Sengkang 1D10-200 0,38125 0,2 2 1,760 3,520 2,172

Tul. Kait -

Total Kebutuhan Besi Balok B4A 6,912 21,62Bengkokan dan Bahan Terbuang(10%) 7,603 23,78 15,341 47,990

Page 73: 0721074 Appendices

165

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B6 400x800 8Vol. Beton 2,56m3

Tum

puan

Kir

i Tul. Atas 7D22 7 2,000 14,000 41,79Tul. Bawah 3D22 3 2,000 6,000 17,91Tul. Pinggang 2D10 2 2,000 4,000 2,468Tul. Sengkang 1,5D10-100 2 0,1 20 3,240 64,800 39,982Tul. Kait 1D10 -1.000 2 1 2 0,340 0,680 0,420

Lap

anga

n

Tul Atas 3D22 3 4,000 12,000 35,82Tul. Bawah 7D22 7 4,000 28,000 83,58Tul. Pinggang 2D10 2 2,000 4,000 2,468Tul. Sengkang 1,5D10-150 4 0,15 27 3,240 87,480 53,975Tul. Kait 1D10 -1.000 4 1 4 0,340 1,360 0,839

Tum

puan

Kan

an Tul. Atas 7D22 7 2,000 14,000 41,79Tul. Bawah 3D22 3 2,000 6,000 17,91

Tul. Pinggang 2D10 2 2,000 4,000 2,468

Tul. Sengkang 1,5D10-100 2 0,1 20 2,880 57,600 35,539

Tul. Kait 1D10 -1.000 2 1 2 0,340 0,680 0,420Total Kebutuhan Besi Balok B6 138,6 238,8Bengkokan dan Bahan Terbuang(10%) 152,4 262,7 59,545 102,609

Page 74: 0721074 Appendices

166

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B8B 300x700 5,8Vol. Beton 1,218m3

Tum

puan

Kir

i Tul. Atas 7D22 7 1,450 10,150 30,298Tul. Bawah 3D22 3 1,450 4,350 12,985Tul. Pinggang 2D10 2 1,450 2,900 1,789Tul. Sengkang 1D10-100 1,45 0,1 15 1,760 26,400 16,289Tul. Kait 1D10 -1.000 1,45 1 2 0,240 0,480 0,296

Lap

anga

n

Tul. Atas 3D22 3 2,900 8,700 25,97Tul. Bawah 6D22 6 2,900 17,400 51,939Tul. Pinggang 2D10 2 1,450 2,900 1,789Tul. Sengkang 1D10-150 2,9 0,15 20 1,760 35,200 21,718Tul. Kait 1D10 -1.000 2,9 1 3 0,240 0,720 0,444

ump

uan

Kan

an Tul. Atas 7D22 7 1,450 10,150 30,298Tul. Bawah 3D22 3 1,450 4,350 12,985

Tul. Pinggang 2D10 2 1,450 2,900 1,789

Tul. Sengkang 1D10-100 1,45 0,1 15 1,760 26,400 16,289

Tul. Kait 1D10 -1.000 1,45 1 2 0,240 0,480 0,296Total Kebutuhan Besi Balok B8B 60,7 164,5Bengkokan dan Bahan Terbuang(10%) 66,77 180,9 54,82 148,539

Page 75: 0721074 Appendices

167

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B10 400x600 9,35Vol. Beton 2,244m3

Tum

puan

Kir

i Tul. Atas 4D22 4 2,338 9,350 27,91Tul. Bawah 2D22 2 2,338 4,675 13,955Tul. Pinggang 2D10 2 2,338 4,675 2,884Tul. Sengkang 1D10-100 2,3375 0,1 24 1,760 42,240 26,062Tul. Kait 1D10 -1.000 2,3375 1 3 0,340 1,020 0,629

Lap

anga

n

Tul. Atas 2D22 2 4,675 9,350 27,91Tul. Bawah 4D22 4 4,675 18,700 55,82Tul. Pinggang 2D10 2 2,338 4,675 2,884Tul. Sengkang 1D10-150 4,675 0,15 32 1,760 56,320 34,749Tul. Kait 1D10 -1.000 4,675 1 5 0,340 1,700 1,049

Tum

puan

Kan

an Tul. Atas 4D22 4 2,338 9,350 27,91Tul. Bawah 2D22 2 2,338 4,675 13,955

Tul. Pinggang 2D10 2 2,338 4,675 2,884

Tul. Sengkang 1D10-100 2,3375 0,1 24 1,760 42,240 26,062

Tul. Kait 1D10 -1.000 2,3375 1 3 0,340 1,020 0,629Total Kebutuhan Besi Balok B10 97,83 167,5Bengkokan dan Bahan Terbuang(10%) 107,6 184,2 47,958 82,088

Page 76: 0721074 Appendices

168

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B12 550x500 8Vol. Beton 2,2m3

Tum

puan

Kir

i Tul. Atas 10D22 10 2,000 20,000 59,7Tul. Bawah 4D22 4 2,000 8,000 23,88Tul. Pinggang -Tul. Sengkang 1D10-100 2 0,1 20 1,860 37,200 22,952Tul. Kait 1D10 -1.000 2 1 2 0,440 0,880 0,543

Lap

anga

n

Tul. Atas 3D22 3 4,000 12,000 35,82Tul. Bawah 5D22 5 4,000 20,000 59,7Tul. Pinggang -

Tul. Sengkang 1D10-150 4 0,15 27 1,860 50,220 30,986Tul. Kait 1D10 -1.000 4 1 4 0,440 1,760 1,086

Tum

puan

Kan

an Tul. Atas 10D22 10 2,000 20,000 59,7Tul. Bawah 4D22 4 2,000 8,000 23,88

Tul. Pinggang -

Tul. Sengkang 1D10-100 2 0,1 20 1,860 37,200 22,952

Tul. Kait 1D10 -1.000 2 1 2 0,490 0,980 0,605Total Kebutuhan Besi Balok B12 79,12 262,7Bengkokan dan Bahan Terbuang(10%) 87,04 288,9 39,562 131,34

Page 77: 0721074 Appendices

169

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B14 300x700 3,6Vol. Beton 0,756m3

Tum

puan

Kir

i Tul. Atas 5D22 5 0,900 4,500 13,433Tul. Bawah 3D22 3 0,900 2,700 8,0595Tul. Pinggang 2D10 2 0,900 1,800 1,111Tul. Sengkang 1D10-100 0,9 0,1 9 1,760 15,840 9,773Tul. Kait 1D10 -1.000 0,9 1 1 0,240 0,240 0,148

Lap

anga

n

Tul. Atas 3D22 3 1,800 5,400 16,119Tul. Bawah 4D22 4 1,800 7,200 21,492Tul. Pinggang 2D10 2 0,900 1,800 1,111Tul. Sengkang 1D10-150 1,8 0,15 12 1,760 21,120 13,031Tul. Kait 1D10 -1.000 1,8 1 2 0,240 0,480 0,296

Tum

pua

nK

anan Tul. Atas 5D22 5 0,900 4,500 13,433

Tul. Bawah 3D22 3 0,900 2,700 8,0595

Tul. Pinggang 2D10 2 0,900 1,800 1,111

Tul. Sengkang 1D10-100 0,9 0,1 9 1,760 15,840 9,773

Tul. Kait 1D10 -1.000 0,9 1 1 0,240 0,240 0,148Total Kebutuhan Besi Balok B14 36,5 80,6Bengkokan dan Bahan Terbuang(10%) 40,15 88,65 53,111 117,268

Page 78: 0721074 Appendices

170

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B14A 300x700 1,525Vol. Beton 0,2974m3

Tum

puan

Tul. Atas 5D22 5 0,381 1,906 5,690Tul. Bawah 2D22 2 0,381 0,763 2,276Tul.Pinggang 2D10 2 0,381 0,763 0,470Tul.Sengkang 1D10-100 0,381 0,1 4 1,760 7,040 4,344Tul. Kait 1D10 -1.000 0,381 1 1 0,240 0,240 0,148

Balok B4A 300x500

Uju

ng

Tul. Atas 3D22 3 0,381 1,144 3,414Tul. Bawah 2D22 2 0,381 0,763 2,276Tul.Pinggang -

Tul.Sengkang

1D10-2000,381 0,2 2 1,360 2,720 1,678

Tul. Kait -Total Kebutuhan Besi BalokB14A 6,64 13,66Bengkokan dan BahanTerbuang (10%) 7,305 15,02 24,563 50,515

Page 79: 0721074 Appendices

171

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B14B 300x700 2,8Vol. Beton 0,588m3

Tum

puan

Kir

i Tul. Atas 10D22 10 0,700 7,000 20,895Tul. Bawah 4D22 4 0,700 2,800 8,358Tul. Pinggang 2D10 2 0,700 1,400 0,864Tul. Sengkang 1D10-100 0,7 0,1 7 1,760 12,320 7,601Tul. Kait 1D10 -1.000 0,7 1 1 0,240 0,240 0,148

Lap

anga

n

Tul. Atas 4D22 4 1,400 5,600 16,716Tul. Bawah 6D22 6 1,400 8,400 25,074Tul. Pinggang 2D10 2 0,700 1,400 0,864Tul. Sengkang 1D10-150 1,4 0,15 10 1,760 17,600 10,859Tul. Kait 1D10 -1.000 1,4 1 2 0,240 0,480 0,296

Tum

pua

nK

anan Tul. Atas 9D22 9 0,700 6,300 18,806

Tul. Bawah 4D22 4 0,700 2,800 8,358

Tul. Pinggang 2D10 2 0,700 1,400 0,864

Tul. Sengkang 1D10-100 0,7 0,1 7 1,760 12,320 7,601

Tul. Kait 1D10 -1.000 0,7 1 1 0,240 0,240 0,148Total Kebutuhan Besi BalokB14B 29,25 98,21Bengkokan dan Bahan Terbuang(10%) 32,17 108 54,712 183,72

Page 80: 0721074 Appendices

172

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B14C 400x600 3,4Vol. Beton 0,816m3

Tum

puan

Kir

i Tul. Atas 11D22 11 0,850 9,350 27,91Tul. Bawah 8D22 8 0,850 6,800 20,298Tul. Pinggang 2D10 2 0,850 1,700 1,049Tul. Sengkang 2D10-100 0,85 0,1 9 3,520 31,680 19,547Tul. Kait 1D10 -1.000 0,85 1 1 0,340 0,340 0,210

Lap

anga

n

Tul. Atas 4D22 4 1,700 6,800 20,298Tul. Bawah 4D22 4 1,700 6,800 20,298Tul. Pinggang 2D10 2 0,850 1,700 1,049Tul. Sengkang 1,5D10-100 1,7 0,1 17 2,640 44,880 27,691Tul. Kait 1D10 -1.000 1,7 1 2 0,340 0,680 0,420

umpu

anK

anan Tul. Atas 8D22 8 0,850 6,800 20,298

Tul. Bawah 9D22 9 0,850 7,650 22,835

Tul. Pinggang 2D10 2 0,850 1,700 1,049

Tul. Sengkang 2D10-100 0,85 0,1 9 3,520 31,680 19,547

Tul. Kait 1D10 -1.000 0,85 1 1 0,340 0,340 0,210Total Kebutuhan Besi BalokB14C 70,77 131,9Bengkokan dan Bahan Terbuang(10%) 77,85 145,1 95,401 177,856

Page 81: 0721074 Appendices

173

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B14D 300x700 5,8Vol. Beton 1,218m3

Tum

puan

Kir

i Tul. Atas 5D22 5 1,450 7,250 21,641Tul. Bawah 3D22 3 1,450 4,350 12,985Tul. Pinggang 2D10 2 1,450 2,900 1,789Tul. Sengkang 1D10-100 1,45 0,1 15 1,760 26,400 16,289Tul. Kait 1D10 -1.000 1,45 1 2 0,240 0,480 0,296

Lap

anga

n

Tul. Atas 5D22 5 2,900 14,500 43,283Tul. Bawah 3D22 3 2,900 8,700 25,97Tul. Pinggang 2D10 2 1,450 2,900 1,789Tul. Sengkang 1D10-100 2,9 0,1 29 1,760 51,040 31,492Tul. Kait 1D10 -1.000 2,9 1 3 0,240 0,720 0,444

Tum

puan

Kan

an Tul. Atas 5D22 5 1,450 7,250 21,641Tul. Bawah 3D22 3 1,450 4,350 12,985

Tul. Pinggang 2D10 2 1,450 2,900 1,789

Tul. Sengkang 1D10-100 1,45 0,1 15 1,760 26,400 16,289

Tul. Kait 1D10 -1.000 1,45 1 2 0,240 0,480 0,296Total Kebutuhan Besi BalokB14D 70,47 138,5Bengkokan dan Bahan Terbuang(10%) 77,52 152,4 63,646 125,086

Page 82: 0721074 Appendices

174

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkan

g Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B14E 300x700 5,8Vol. Beton 1,218m3

Tum

puan

Kir

i Tul.Atas 9D22 9 1,450 13,050 38,954Tul. Bawah 4D22 4 1,450 5,800 17,313Tul. Pinggang 2D10 2 1,450 2,900 1,789Tul. Sengkang 1D10-100 1,45 0,1 15 1,760 26,400 16,289Tul. Kait 1D10 -1.000 1,45 1 2 0,240 0,480 0,296

Lap

anga

n

Tul. Atas 9D22 9 2,900 26,100 77,909Tul. Bawah 4D22 4 2,900 11,600 34,626Tul. Pinggang 2D10 2 1,450 2,900 1,789Tul. Sengkang 1D10-100 2,9 0,1 29 1,760 51,040 31,492Tul. Kait 1D10 -1.000 2,9 1 3 0,240 0,720 0,444

Tum

puan

Kan

an Tul. Atas 9D22 9 1,450 13,050 38,954Tul. Bawah 4D22 4 1,450 5,800 17,313

Tul. Pinggang 2D10 2 1,450 2,900 1,789

Tul. Sengkang 1D10-100 1,45 0,1 15 1,760 26,400 16,289

Tul, Kait 1D10 -1.000 1,45 1 2 0,240 0,480 0,296Total Kebutuhan Besi BalokB14E 70,47 225,1Bengkokan dan Bahan Terbuang(10%) 77,52 247,6 63,646 203,264

Page 83: 0721074 Appendices

175

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B16 500x1.000 7,75Vol. Beton 3,875m3

Tum

puan

Kir

i Tul. Atas 12D22 12 1,938 23,250 69,401Tul. Bawah 6D22 6 1,938 11,625 34,701Tul. Pinggang 4D10 4 1,938 7,750 4,782Tul. Sengkang 1,5D10-150 1,9375 0,15 13 4,140 53,820 33,207Tul. Kait 2D10 -1.000 1,9375 1 2 0,880 1,760 1,086

Lap

anga

n

Tul. Atas 9D22 9 3,875 34,875 104,1Tul. Bawah 20D22 20 3,875 77,500 231,34Tul. Pinggang 4D10 4 1,938 7,750 4,782Tul. Sengkang 1,5D10-200 3,875 0,2 20 4,140 82,800 51,088Tul. Kait 2D10 -1.000 3,875 1 4 0,880 3,520 2,172

Tum

puan

Kan

an Tul. Atas 22D22 22 1,938 42,625 127,24Tul. Bawah 12D22 12 1,938 23,250 69,401

Tul. Pinggang 4D10 4 1,938 7,750 4,782

Tul. Sengkang 1,5D10-150 1,9375 0,15 13 4,140 53,820 33,207

Tul. Kait 2D10 -1.000 1,9375 1 2 0,880 1,760 1,086Total Kebutuhan Besi Balok B16 136,2 636,2Bengkokan dan Bahan Terbuang(10%) 149,8 699,8 38,661 180,593

Page 84: 0721074 Appendices

176

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B1A 1400x400 6,4Vol. Beton 3,584m3

Tum

puan

Kir

i Tul. Atas 18D22 18 1,600 28,800 85,968Tul. Bawah 6D22 6 1,600 9,600 28,656Tul. Pinggang -

Tul. Sengkang 2D10 -150 1,6 0,15 11 6,720 73,920 45,609Tul. Kait -

Lap

anga

n

Tul. Atas 7D22 7 3,200 22,400 66,864Tul. Bawah 6D22 6 3,200 19,200 57,312Tul. Pinggang -Tul. Sengkang 2D10-200 3,2 0,2 16 6,720 107,520 66,340Tul. Kait -

Tum

puan

Kan

an Tul. Atas 6D22 6 1,600 9,600 28,656Tul. Bawah 10D22 10 1,600 16,000 47,76

Tul. Pinggang -

Tul. Sengkang 2D10-150 1,6 0,15 11 6,720 73,920 45,609

Tul. Kait -

Total Kebutuhan Besi Balok B1A 157,6 315,2Bengkokan dan Bahan Terbuang(10%) 173,3 346,7 48,357 96,746

Page 85: 0721074 Appendices

177

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B6A 400x800 1,475Vol. Beton 0,472m3

Tum

puan

Kir

i Tul. Atas 8D22 8 0,369 2,950 8,8058Tul. Bawah 6D22 6 0,369 2,213 6,6043Tul. Pinggang 2D10 2 0,369 0,738 0,455Tul. Sengkang 1,5D10-100 0,36875 0,1 4 3,240 12,960 7,996Tul. Kait 1D10 -1.000 0,36875 1 1 0,340 0,340 0,210

Lap

anga

n

Tul. Atas 5D22 5 0,738 3,688 11,007Tul. Bawah 5D22 5 0,738 3,688 11,007Tul. Pinggang 2D10 2 0,369 0,738 0,455Tul. Sengkang 1,5D10-125 0,7375 0,125 6 3,240 19,440 11,994Tul. Kait 1D10 -1.000 0,7375 1 1 0,340 0,340 0,210

Tum

puan

Kan

an Tul. Atas 12D22 12 0,369 4,425 13,209Tul. Bawah 6D22 6 0,369 2,213 6,6043

Tul. Pinggang 2D10 2 0,369 0,738 0,455

Tul. Sengkang 1,5D10-100 0,36875 0,1 4 3,240 12,960 7,996

Tul. Kait 1D10 -1.000 0,36875 1 1 0,340 0,340 0,210Total Kebutuhan Besi Balok B6A 29,98 57,24Bengkokan dan Bahan Terbuang(10%) 32,98 62,96 69,872 133,392

Page 86: 0721074 Appendices

178

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B12A 550x500 8Vol. Beton 2,2m3

Tum

puan

Kir

i Tul. Atas 12D22 12 2,000 24,000 71,64Tul. Bawah 5D22 5 2,000 10,000 29,85Tul. Pinggang -

Tul. Sengkang 1D10-150 2 0,15 14 1,860 26,040 16,067Tul. Kait 1D10 -1.000 2 1 2 0,440 0,880 0,543

Lap

anga

n

Tul. Atas 5D22 5 4,000 20,000 59,7Tul. Bawah 6D22 6 4,000 24,000 71,64Tul. Pinggang -Tul. Sengkang 1D10-200 4 0,2 20 1,860 37,200 22,952Tul. Kait 1D10 -1.000 4 1 4 0,440 1,760 1,086

Tum

puan

Kan

an Tul. Atas 8D22 8 2,000 16,000 47,76Tul. Bawah 5D22 5 2,000 10,000 29,85

Tul. Pinggang -

Tul. Sengkang 1D10-150 2 0,15 14 1,860 26,040 16,067

Tul. Kait 1D10 -1.000 2 1 2 0,490 0,980 0,605Total Kebutuhan Besi BalokB12A 57,32 310,4Bengkokan dan Bahan Terbuang(10%) 63,05 341,5 28,66 155,22

Page 87: 0721074 Appendices

179

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B17 300x600 5,4Vol. Beton 0,972m3

Tum

puan

Kir

i Tul. Atas 4D22 4 1,350 5,400 16,119Tul. Bawah 3D22 3 1,350 4,050 12,089Tul. Pinggang 2D10 2 1,350 2,700 1,666Tul. Sengkang 1D10-100 1,35 0,1 14 1,560 21,840 13,475Tul. Kait 1D10 -1.000 1,35 1 2 0,240 0,480 0,296

Lap

anga

n

Tul. Atas 2D22 2 2,700 5,400 16,119Tul. Bawah 3D22 3 2,700 8,100 24,179Tul. Pinggang 2D10 2 1,350 2,700 1,666Tul. Sengkang 1D10-200 2,7 0,2 14 1,560 21,840 13,475Tul. Kait 1D10 -1.000 2,7 1 3 0,240 0,720 0,444

Tum

puan

Kan

an Tul. Atas 4D22 4 1,350 5,400 16,119Tul. Bawah 3D22 3 1,350 4,050 12,089

Tul. Pinggang 2D10 2 1,350 2,700 1,666

Tul. Sengkang 1D10-100 1,35 0,1 14 1,560 21,840 13,475

Tul. Kait 1D10 -1.000 1,35 1 2 0,240 0,480 0,296Total Kebutuhan Besi Balok B17 46,46 96,71Bengkokan dan Bahan Terbuang(10%) 51,11 106,4 52,578 109,45

Page 88: 0721074 Appendices

180

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B17A 300x600 1,4Vol. Beton 0,242m3

Tum

puan

Tul. Atas 4D22 4 0,350 1,400 4,179Tul. Bawah 3D22 3 0,350 1,050 3,1343Tul. Pinggang 2D10 2 0,350 0,700 0,432Tul. Sengkang 1D10-100 0,35 0,1 4 1,560 6,240 3,850Tul. Kait 1D10 -1.000 0,35 1 1 0,240 0,240 0,148

Balok B17A 300x500

Uju

ng

Tul. Atas 2D22 2 0,350 0,700 2,0895Tul. Bawah 2D22 2 0,350 0,700 2,0895

Tul. Pinggang -

Tul. Sengkang 1D10-200 0,35 0,2 2 1,360 2,720 1,678

Tul. Kait -Total Kebutuhan Besi BalokB17A 6,108 11,49Bengkokan dan Bahan Terbuang(10%) 6,719 12,64 27,822 52,346

Page 89: 0721074 Appendices

181

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B18 300x500 2,075Vol. Beton 0,3113m3

Tum

puan

Kir

i Tul. Atas 5D19 5 0,519 2,594 5,7737Tul. Bawah 3D19 3 0,519 1,556 3,464Tul. Pinggang -

Tul. Sengkang 1D10-125 0,51875 0,125 5 1,360 6,800 4,196Tul. Kait -

Lap

anga

n

Tul. Atas 3D19 3 1,038 3,113 6,9284Tul. Bawah 4D19 4 1,038 4,150 9,238Tul. Pinggang -Tul. Sengkang 1D10-200 1,0375 0,2 6 1,360 8,160 5,035Tul. Kait -

Tu

mpu

anK

anan Tul. Atas 5D19 5 0,519 2,594 5,7737

Tul. Bawah 3D19 3 0,519 1,556 3,464

Tul. Pinggang -

Tul. Sengkang 1D10-125 0,51875 0,125 5 1,360 6,800 4,196

Tul. Kait -

Total Kebutuhan Besi Balok B18 13,43 34,64Bengkokan dan Bahan Terbuang(10%) 14,77 38,11 47,449 122,43

Page 90: 0721074 Appendices

182

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B10B 400x600 4Vol. Beton 0,96m3

Tum

puan

Kir

i Tul. Atas 14D22 14 1,000 14,000 41,79Tul. Bawah 7D22 7 1,000 7,000 20,895Tul. Pinggang 2D10 2 1,000 2,000 1,234Tul. Sengkang 1,5D10-150 1 0,15 7 2,640 18,480 11,402Tul. Kait 1D10 -1.000 1 1 1 0,340 0,340 0,210

Lap

anga

n

Tul. Atas 6D22 6 2,000 12,000 35,82Tul. Bawah 14D22 14 2,000 28,000 83,58Tul. Pinggang 2D10 2 1,000 2,000 1,234Tul. Sengkang 1,5D10-200 2 0,2 10 2,640 26,400 16,289Tul. Kait 1D10 -1.000 2 1 2 0,340 0,680 0,420

Tum

puan

Kan

an Tul. Atas 14D22 14 1,000 14,000 41,79Tul. Bawah 7D22 7 1,000 7,000 20,895

Tul. Pinggang 2D10 2 1,000 2,000 1,234

Tul. Sengkang 1,5D10-150 1 0,15 7 2,640 18,480 11,402

Tul. Kait 1D10 -1.000 1 1 1 0,340 0,340 0,210Total Kebutuhan Besi BalokB10B 43,63 244,8Bengkokan dan Bahan Terbuang(10%) 48 269,2 49,998 280,466

Page 91: 0721074 Appendices

183

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B18A 300x500 6,3Vol. Beton 0,945m3

Tum

puan

Kir

i Tul. Atas 6D22 6 1,575 9,450 28,208Tul. Bawah 3D22 3 1,575 4,725 14,104Tul. Pinggang -

Tul. Sengkang 1D10 -150 1,575 0,15 11 1,360 14,960 9,230Tul. Kait -

Lap

anga

n

Tul. Atas 2D22 2 3,150 6,300 18,806Tul. Bawah 3D22 3 3,150 9,450 28,208Tul. Pinggang -Tul. Sengkang 1D10-200 3,15 0,2 16 1,360 21,760 13,426Tul. Kait -

Tum

puan

Kan

an Tul. Atas 6D22 6 1,575 9,450 28,208Tul. Bawah 3D22 3 1,575 4,725 14,104

Tul. Pinggang -

Tul. Sengkang 1D10-150 1,575 0,15 11 1,360 14,960 9,230

Tul. Kait -Total Kebutuhan Besi BalokB18A 31,89 131,6Bengkokan dan Bahan Terbuang(10%) 35,08 144,8 37,117 153,23

Page 92: 0721074 Appendices

184

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B18C 300x500 5,8Vol. Beton 0,87m3

Tum

puan

Kir

i Tul. Atas 9D22 9 1,450 13,050 38,954Tul. Bawah 5D22 5 1,450 7,250 21,641Tul. Pinggang -

Tul. Sengkang 1D10 -100 1,45 0,1 15 1,360 20,400 12,587Tul. Kait -

Lap

anga

n

Tul. Atas 4D22 4 2,900 11,600 34,626Tul. Bawah 5D22 5 2,900 14,500 43,283Tul. Pinggang -Tul. Sengkang 1D10-150 2,9 0,15 20 1,360 27,200 16,782Tul. Kait -

Tum

puan

Kan

an Tul. Atas 9D22 9 1,450 13,050 38,954Tul. Bawah 5D22 5 1,450 7,250 21,641

Tul. Pinggang -

Tul. Sengkang 1D10-100 1,45 0,1 15 1,360 20,400 12,587

Tul. Kait -Total Kebutuhan Besi BalokB18C 41,96 199,1Bengkokan dan Bahan Terbuang(10%) 46,15 219 53,048 251,735

Page 93: 0721074 Appendices

185

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B17C 300x600 6Vol. Beton 1,08m3

Tum

puan

Kir

i Tul. Atas 9D22 9 1,500 13,500 40,298Tul. Bawah 8D22 8 1,500 12,000 35,82Tul. Pinggang 2D10 2 1,500 3,000 1,851Tul. Sengkang 1,5D10-100 1,5 0,1 15 2,340 35,100 21,657Tul. Kait 1D10 -1.000 1,5 1 2 0,240 0,480 0,296

Lap

anga

n

Tul. Atas 4D22 4 3,000 12,000 35,82Tul. Bawah 4D22 4 3,000 12,000 35,82Tul. Pinggang 2D10 2 1,500 3,000 1,851Tul. Sengkang 1,5D10-150 3 0,15 20 2,340 46,800 28,876Tul. Kait 1D10 -1.000 3 1 3 0,240 0,720 0,444

Tum

pua

nK

anan Tul. Atas 9D22 9 1,500 13,500 40,298

Tul. Bawah 8D22 8 1,500 12,000 35,82

Tul. Pinggang 2D10 2 1,500 3,000 1,851

Tul. Sengkang 1,5D10-100 1,5 0,1 15 2,340 35,100 21,657

Tul. Kait1D10 -1.000

1,5 1 2 0,240 0,480 0,296Total Kebutuhan Besi BalokB17C 78,78 223,9Bengkokan dan Bahan Terbuang(10%) 86,66 246,3 80,237 228,021

Page 94: 0721074 Appendices

186

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B17B 300x600 5Vol. Beton 0,9m3

Tum

puan

Kir

i Tul. Atas 6D22 6 1,250 7,500 22,388Tul. Bawah 3D22 3 1,250 3,750 11,194Tul. Pinggang 2D10 2 1,250 2,500 1,543Tul. Sengkang 1,5D10-100 1,25 0,1 13 2,340 30,420 18,769Tul. Kait 1D10 -1.000 1,25 1 2 0,240 0,480 0,296

Lap

anga

n

Tul. Atas 3D22 3 2,500 7,500 22,388Tul. Bawah 6D22 6 2,500 15,000 44,775Tul. Pinggang 2D10 2 1,250 2,500 1,543Tul. Sengkang 1,5D10-150 2,5 0,15 17 2,340 39,780 24,544Tul. Kait 1D10 -1.000 2,5 1 3 0,240 0,720 0,444

Tum

puan

Kan

an Tul. Atas 6D22 6 1,250 7,500 22,388Tul. Bawah 3D22 3 1,250 3,750 11,194

Tul. Pinggang 2D10 2 1,250 2,500 1,543

Tul. Sengkang 1,5D10-100 1,25 0,1 13 2,340 30,420 18,769

Tul. Kait 1D10 -1.000 1,25 1 2 0,240 0,480 0,296Total Kebutuhan Besi BalokB17B 67,75 134,3Bengkokan dan Bahan Terbuang(10%) 74,52 147,8 82,801 164,175

Page 95: 0721074 Appendices

187

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B19 250x500 6Vol. Beton 0,75m3

Tum

puan

Kir

i Tul. Atas 3D16 3 1,500 4,500 7,101Tul. Bawah 3D16 3 1,500 4,500 7,101Tul. Pinggang -Tul. Sengkang 1D10 -200 1,5 0,2 8 1,260 10,080 4,936Tul. Kait -

Lap

anga

n

Tul. Atas 3D16 3 3,000 9,000 14,202Tul. Bawah 3D16 3 3,000 9,000 14,202Tul. Pinggang -

Tul. Sengkang 1D10-200 3 0,2 15 1,260 18,900 11,661Tul. Kait -

Tum

pua

nK

anan Tul. Atas 3D16 3 1,500 4,500 7,101

Tul. Bawah 3D16 3 1,500 4,500 7,101

Tul. Pinggang -

Tul. Sengkang 1D10-200 1,5 0,2 8 1,260 10,080 6,2194

Tul. Kait -

Total Kebutuhan Besi Balok B19 22,82 56,81Bengkokan dan Bahan Terbuang(10%) 25,1 62,49 33,464 83,318

Page 96: 0721074 Appendices

188

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B20 200x400 2Vol. Beton 0,16m3

Tum

puan

Kir

i Tul. Atas 3D16 3 0,500 1,500 2,367Tul. Bawah 3D16 3 0,500 1,500 2,367Tul. Pinggang -Tul. Sengkang 1D10 -200 0,5 0,2 3 0,960 2,880 1,851Tul. Kait -

Lap

anga

n

Tul. Atas 3D16 3 1,000 3,000 4,734Tul. Bawah 3D16 3 1,000 3,000 4,734Tul. Pinggang -

Tul. Sengkang 1D10-200 1 0,2 5 0,960 4,800 2,9616Tul. Kait -

Tum

pua

nK

anan Tul. Atas 3D16 3 0,500 1,500 2,367

Tul. Bawah 3D16 3 0,500 1,500 2,367

Tul. Pinggang -

Tul. Sengkang 1D10-200 0,5 0,2 3 0,960 2,880 1,777

Tul. Kait -

Total Kebutuhan Besi Balok B20 6,59 18,94Bengkokan dan Bahan Terbuang(10%) 7,249 20,83 45,303 130,185

Page 97: 0721074 Appendices

189

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B8 250x500 8Vol. Beton 1m3

Tum

puan

Kir

i Tul. Atas 5D22 5 2,000 10,000 29,85Tul. Bawah 3D22 3 2,000 6,000 17,91Tul. Pinggang -Tul. Sengkang 1D10 -100 2 0,1 20 1,260 25,200 12,34Tul. Kait -

Lap

anga

n

Tul. Atas 3D22 3 4,000 12,000 35,82Tul. Bawah 4D22 4 4,000 16,000 47,76Tul. Pinggang -

Tul. Sengkang 1D10-150 4 0,15 27 1,260 34,020 20,99Tul. Kait -

Tum

pua

nK

anan Tul. Atas 5D22 5 2,000 10,000 29,85

Tul. Bawah 3D22 3 2,000 6,000 17,91

Tul. Pinggang -

Tul. Sengkang 1D10-100 2 0,1 20 1,260 25,200 15,548

Tul. Kait -

Total Kebutuhan Besi Balok B8 48,88 179,1Bengkokan dan Bahan Terbuang(10%) 53,77 197 53,767 197,01

Page 98: 0721074 Appendices

190

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B22 200x450 5,8Vol. Beton 0,522m3

Tum

puan

Kir

i Tul. Atas 2D16 2 1,450 2,900 4,5762Tul. Bawah 2D16 2 1,450 2,900 4,5762Tul. Pinggang -Tul. Sengkang 1D10 -200 1,45 0,2 8 1,060 8,480 4,936Tul. Kait -

Lap

anga

n

Tul. Atas 2D16 2 2,900 5,800 9,1524Tul. Bawah 2D16 2 2,900 5,800 9,1524Tul. Pinggang -

Tul. Sengkang 1D10-200 2,9 0,2 15 1,060 15,900 9,8103Tul. Kait -

Tum

pua

nK

anan Tul. Atas 2D16 2 1,450 2,900 4,5762

Tul. Bawah 2D16 2 1,450 2,900 4,5762

Tul. Pinggang -

Tul. Sengkang 1D10-200 1,45 0,2 8 1,060 8,480 5,2322

Tul. Kait -

Total Kebutuhan Besi Balok B22 19,98 36,61Bengkokan dan Bahan Terbuang(10%) 21,98 40,27 42,1 77,147

Page 99: 0721074 Appendices

191

Tabel L3.5 Perhitungan Kebutuhan Tulangan Balok per m3 (Lanjutan)

Keterangan

PanjangBalok

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

Panjang Tulangan Berat Tulangan (Kg)Kebutuhan Tulangan (kg/m3)Per

BatangTotal 10 13 16 19 22

m m m m m 0,617 1,042 1,578 2,226 2,985 10 13 16 19 22

Balok B23 300x700 5,8Vol. Beton 1,131m3

Tum

pua

n

Tul. Atas 6D22 6 1,450 8,700 25,97Tul. Bawah 3D22 3 1,450 4,350 12,985Tul. Pinggang 2D10 2 1,450 2,900 1,789Tul. Sengkang 1D10-100 1,45 0,1 15 1,760 26,400 16,289Tul. Kait 1D10 -1.000 1,45 1 2 0,240 0,480 0,296Balok B4A 300x500

Uju

ng

Tul. Atas 3D22 3 1,450 4,350 12,985Tul. Bawah 2D22 2 1,450 2,900 8,6565

Tul. Pinggang -

Tul. Sengkang 1D10-150 1,45 0,15 10 1,360 13,600 8,391

Tul. Kait -

Total Kebutuhan Besi Balok B23 26,77 60,6Bengkokan dan Bahan Terbuang(10%) 29,44 66,66 26,032 58,935

Page 100: 0721074 Appendices

192

L3.6 Perhitungan Kebutuhan Tulangan Kolom per m3

Hasil perhitungan kebutuhan tulangan kolom per m3 disederhanakan dengan

lengkap dalam Tabel L3.6 sebagai berikut:

Page 101: 0721074 Appendices

193

Tabel L3.6 Perhitungan Kebutuhan Tulangan Kolom per m3

Keterangan

PanjangKolom

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

PanjangTulangan Berat Tulangan (Kg)

Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 19 22 25

m m m m m 0,617 1,042 2,226 2,985 3,853 10 13 19 22 25

Kolom K1 600x600 5,5Vol. Beton 1,98m3

Tul. Utama 12D22 12 5,5 66 197,01Tul. Kait 2D10 -1.000 5,5 1 6 1,08 6,48 3,998Tul.Sengkang

Tumpuan 1D10 -100 2,75 0,1 28 2,16 60,48 37,316Lapangan 1D10 -150 2,75 0,15 19 2,16 41,04 25,322

Total Kebutuhan Besi Kolom K1 66,64 197Bengkokan dan Bahan Terbuang(10%) 73,3 216,7 37,020 109,450

Kolom K1A 600x600 6,5Vol. Beton 2,34m3

Tul. Utama 30D22 30 6,5 195 582,08Tul. Kait 5D10 -1.000 6,5 1 7 5,4 37,8 23,323 39,388Tul.Sengkang

Tumpuan 1,5D13 -100 3,25 0,1 33 3,24 106,92Lapangan 1,5D13 -200 3,25 0,2 17 3,24 55,08 57,393

Total Kebutuhan Besi Kolom K1A 23,323 96,78 582,1Bengkokan dan Bahan Terbuang(10%) 25,65 106,5 640,3 10,964 45,495 273,625

Page 102: 0721074 Appendices

194

Tabel L3.6 Perhitungan Kebutuhan Tulangan Kolom per m3 (lanjutan)

Keterangan

PanjangKolom

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

PanjangTulangan Berat Tulangan (Kg)

Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 19 22 25

m m m m m 0,617 1,042 2,226 2,985 3,853 10 13 19 22 25

Kolom K2 500x800 5,5Vol. Beton 2,2m3

Tul. Utama 12D22 12 5,5 66 197,01

Tul. KaitVertikal

1D10 -1.000 5,5 1 6 0,74 4,44 2,739

Horisontal2D10 -1.000 5,5 1 6 0,88 5,28 3,258

Tul.Sengkang

Tumpuan 1D10 -100 2,75 0,1 28 2,36 66,08 40,771Lapangan 1D10 -150 2,75 0,15 19 2,36 44,84 27,666

Total Kebutuhan Besi Kolom K2 74,43 197Bengkokan dan Bahan Terbuang(10%) 81,88 216,7 37,217 98,505

Kolom K2A 500x800 5,5Vol. Beton 2,2m3

Tul. Utama 24D2 24 5,5 132 394,02

Tul. Kait Vertikal 1D10 -1.000 5,5 1 6 0,74 4,44 2,739Horisontal 1D10 -1.000 5,5 1 6 0,44 2,64 1,629

Tul.Sengkang

Tumpuan 1,5D10 -100 2,75 0,1 28 3,54 99,12 61,157Lapangan 1,5D10 -150 2,75 0,15 19 3,54 67,26 41,499

Total Kebutuhan Besi Kolom K2A 107 394Bengkokan dan Bahan Terbuang(10%) 117,7 433,4 53,512 197,010

Page 103: 0721074 Appendices

195

Tabel L3.6 Perhitungan Kebutuhan Tulangan Kolom per m3 (lanjutan)

Keterangan

PanjangKolom

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

PanjangTulangan Berat Tulangan (Kg)

Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 19 22 25

m m m m m 0,617 1,042 2,226 2,985 3,853 10 13 19 22 25

Kolom K2B 900x800 5,5Vol. Beton 3,96m3

Tul. Utama20D22 20 5,5 110 328,3524D25 24 5,5 132 508,6

Tul. KaitVertikal 1D10 -1.000 5,5 1 6 0,74 4,44 2,739Horisontal 2D10 -1.000 5,5 1 6 1,68 10,08 6,219

Tul.Sengkang

Tumpuan 2D10 -100 2,75 0,1 28 6,32 176,96 109,184Lapangan 2D10 -200 2,75 0,2 14 6,32 88,48 54,592

Total Kebutuhan Besi Kolom K2B 172,7 328,4 508,6Bengkokan dan Bahan Terbuang(10%) 190 361,2 559,5 47,982 91,208 141,277

Kolom K3 500x500 3,2Vol.Beton 0,8m3

Tul. Utama 12D22 12 3,2 38,4 114,62Tul. Kait 2D10 -1.000 3,2 1 4 0,88 3,52 2,172Tul.Sengkang

Tumpuan 1D10 -100 1,6 0,1 16 1,76 28,16 17,375Lapangan 1D10 -200 1,6 0,2 8 1,76 14,08 8,687

Total Kebutuhan Besi Kolom K3 28,23 114,6Bengkokan dan Bahan Terbuang(10%) 31,06 126,1 38,822 157,608

Page 104: 0721074 Appendices

196

Tabel L3.6 Perhitungan Kebutuhan Tulangan Kolom per m3 (lanjutan)

Keterangan

PanjangKolom

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

PanjangTulangan Berat Tulangan (Kg)

Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 19 22 25

m m m m m 0,617 1,042 2,226 2,985 3,853 10 13 19 22 25

Kolom K4 400x400 6,5Vol. Beton 1,04m3

Tul. Utama 8D22 8 6,5 52 155,22Tul. Kait

Tul.Sengkang

Tumpuan 1D10 -100 3,25 0,1 33 1,36 44,88 27,691Lapangan 1D10 -200 3,25 0,2 17 1,36 23,12 14,265

Total Kebutuhan Besi Kolom K4 41,96 155,2Bengkokan dan Bahan Terbuang(10%) 46,15 170,7 44,377 164,175

Kolom K6 300x750 3,2Vol. Beton 0,72m3

Tul. Utama 8D22 8 3,2 25,6 76,416

Tul. KaitVertikalHorisontal 2D10 -1.000 3,2 1 4 0,48 1,92 1,185

Tul.Sengkang

Tumpuan 1D10 -100 1,6 0,1 16 1,86 29,76 18,362Lapangan 1D10 -150 1,6 0,15 11 1,86 20,46 12,624

Total Kebutuhan Besi Kolom K6 32,17 76,42Bengkokan dan Bahan Terbuang(10%) 35,39 84,06 49,149 116,747

Page 105: 0721074 Appendices

197

Tabel L3.6 Perhitungan Kebutuhan Tulangan Kolom per m3 (lanjutan)

Keterangan

PanjangKolom

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

PanjangTulangan Berat Tulangan (Kg)

Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 19 22 25

m m m m m 0,617 1,042 2,226 2,985 3,853 10 13 19 22 25

Kolom K6A 300x750 3,2Vol. Beton 0,72m3

Tul. Utama 12D22 12 3,2 38,4 114,62

Tul. KaitVertikalHorisontal 2D10 -1.000 3,2 1 4 0,48 1,92 1,185

Tul.Sengkang

Tumpuan 1D10 -100 1,6 0,1 16 1,86 29,76 18,362Lapangan 1D10 -150 1,6 0,15 11 1,86 20,46 12,624

Total Kebutuhan Besi Kolom K6A 32,17 114,6Bengkokan dan Bahan Terbuang(10%) 35,39 126,1 49,149 175,120

Kolom K6B 300x750 3,2Vol. Beton 0,72m3

Tul. Utama 18D22 18 3,2 57,6 171,94

Tul. Kait VertikalHorisontal 2D10 -1.000 3,2 1 4 0,48 1,92 1,185

Tul.Sengkang

Tumpuan 1D10 -100 1,6 0,1 16 1,86 29,76 18,362Lapangan 1D10 -150 1,6 0,15 11 1,86 20,46 12,624

Total Kebutuhan Besi Kolom K6B 32,17 171,9Bengkokan dan Bahan Terbuang(10%) 35,39 189,1 49,149 262,680

Page 106: 0721074 Appendices

198

Tabel L3.6 Perhitungan Kebutuhan Tulangan Kolom per m3 (lanjutan)

Keterangan

PanjangKolom

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

PanjangTulangan Berat Tulangan (Kg)

Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 19 22 25

m m m m m 0,617 1,042 2,226 2,985 3,853 10 13 19 22 25

Kolom K6D 300x750 3,2Vol. Beton 0,72m3

Tul. Utama 24D22 24 3,2 76,8 229,25

Tul. KaitVertikalHorisontal 2D10 -1.000 3,2 1 4 0,48 1,92 1,185

Tul.Sengkang

Tumpuan 1D10 -100 1,6 0,1 16 1,86 29,76 18,362Lapangan 1D10 -150 1,6 0,15 11 1,86 20,46 12,624

Total Kebutuhan Besi Kolom K6D 32,17 229,2Bengkokan dan Bahan Terbuang(10%) 35,39 252,2 49,149 350,240

Kolom K7A 700x800 6,5Vol. Beton 3,64m3

Tul. Utama28D22 28 6,5 182 543,2720D25 20 6,5 130 500,89

Tul. Kait Vertikal 2D10 -1.000 6,5 1 7 1,48 10,36 6,392Horisontal

Tul.Sengkang

Tumpuan 2D13 -100 3,25 0,1 33 5,52 182,16 189,811Lapangan 2D13 -150 3,25 0,15 22 5,52 121,44 126,540

Total Kebutuhan Besi Kolom K7A 6,392 189,8 543,3 500,9Bengkokan dan Bahan Terbuang(10%) 7,031 208,8 597,6 551 1,932 164,175 151,368

Page 107: 0721074 Appendices

199

Tabel L3.6 Perhitungan Kebutuhan Tulangan Kolom per m3 (lanjutan)

Keterangan

PanjangKolom

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

PanjangTulangan Berat Tulangan (Kg)

Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 19 22 25

m m m m m 0,617 1,042 2,226 2,985 3,853 10 13 19 22 25

Kolom K7B 700x800 6,5Vol. Beton 3,64m3

Tul. Utama24D22 24 6,5 156 465,6612D25 12 6,5 78 300,53

Tul. KaitVertikal 2D10 -1.000 6,5 1 7 1,48 10,36 6,392Horisontal

Tul.Sengkang

Tumpuan 2D13 -100 3,25 0,1 33 5,52 182,16 189,811Lapangan 2D13 -150 3,25 0,15 22 5,52 121,44 126,540

Total Kebutuhan Besi Kolom K7B 6,392 189,8 465,7 300,5Bengkokan dan Bahan Terbuang(10%) 7,031 208,8 512,2 330,6 1,932 140,721 90,821

Kolom K8 300x300 3,2Vol. Beton 0,288m3

Tul. Utama 4D22 4 3,2 12,8 38,208Tul. Kait

Tul.Sengkang

Tumpuan 1D10 -100 1,6 0,1 16 0,96 15,36 9,477Lapangan 1D10 -200 1,6 0,2 8 0,96 7,68 4,739

Total Kebutuhan Besi Kolom K8 14,22 38,21Bengkokan dan Bahan Terbuang(10%) 15,64 42,03 54,296 145,933

Page 108: 0721074 Appendices

200

Tabel L3.6 Perhitungan Kebutuhan Tulangan Kolom per m3 (lanjutan)

Keterangan

PanjangKolom

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

PanjangTulangan Berat Tulangan (Kg)

Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 19 22 25

m m m m m 0,617 1,042 2,226 2,985 3,853 10 13 19 22 25

Kolom K9 700x700 6,5(Kolom L) (-) 400x400Vol. Beton 2,145m3

Tul. Utama 16D22 16 6,5 104 310,44Tul. Kait 2D10 -1.000 6,5 1 7 0,48 3,36 2,073Tul.Sengkang

Tumpuan 1D10 -100 3,25 0,1 33 2,56 84,48 52,124Lapangan 1D10 -200 3,25 0,2 17 2,56 43,52 26,852

Total Kebutuhan Besi Kolom K9 81,05 310,4Bengkokan dan Bahan Terbuang(10%) 89,15 341,5 41,564 159,2

Kolom K10 400x750 3,2Vol. Beton 0,96m3

Tul. Utama12D22 12 3,2 38,4 114,624D19 4 3,2 12,8 28,493

Tul. Kait 2D10 -1.000 3,2 1 4 1,03 4,12 2,542Tul.Sengkang

Tumpuan 1D10 -100 1,6 0,1 16 2,06 32,96 20,336Lapangan 1D10 -150 1,6 0,15 11 2,06 22,66 13,981

Total Kebutuhan Besi Kolom K10 36,86 28,49 114,6Bengkokan dan Bahan Terbuang(10%) 40,55 31,34 126,1 42,235 32,648 131,34

Page 109: 0721074 Appendices

201

Tabel L3.6 Perhitungan Kebutuhan Tulangan Kolom per m3 (lanjutan)

Keterangan

PanjangKolom

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

PanjangTulangan Berat Tulangan (Kg)

Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 19 22 25

m m m m m 0,617 1,042 2,226 2,985 3,853 10 13 19 22 25

Kolom K10A 400x750 3,2Vol. Beton 0,96m3

Tul. Utama 20D22 20 3,2 64 191,04Tul. Kait 2D10 -1.000 3,2 1 4 1,03 4,12 2,542Tul.Sengkang

Tumpuan 1D10 -100 1,6 0,1 16 2,06 32,96 20,336Lapangan 1D10 -150 1,6 0,15 11 2,06 22,66 13,981

Total Kebutuhan Besi KolomK10A 36,86 191Bengkokan dan Bahan Terbuang(10%) 40,55 210,1 42,235 218,9

Kolom K10B 400x750 3,2Vol. Beton 0,96m3

Tul. Utama12D22 12 3,2 38,4 114,6212D25 12 3,2 38,4 147,96

Tul. KaitVertikalHorisontal 2D10 -1.000 3,2 1 4 0,68 2,72 1,678

Tul.Sengkang

Tumpuan 1,5D10 -100 1,6 0,1 16 3,09 49,44 51,516Lapangan 2D10 -150 1,6 0,15 11 4,12 45,32 47,223

Total Kebutuhan Besi KolomK10B 1,678 51,52 114,6 148Bengkokan dan Bahan Terbuang(10%) 1,846 56,67 126,1 162,8 1,923 131,34 169,532

Page 110: 0721074 Appendices

202

Tabel L3.6 Perhitungan Kebutuhan Tulangan Kolom per m3 (lanjutan)

Keterangan

PanjangKolom

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

PanjangTulangan Berat Tulangan (Kg)

Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 19 22 25

m m m m m 0,617 1,042 2,226 2,985 3,853 10 13 19 22 25

Kolom K11 800x800 3,2(Kolom L) (-) 500x500

Vol. Beton 1,248m3

Tul. Utama 12D22 12 3,2 38,4 114,62

Tul. Kait 2D10 -1.000 3,2 1 4 0,48 1,92 1,185

Tul.Sengkang

Tumpuan 1D10 -100 1,6 0,1 16 2,96 47,36 29,221Lapangan 1D10 -150 1,6 0,15 11 2,96 32,56 20,090

Total Kebutuhan Besi Kolom K11 50,5 114,6Bengkokan dan Bahan Terbuang(10%) 55,54 126,1 44,507 101,031

Kolom K12 400x400 3,2Vol. Beton 0,512m3

Tul. Utama 8D22 8 3,2 25,6 76,416Tul. Kait

Tul.Sengkang

Tumpuan 1D10 -100 1,6 0,1 16 1,36 21,76 13,426Lapangan 1D10 -150 1,6 0,15 11 1,36 14,96 9,230

Total Kebutuhan Besi Kolom K12 22,66 76,42Bengkokan dan Bahan Terbuang(10%) 24,92 84,06 48,676 164,175

Page 111: 0721074 Appendices

203

Tabel L3.6 Perhitungan Kebutuhan Tulangan Kolom per m3 (lanjutan)

Keterangan

PanjangKolom

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

PanjangTulangan Berat Tulangan (Kg)

Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 19 22 25

m m m m m 0,617 1,042 2,226 2,985 3,853 10 13 19 22 25

Kolom K15 200x200 3,2Vol. Beton 0,128m3

Tul.Utama 4D22 4 3,2 12,8 38,208Tul. Kait

Tul.Sengkang

Tumpuan 1D10 -100 1,6 0,1 16 0,56 8,96 5,528Lapangan 1D10 -150 1,6 0,15 11 0,56 6,16 3,801

Total Kebutuhan Besi Kolom K15 9,329 38,21Bengkokan dan Bahan Terbuang(10%) 10,26 42,03 80,171 328,35

Kolom K11A 800x800 3,2(Kolom L) (-) 500x500

Vol. Beton 1,248m3

Tul. Utama 24D22 24 3,2 76,8 229,25Tul. Kait 2D10 -1.000 3,2 1 4 0,48 1,92 1,185Tul.Sengkang

Tumpuan 1D10 -100 1,6 0,1 16 2,96 47,36 29,221Lapangan 1D10 -150 1,6 0,15 11 2,96 32,56 20,090

Total Kebutuhan Besi KolomK11A 50,5 229,2Bengkokan dan Bahan Terbuang(10%) 55,54 252,2 44,507 202,062

Page 112: 0721074 Appendices

204

Tabel L3.6 Perhitungan Kebutuhan Tulangan Kolom per m3 (lanjutan)

Keterangan

PanjangKolom

(L)

PanjangDaerah

Penulangan

SpasiSengkang Pcs

PanjangTulangan Berat Tulangan (Kg)

Kebutuhan Tulangan (kg/m3)Per

Batang Total 10 13 19 22 25

m m m m m 0,617 1,042 2,226 2,985 3,853 10 13 19 22 25

Kolom K3A 500x500 5,5Vol. Beton 1,375m3

Tul. Utama 20D22 20 5,5 110 328,35Tul. Kait 2D10 -1.000 5,5 1 6 0,88 5,28 3,258Tul.Sengkang

Tumpuan 2D10 -100 2,75 0,1 28 3,52 98,56 60,812Lapangan 2D10-150 2,75 0,15 19 3,52 66,88 41,265

Total Kebutuhan Besi Kolom K3A 105,3 328,4Bengkokan dan Bahan Terbuang(10%) 115,9 361,2 84,267 262,68

Page 113: 0721074 Appendices

205

L3.7 Perhitungan Volume Tulangan Pelat

Hasil perhitungan volume tulangan pelat disederhanakan dengan lengkap

dalam Tabel L3.7 sebagai berikut:

Tabel L3.7 Perhitungan Volume Tulangan Pelat

TipeVolume

pelat

KebutuhanTulangan per m3

Kebutuhan Tulangan

Kg Batang

(m3) 10 13 10 13 10 13

Lantai 1S1 41,639 78,664 3.275,496 442,395

S2 22,978 70,067 1.610,033 217,455

S3 8,203 60,279 494,482 66,786

S4 25,809 130,065 3.356,896 453,389

S5 1,680 71,770 120,588 16,287Total 100,310 5.500,599 3.356,896 742,92 453,39

Lantai MezzanineS1 6,430 78,664 505,780 68,312

S2 6,884 70,067 482,340 65,146

S3 1,415 60,279 85,310 11,522Total 14,729 1.073,430 - 144,98 -

Lantai 2S1 38,945 78,664 3.063,565 413,772

S2 14,474 70,067 1.014,183 136,978

S3 5,654 60,279 340,806 46,030Total 59,073 4.418,554 - 596,78 -

Page 114: 0721074 Appendices

206

Tabel L3.7 Perhitungan Volume Tulangan Pelat (lanjutan)

TipeVolume

pelat

KebutuhanTulangan per m3

Kebutuhan Tulangan

Kg Batang

(m3) 10 13 10 13 10 13

Lantai 3S1 33,719 78,664 2.652,442 358,244

S3 10,583 60,279 637,905 86,157

S11 14,268 62,324 889,221 120,100Total 68,763 4.179,568 - 564,50 -

Lantai 4 s/ 9S3 3,946 60,279 237,873 32,128

S6 43,502 64,140 2.790,198 376,850

S7 11,844 47,155 558,493 75,431

S8 13,1015 39,426 516,533 69,764Total 72,393 9.171,887 - 554,17 -

Lantai 10S3 3,946 60,279 237,873 32,128

S9 18,645 51,694 963,853 130,180

S10 15,156 66,837 1.012,961 136,813

S11 17,716 62,324 1.104,108 149,123

S12 15,947 65,581 1.045,811 141,249Total 71,410 4.126,733 - 589,49 -

Page 115: 0721074 Appendices

207

L3.8 Perhitungan Volume Tulangan Balok

Hasil perhitungan volume tulangan balok disederhanakan dengan lengkap

dalam Tabel L3.8 sebagai berikut:

Page 116: 0721074 Appendices

208

Tabel L3.8 Perhitungan Volume Tulangan Balok

TipeVolumeBeton

Kebutuhan TulanganKg Batang

(m3) 10 13 16 19 22 10 13 16 19 22

Lantai 1B4

0,7X0,5 2,800 72,757 374,319 9,827 10,468

B80,4X0,7 6,440 253,586 717,445 34,250 20,063

B100,4X0,6 7,356 352,780 603,836 47,647 16,886

B10B0,4X0,6 3,840 191,991 1.076,988 25,931 30,117

B140,3X0,7 9,262 491,894 1.086,092 66,436 30,372

B170,3X0,6 13,878 729,682 1.518,947 98,552 42,476

B17B0,3X0,6 11,592 959,834 1.903,117 129,637 53,219

Page 117: 0721074 Appendices

209

Tabel L3.8 Perhitungan Volume Tulangan Balok (lanjutan)

TipeVolumeBeton

Kebutuhan TulanganKg Batang

(m3) 10 13 16 19 22 10 13 16 19 22

B180,3X0,5 22,264 1.056,393 2.725,751 142,679 101,859

B18A0,3X0,5 2,805 104,112 429,810 14,062 12,019

B190,25X0,5 18,743 627,220 1.561,626 84,714 82,364

B200,2X0,4 2,630 119,147 342,387 16,092 18,058

Total Lantai 1 101,609 4.959,396 - 1.904,013 2.725,751 7.710,553 669,83 - 100,42 101,86 215,62

Lantai MezannineB8

0,4X0,7 8,806 473,469 1.734,870 63,948 48,514

B8A0,4X0,7 1,540 80,032 180,593 10,809 5,050

Page 118: 0721074 Appendices

210

Tabel L3.8 Perhitungan Volume Tulangan Balok (lanjutan)

TipeVolumeBeton

Kebutuhan TulanganKg Batang

(m3) 10 13 16 19 22 10 13 16 19 22

B140,3X0,7 6,353 337,387 744,944 45,568 20,832

B14A0,3X0,7 0,341 8,382 17,238 1,132 0,482

B170,3X0,6 4,685 246,303 512,719 33,266 14,338

B180,3X0,5 8,179 388,074 1.001,324 52,414 37,419

B18C0,3X0,5 2,355 124,928 592,836 16,578

B200,2X0,4 1,459 66,088 189,914 8,926 10,017

Total Lantai Mezzanine 33,717 1.724,664 - 189,914 1.001,324 3.783,199 216,06 - 10,02 37,42 105,79

6.699,101

Page 119: 0721074 Appendices

211

Tabel L3.8 Perhitungan Volume Tulangan Balok (lanjutan)

TipeVolumeBeton

Kebutuhan TulanganKg Batang

(m3) 10 13 16 19 22 10 13 16 19 22

Lantai 2B2

0,9X0,5 7,931 459,344 810,204 62,040 22,657

B30,7X1,5 19,320 84,865 1.807,145 1.918,221 11,462 144,803 53,642

B3A0,7X1,5 18,323 64,775 1.181,622 1.041,276 8,749 94,681 29,118

B40,7X0,5 5,600 145,513 748,638 19,653 20,935

B4A0,7X0,5 0,534 8,188 25,614 1,106 0,716

B60,4X0,8 11,275 671,373 1.156,921 90,677 32,352

B6A0,4X0,8 10,112 706,549 1.348,862 95,428 37,720

Page 120: 0721074 Appendices

212

Tabel L3.8 Perhitungan Volume Tulangan Balok (lanjutan)

TipeVolumeBeton

Kebutuhan TulanganKg Batang

(m3) 10 13 16 19 22 10 13 16 19 22

B80,4X0,7 1,582 85,059 311,670 11,488 8,716

B8A0,4X0,7 5,600 291,027 656,700 39,307 18,364

B140,3X0,7 12,957 688,159 1.519,440 92,944 42,490

B14A0,3X0,7 4,037 99,168 203,943 13,394 5,703

B14B0,3X0,7 2,016 110,298 370,379 14,897 10,357

B14C0,3X0,7 0,714 68,116 126,989 9,200 3,551

B170,3X0,6 3,218 169,171 352,155 22,849 9,848

Page 121: 0721074 Appendices

213

Tabel L3.8 Perhitungan Volume Tulangan Balok (lanjutan)

TipeVolumeBeton

Kebutuhan TulanganKg Batang

(m3) 10 13 16 19 22 10 13 16 19 22

B17A0,3X0,6 0,275 7,637 14,369 1,032 0,402

B17C0,3X0,6 2,826 226,751 644,387 30,625 18,020

B180,3X0,5 11,726 556,399 1.435,645 75,148 53,649

B18A0,3X0,5 0,945 35,075 144,802 4,737 4,049

B190,25X0,5 11,891 397,934 990,76 53,746 52,255

Total Lantai 2 130,881 4.875,401 2.988,767 990,76 1.435,645 1.1394,57 658,48 239,48 52,26 53,65 318,642.1685,143

Lantai 3B3

0,7X1,5 20,370 89,477 1.905,359 2.022,472 12,085 152,673 56,557

Page 122: 0721074 Appendices

214

Tabel L3.8 Perhitungan Volume Tulangan Balok (lanjutan)

TipeVolumeBeton

Kebutuhan TulanganKg Batang

(m3) 10 13 16 19 22 10 13 16 19 22

B3A0,7X1,5 24,045 85,004 1.550,65 1.366,473 11,481 124,251 38,212

B40,7X0,5 1,068 27,738 142,709 3,746 3,991

B60,4X0,8 1,664 99,083 170,742 13,382 4,775

B6A0,4X0,8 7,328 512,024 977,498 69,155 27,335

B8A0,4X0,7 2,044 106,225 239,696 14,347 6,703

B140,3X0,7 22,435 1.191,552 2.630,921 160,934 73,572

B14A0,3X0,7 3,989 97,987 201,514 13,234 5,635

Page 123: 0721074 Appendices

215

Tabel L3.8 Perhitungan Volume Tulangan Balok (lanjutan)

TipeVolumeBeton

Kebutuhan TulanganKg Batang

(m3) 10 13 16 19 22 10 13 16 19 22

B14B0,3X0,7 17,637 964,939 3.240,236 130,327 90,611

B14C0,3X0,7 1,512 144,246 268,919 19,482 7,520

B160,5X1 3,875 149,809 699,796 20,234 19,569

B170,3X0,6 1,661 87,306 181,742 11,792 5,082

B17A0,3X0,6 0,293 8,138 15,311 1,099 0,428

B180,3X0,5 15,019 712,625 1.838,746 96,249 68,712

B190,25X0,5 10,598 354,648 882,988 47,899 46,571

Page 124: 0721074 Appendices

216

Tabel L3.8 Perhitungan Volume Tulangan Balok (lanjutan)

TipeVolume Beton

Kebutuhan TulanganKg Batang

(m3) 10 13 16 19 22 10 13 16 19 22

B200,2X0,4 0,168 7,611 21,871 1,028 1,154

Total Lantai 3 133,704 4.638,413 3.456,009 904,859 1.838,746 1.2158,027 626,47 276,92 47,72 68,71 339,99

Lantai 4 s/d 9B1

1,4X0,4 6,496 576,540 704,639 77,869 19,705

B1A1,4X0,4 3,584 173,313 346,738 23,408 9,696

B40,7X0,5 1,295 33,650 173,123 4,545 4,841

B120,55X0,5 27,316 1.080,667 3.587,651 145,957 100,326

B12A0,55X0,5 6,600 189,154 1.024,452 25,548 28,648

B140,3X0,7 11,190 594,304 1.312,210 80,268 36,695

Page 125: 0721074 Appendices

217

Tabel L3.8 Perhitungan Volume Tulangan Balok (lanjutan)

TipeVolumeBeton

Kebutuhan TulanganKg Batang

(m3) 10 13 16 19 22 10 13 16 19 22

B14A0,3X0,7 1,055 25,920 53,306 3,501 1,491

B14B0,3X0,7 1,276 69,798 234,380 9,427 6,554

B14C0,3X0,7 0,546 52,089 97,110 7,035 2,716

B170,3X0,6 1,129 59,340 123,525 8,015 3,454

B180,3X0,5 7,680 364,409 940,262 49,218 35,137

B18A0,3X0,5 4,500 167,025 689,535 22,559 19,282

B190,25X0,5 2,269 75,922 189,029 10,254 9,970

Total Lantai 4 s/d 9 74,935 3.462,130 - 189,029 940,262 8.346,668 467,60 - 9,97 35,14 233,41

Page 126: 0721074 Appendices

218

Tabel L3.8 Perhitungan Volume Tulangan Balok (lanjutan)

TipeVolumeBeton

Kebutuhan TulanganKg Batang

(m3) 10 13 16 19 22 10 13 16 19 22

Lantai 10B6

0,4X0,8 16,908 1.006,802 1.734,936 135,981 48,516

B6A0,4X0,8 0,472 32,980 62,961 4,454 1,761

B140,3X0,7 32,348 1.718,059 3.793,436 232,045 106,08

B14A0,3X0,7 3,145 77,245 158,858 10,433 4,442

B14B0,3X0,7 0,714 39,064 131,176 5,276 3,668

B14C0,3X0,7 0,546 52,089 97,110 7,035 2,716

B170,3X0,6 11,612 610,529 1.270,912 82,459 35,540

Page 127: 0721074 Appendices

219

Tabel L3.8 Perhitungan Volume Tulangan Balok (lanjutan)

TipeVolumeBeton

Kebutuhan TulanganKg Batang

(m3) 10 13 16 19 22 10 13 16 19 22

B17A0,3X0,6 1,008 28,045 52,764 3,788 1,476

B180,3X0,5 5,280 250,531 646,430 33,837 24,157

B190,25X0,5 6,854 229,378 571,096 30,980 30,121

Total Lantai 10 78,888 4.044,721 - 571,096 646,430 7.302,152 546,29 - 30,12 24,16 204,20

Page 128: 0721074 Appendices

220

L3.9 Perhitungan Volume Tulangan Kolom

Hasil perhitungan volume tulangan kolom disederhanakan dengan lengkap

dalam Tabel L3.9 sebagai berikut:

Page 129: 0721074 Appendices

221

Tabel L3.9 Perhitungan Volume Tulangan Kolom

Tipeb h Volume Kebutuhan Tulangan

Kg Batang(m) (m) (m3) 10 13 19 22 25 10 13 19 22 25

Lantai 1K1 0,6 0,6 7,920 293,1984 866,844 39,600 24,240604K2 0,5 0,8 17,600 655,026944 1.733,688 88,4693 48,481208K2A 0,5 0,8 19,800 1.059,545718 3.900,798 143,105 109,08272K3A 0,7 1,5 11,550 973,2883776 3.033,954 131,454 84,842114K7B 0,7 0,8 12,320 23,79835446 1.733,688 1.118,9112 3,21426 48,481208 24,218857Total Lantai 1 69,190 3004,858 - - 1.1268,972 1.118,911 405,84 - - 315,13 24,22

Lantai2K1 0,6 0,6 4,680 173,2536 512,226 23,4 14,324K1A 0,6 0,6 4,680 51,30972 212,918 1.280,565 6,93 17,0607 35,810K2 0,5 0,8 33,800 1.257,949472 3.329,469 169,901 93,106K4 0,4 0,4 1,040 46,1516 170,742 6,23333 4,775K7A 0,7 0,8 10,920 21,093996 1.792,791 1.652,937 2,849 50,134 35,777857K7B 0,7 0,8 3,640 7,031332 512,226 330,5874 0,94967 14,324 7,1555714K9 0,7 0,7 4,290 178,308064 682,968 24,0827 19,099K10B 0,4 0,75 3,900 7,499635 512,226 661,1748 1,01292 14,324 14,311143K11 0,8 0,8 5,070 225,6507825 832,36725 30,4769 23,276K11A 0,8 0,8 2,535 112,8253913 512,226 15,2384 14,324Total Lantai 2 67,600 2.081,074 212,918 - 1.0137,806 2.644,699 281,07 17,06 - 283,50 57,24

Page 130: 0721074 Appendices

222

Tabel L3.9 Perhitungan Volume Tulangan Kolom (lanjutan)

Tipeb h Volume Kebutuhan Tulangan

Kg Batang(m) (m) (m3) 10 13 19 22 25 10 13 19 22 25

Lantai 3K3 0,5 0,5 0,800 31,057 126,086 4,19467 3,526K9 0,7 0,7 2,112 87,782 336,230 11,8561 9,402K10 0,4 0,75 12,480 527,092 24,486 1.639,123 71,1902 0,915 45,837K10A 0,4 0,75 0,960 40,546 210,144 5,47617 5,877K10B 0,4 0,75 3,840 7,384 504,346 651,00288 0,99733 14,104 14,091K11 0,8 0,8 3,744 166,634 614,671 22,506 17,189K15 0,2 0,2 1,536 123,143 504,346 16,632 14,104Total Lantai 3 22,048 983,639 - 24,486 3.934,946 651,003 132,85 - 0,92 110,04 14,09

Lantai 4K3 0,5 0,5 0,800 31,057 126,086 4,195 3,526K6 0,3 0,75 6,480 318,487 756,518 43,016 21,155K6A 0,3 0,75 2,160 106,162 378,259 14,339 10,578K6B 0,3 0,75 3,600 176,937 945,648 23,898 26,444K6D 0,3 0,75 0,720 35,387 252,173 4,780 7,052K9 0,7 0,7 2,112 87,782 336,230 11,856 9,402K11 0,8 0,8 2,496 111,090 409,781 15,004 11,459K11A 0,8 0,8 1,248 55,545 252,173 7,502 7,052Total Lantai 4 16,192 922,448 - - 3.456,869 - 124,59 - - 96,67 -

Page 131: 0721074 Appendices

223

Tabel L3.9 Perhitungan Volume Tulangan Kolom (lanjutan)

Tipeb h Volume Kebutuhan Tulangan

Kg Batang(m) (m) (m3) 10 13 19 22 25 10 13 19 22 25

Lantai 5K3 0,5 0,5 0,800 31,057 126,086 4,195 3,526K6 0,3 0,75 7,920 389,262 924,634 52,575 25,857K6A 0,3 0,75 1,440 70,775 252,173 9,559 7,052K6B 0,3 0,75 2,880 141,550 756,518 19,118 21,155K6D 0,3 0,75 0,720 35,387 252,173 4,780 7,052K9 0,7 0,7 2,112 87,782 336,230 11,856 9,402K11 0,8 0,8 2,496 111,090 409,781 15,004 11,459K11A 0,8 0,8 1,248 55,545 252,173 7,502 7,052Total Lantai 5 16,192 922,448 - - 3.309,768 - 124,59 - - 92,56 -

Lantai 6K3 0,5 0,5 0,800 31,057 126,086 4,195 3,526K6 0,3 0,75 7,200 353,874 840,576 47,795 23,506K6A 0,3 0,75 3,600 176,937 630,432 23,898 17,630K6B 0,3 0,75 2,160 106,162 567,389 14,339 15,867K9 0,7 0,7 2,112 87,782 336,230 11,856 9,402K11 0,8 0,8 2,496 111,090 409,781 15,004 11,459K11A 0,8 0,8 1,248 55,545 252,173 7,502 7,052Total Lantai 6 16,192 922,448 - - 3.162,667 - 124,59 - - 88,44 -

Page 132: 0721074 Appendices

224

Tabel L3.9 Perhitungan Volume Tulangan Kolom (lanjutan)

Tipeb h Volume Kebutuhan Tulangan

Kg Batang(m) (m) (m3) 10 13 19 22 25 10 13 19 22 25

Lantai 7K3 0,5 0,5 0,800 31,057 126,086 4,195 3,526K6 0,3 0,75 7,920 389,262 924,634 52,575 25,857K6A 0,3 0,75 4,320 212,325 756,518 28,677 21,155K6B 0,3 0,75 0,720 35,387 189,130 4,780 5,289K9 0,7 0,7 2,112 87,782 336,230 11,856 9,402K11 0,8 0,8 2,496 111,090 409,781 15,004 11,459K11A 0,8 0,8 1,248 55,545 252,173 7,502 7,052Total Lantai 7 16,192 922,448 - - 2.994,552 - 124,59 - - 83,74 -

Lantai 8K3 0,5 0,5 0,800 31,057 126,086 4,195 3,526K6 0,3 0,75 7,200 353,874 840,576 47,795 23,506K6A 0,3 0,75 5,040 247,712 882,605 33,457 24,681K6B 0,3 0,75 0,720 35,387 189,130 4,780 5,289K9 0,7 0,7 2,112 87,782 336,230 11,856 9,402K11 0,8 0,8 3,744 166,634 614,671 22,506 17,189Total Lantai 8 16,192 922,448 - - 2.989,298 - 124,59 - - 83,59 -

Page 133: 0721074 Appendices

225

Tabel L3.9 Perhitungan Volume Tulangan Kolom (lanjutan)

Tipeb h Volume Kebutuhan Tulangan

Kg Batang(m) (m) (m3) 10 13 19 22 25 10 13 19 22 25

Lantai 9K3 0,5 0,5 0,800 31,057 126,086 4,195 3,526K6 0,3 0,75 3,600 176,937 420,288 23,898 11,753K6A 0,3 0,75 4,320 212,325 756,518 28,677 21,155K6B 0,3 0,75 4,320 212,325 1.134,778 28,677 31,733K6D 0,3 0,75 0,720 35,387 252,173 4,780 7,052K9 0,7 0,7 2,112 87,782 336,230 11,856 9,402K11 0,8 0,8 3,744 166,634 614,671 22,506 17,189Total Lantai 9 16,192 922,448 - - 3.640,745 - 124,59 - - 101,81 -

Lantai 10K3 0,5 0,5 0,800 31,057 126,086 4,195 3,526K6 0,3 0,75 2,880 141,550 336,230 19,118 9,402K6A 0,3 0,75 2,160 106,162 378,259 14,339 10,578K6B 0,3 0,75 0,720 35,387 189,130 4,780 5,289K9 0,7 0,7 2,112 87,782 336,230 11,856 9,402K11 0,8 0,8 5,792 257,785 950,902 34,817 26,591Total Lantai 10 11,040 659,724 - - 2.316,838 - 89,10 - - 64,79 -

Page 134: 0721074 Appendices

Universitas Kristen Maranatha 226

LAMPIRAN IV

TIME SCHEDULE

L4.1 Master Schedule

L4.2 Schedule Pekerjaan Beton

Page 135: 0721074 Appendices

L4.1Master Schedule

MASTER SCHEDULEPROYEK HOTEL DAGO PARADISE

JL IR. H. JUANDA BANDUNG

25 AGUSTUS 2007 s/d 23 APRIL 2008

PEKERJAAN STRUKTUR, ARSITEKTUR, DAN PLUMBING

AGS

NO ITEM PEKERJAAN BOBOT 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 3 10 17 24 2 9 16 23 30 6 13 20 KETERANGAN

(%) 25 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 2 9 16 23 1 8 15 22 29 5 12 19 26

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

I PEKERJAAN PERSIAPAN 5.0404 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527 0.1527

II PEKERJAAN SOLDIER PILE

1 PENGEBORAN SOLDIER PILE 0.6450 0.2150 0.2150 0.2150

2 PEMBETONAN 1.0462 0.3487 0.3487 0.3487

3 PEMBESIAN 0.8798 0.3666 0.3666 0.1466

4 BUANG TANAH 0.0500 0.0250 0.0250

5 RETAINING WALL DAN SHOTCRETE 1.7483 0.0822 0.0822 0.9504 0.6336

6 CAPING BEAM 0.5589 0.0931 0.2329 0.2329

III PEKERJAAN TANAH

1 PEMBERSIHAN LOKASI 0.0114 0.0114

2 GALIAN DAN BUANGAN TANAH 1.3500 0.4500 0.4500 0.4500

3 PEKERJAAN URUGAN 0.1783 0.1783

4 PEKERJAAN LAIN-LAIN 0.1586 0.0396 0.0396 0.0396 0.0396

IV PEKERJAAN BETON

1 LANTAI KERJA 0.1293 0.0646 0.0646

2 BETON, BESI, ACUAN

a Pit, GWT, Gutter, Pondasi, STP, Prasarana luar 0.6553 0.3277 0.3277

b Lantai Basement 2 8.3126 2.2028 2.2028 3.9069

c Lantai Basement 1 2.7896 1.0693 1.0693 0.6509

d Lantai 1 2.9666 1.4833 1.4833

e Lantai Mezzanin 1.0115 0.5058 0.5058

f Lantai 2 3.2305 1.6153 1.6153

g Lantai 3 2.4734 1.2367 1.2367

h Lantai 4 1.7212 0.8606 0.8606

i Lantai 5 1.7132 0.8566 0.8566

j Lantai 6 1.6950 0.8475 0.8475

k Lantai 7 1.6950 0.8475 0.8475

l Lantai 8 1.6950 0.8475 0.8475

m Lantai 9 1.7066 0.8533 0.8533

n Lantai 10 1.9050 0.9525 0.9525

o Lantai Atap 0.6852 0.3426 0.3426

p Tangga 0.5544 0.0762 0.0762 0.0762 0.0762 0.0624 0.0624 0.0624 0.0624

q Ramp 0.8140 0.2713 0.2713 0.1357 0.1357

5 PEKERJAAN LAIN-LAIN

a Waterproofing Integral 0.6386 0.1277 0.1277 0.1277 0.1916 0.0639

b Waterproofing Membrane 0.2198 0.0733 0.0733 0.0733

c Waterproofing Tangki Air 0.1588 0.0371 0.0371 0.0847

d Waterproofing STP 0.0062 0.0062

e Waterstop 0.0982 0.0491 0.0491

6 PEKERJAAN BAJA SPARATOR BEAM (CANOPY DROP OFF) 1.0221 0.2555 0.2555 0.2555 0.2555

V PEKERJAAN DINDING

1 PASANGAN DINDING DAN PELAPIS DINDING -

a Lantai Basement 2 0.8819 0.0353 0.3175 0.1764 0.1764 0.1764

b Lantai Basement 1 0.5376 0.1075 0.1075 0.1075 0.1075 0.1075

c Lantai 1 0.9438 0.1888 0.1888 0.1888 0.1888 0.1888

d Lantai Mezzanine 0.1896 0.0632 0.0632 0.0632

e Lantai 2 0.9782 0.1956 0.2348 0.2152 0.1956 0.1369

f Lantai 3 1.1864 0.2373 0.2373 0.2373 0.2373 0.2373

g Lantai 4 0.8401 0.1680 0.1680 0.1680 0.1680 0.1680

h Lantai 5 0.8401 0.1680 0.1680 0.1680 0.1680 0.1680

i Lantai 6 0.8401 0.1680 0.1680 0.1680 0.1680 0.1680

j Lantai 7 0.8401 0.1680 0.1680 0.1680 0.1680 0.1680

k Lantai 8 0.8401 0.1680 0.1680 0.1680 0.1680 0.1680

l Lantai 9 0.8401 0.1680 0.1680 0.1680 0.1680 0.1680

m Lantai 10 0.5040 0.1260 0.1260 0.1260 0.1260

n Lantai Atap 0.0062 0.0031 0.0031

o Tangga 0.1782 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297

p Ramp 0.0010 0.0005 0.0005

2 PEK LAIN-LAIN TANGGA DAN FAÇADE 5.9130 0.5913 0.5913 0.5913 0.5913 0.5913 0.5913 0.5913 0.5913 0.5913 0.5913

VI PEKERJAAN PINTU DAN JENDELA

1 PINTU 2.5348 0.1491 0.1491 0.1491 0.1491 0.1491 0.1491 0.1491 0.1491 0.1491 0.1491 0.1491 0.1491 0.1491 0.1491 0.1491 0.1491 0.1491

2 JENDELA 1.2438 0.0888 0.0888 0.0888 0.0888 0.0888 0.0888 0.0888 0.0888 0.0888 0.0888 0.0888 0.0888 0.0888 0.0888

3 HARDWARE 2.5077 0.1791 0.1791 0.1791 0.1791 0.1791 0.1791 0.1791 0.1791 0.1791 0.1791 0.1791 0.1791 0.1791 0.1791

VII PEKERJAAN LANTAI

1 PELAPIS LANTAI DAN PLINT LANTAI

a Lantai Basement 2 0.2853 0.0951 0.0951 0.0951

b Lantai Basement 1 0.1684 0.0561 0.0561 0.0561

c Lantai 1 0.8158 0.2719 0.2719 0.2719

d Lantai Mezzanin 0.0748 0.0374 0.0374

e Lantai 2 0.8008 0.2669 0.2669 0.2669

f Lantai 3 0.6038 0.2013 0.2013 0.2013

g Lantai 4 0.5825 0.1942 0.1942 0.1942

h Lantai 5 0.5825 0.1942 0.1942 0.1942

i Lantai 6 0.5825 0.1942 0.1942 0.1942

j Lantai 7 0.5825 0.1942 0.1942 0.1942

k Lantai 8 0.5825 0.1942 0.1942 0.1942

l Lantai 9 0.5825 0.1942 0.1942 0.1942

m Lantai 10 0.1924 0.0962 0.0962

n Lantai Atap 0.0135 0.0135

o Tangga 0.2310 0.0577 0.0577 0.0577 0.0577

p Ramp 0.0685 0.0342 0.0342

2 STEP NOSING ANDESIT 0.0740 0.0185 0.0185 0.0185 0.0185

3 TRESHOLD 0.0395 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040

4 WATERPROOFING 0.1713 0.0165 0.0165 0.0165 0.0165 0.0132 0.0132 0.0132 0.0132 0.0132 0.0132 0.0132 0.0132

VIII PEKERJAAN PLAFOND

1 PLAFOND DAN PENGECATAN PLAFOND

a Lantai Basement 2 0.0301 0.0100 0.0100 0.0100

b Lantai Basement 1 0.0375 0.0125 0.0125 0.0125

c Lantai 1 0.1580 0.0592 0.0395 0.0296 0.0296

d Lantai Mezzanin 0.0448 0.0149 0.0149 0.0149

e Lantai 2 0.1936 0.0484 0.0484 0.0484 0.0484

f Lantai 3 0.0315 0.0079 0.0079 0.0079 0.0079

g Lantai 4 0.0452 0.0113 0.0113 0.0113 0.0113

h Lantai 5 0.0452 0.0113 0.0113 0.0113 0.0113

i Lantai 6 0.0452 0.0113 0.0113 0.0113 0.0113

j Lantai 7 0.0452 0.0113 0.0113 0.0113 0.0113

k Lantai 8 0.0452 0.0113 0.0113 0.0113 0.0113

l Lantai 9 0.0452 0.0113 0.0113 0.0113 0.0113

m Lantai 10 0.0462 0.0116 0.0116 0.0116 0.0116

n Lantai Atap

o Tangga 0.0294 0.0098 0.0098 0.0098

p Ramp 0.0134 0.0067 0.0067

2 PEKERJAAN LAIN-LAIN (Curtain Cove dan Drop Ceiling) 0.1716 0.0191 0.0191 0.0191 0.0191 0.0191 0.0191 0.0191 0.0191 0.0191

IX PEKERJAAN SANITAIR

1 SANITAIR 4.5691 0.3046 0.3046 0.3046 0.3046 0.3046 0.3046 0.3046 0.3046 0.3046 0.3046 0.3046 0.3046 0.3046 0.3046 0.3046

2 CERMIN 0.2353 0.0196 0.0196 0.0196 0.0196 0.0196 0.0196 0.0196 0.0196 0.0196 0.0196 0.0196 0.0196

3 VANITY TOP 0.3370 0.0259 0.0259 0.0259 0.0259 0.0259 0.0259 0.0259 0.0259 0.0259 0.0259 0.0259 0.0259 0.0259

X PEKERJAAN LUAR DAN LAIN-LAIN

1 PEKERJAAN RAILING TANGGA & GRILL 0.1059 0.0177 0.0177 0.0177 0.0177 0.0177 0.0177

2 KELENGKAPAN PARKIR 0.1051 0.0263 0.0263 0.0263 0.0263

3 PEKERJAAN TROTOAR & PEDESTRIAN 0.0424 0.0141 0.0141 0.0141

XI PEKERJAAN PLUMBING

1 PERALATAN 4.8734 0.7310 0.7310 0.7310 0.7310 0.4873 0.4873 0.4873 0.2437 0.2437

2 LANTAI BASEMENT 2 1.0871 0.0435 0.2174 0.2174 0.3044 0.3044

3 LANTAI BASEMENT 1 0.4125 0.0688 0.1375 0.2063

4 LANTAI 1 0.5272 0.1757 0.1757 0.1757

5 LANTAI MEZZANIN 0.0210 0.0070 0.0070 0.0070

6 LANTAI 2 0.7502 0.2501 0.2501 0.2501

7 LANTAI 3 0.5188 0.1729 0.1729 0.1729

8 LANTAI 4, 6, 7, 8 1.1025 0.1838 0.1838 0.1838 0.1838 0.1838 0.1838

9 LANTAI 5 0.4913 0.1638 0.1638 0.1638

10 LANTAI 9 0.4111 0.1370 0.1370 0.1370

11 LANTAI 10 0.2743 0.0914 0.0914 0.0914

12 LANTAI ATAP 0.0284 0.0071 0.0071 0.0071 0.0071

13 SHAFT (RISER) 1.4584 0.2431 0.2431 0.3241 0.2431 0.0810 0.0810 0.0810 0.0810 0.0810

XII PEKERJAAN TAMBAH

1 PEKERJAAN ARSITEKTUR 1.6292 0.0857 0.0857 0.0857 0.0857 0.0857 0.0857 0.0857 0.0857 0.0857 0.0857 0.0857 0.0857 0.0857 0.0643 0.0643 0.0643 0.0643 0.0857 0.0857 0.0857

2 PEKERJAAN STRUKTUR 0.7306 0.1826 0.0365 0.4749 0.0365

3 PEKERJAAN PLUMBING 0.0173 0.0058 0.0058 0.0058

XIII BIAYA KOORDINASI

XIV PROVISIONAL SUMS AND DAYWORK ALLOWANCE 100.0000

JUMLAH 100.00 AGS

19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 3 10 17 24 2 9 16 23 30 6 13 20

25 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 2 9 16 23 1 8 15 22 29 5 12 19 26

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

RENCANA PROGRESS MINGGUAN - 0.1527 1.0945 1.6908 1.6106 0.9574 0.8495 - - 3.0904 2.9582 4.2239 2.3703 2.7915 3.6116 2.7617 3.6402 3.5195 3.2714 4.6608 5.0356 5.3029 5.4106 5.3203 4.9959 4.3998 4.2640 4.0375 3.5914 3.2430 2.6928 2.4377 2.2799 1.7246 1.4917 0.5173

RENCANA AKUMULATIF PROGRESS MINGGUAN - 0.1527 1.2472 2.9381 4.5487 5.5061 6.3556 6.3556 6.3556 9.4460 12.4042 16.6281 18.9984 21.7899 25.4014 28.1631 31.8033 35.3228 38.5942 43.2550 48.2906 53.5935 59.0041 64.3244 69.3203 73.7201 77.9841 82.0216 85.6130 88.8560 91.5488 93.9865 96.2664 97.9910 99.4827 100.0000

RENCANA PROGRESS MINGGUAN MINIMUMRENCANA AKUMULATIF PROGRESS MINGGUAN MINIMUM

REALISASI PROGRESS MINGGUAN 0.1527 0.6209 1.8876 1.7771 1.3456 1.1546 2.6549 3.2654 3.9097 2.7543 2.8456 3.7734 3.2458 3.7534 3.6542 3.7834 4.2320 4.3521 5.6754 5.5761

REALISASI AKUMULATIF PROGRESS MINGGUAN 0.1527 0.7737 2.6613 4.4384 5.7840 6.9386 6.9386 6.9386 9.5935 12.8589 16.7686 19.5229 22.3685 26.1419 29.3877 33.1411 36.7953 40.5787 44.8107 49.1628 54.8382 60.4143

DEVIASI (REALISASI-RENCANA) 0.0000 (0.4735) (0.2768) (0.1103) 0.2779 0.5830 0.5830 0.5830 0.1475 0.4547 0.1405 0.5245 0.5786 0.7405 1.2246 1.3378 1.4725 1.9845 1.5557 0.8722 1.2447 1.4102

JANUARI FEBRUARI MARET APRILSEPTEMBER OKTOBER NOVEMBER DESEMBER

APRIL

2007 2008

SEPTEMBER OKTOBER NOVEMBER DESEMBER JANUARI FEBRUARI MARET

227

Page 136: 0721074 Appendices

L4.2 Schedule Pekerjaan Beton

SCHEDULE PEKERJAAN BETON (Upper Structure )

PROYEK HOTEL DAGO PARADISEJL IR. H. JUANDA BANDUNG

NO VOLUME SAT 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 KETERANGAN

I PEKERJAAN PERSIAPAN

II LANTAI 1

1 Kolom

Acuan

Pembesian

Pengecoran

2 Balok & Pelat Lantai

Acuan

Pembesian

Pengecoran

II LANTAI MEZZANINE

Balok & Pelat Lantai

Acuan

Pembesian

Pengecoran

III LANTAI 2

1 Kolom

Acuan

Pembesian

Pengecoran

2 Balok & Pelat Lantai

Acuan

Pembesian

Pengecoran

IV LANTAI 3

1 Kolom

Acuan

Pembesian

Pengecoran

2 Balok & Pelat Lantai

Acuan

Pembesian

Pengecoran

V LANTAI 4

1 Kolom

Acuan

Pembesian

Pengecoran

2 Balok & Pelat Lantai

Acuan

Pembesian

Pengecoran

VI LANTAI 5

1 Kolom

Acuan

Pembesian

Pengecoran

2 Balok & Pelat Lantai

Acuan

Pembesian

Pengecoran

VII LANTAI 6

1 Kolom

Acuan

Pembesian

Pengecoran

2 Balok & Pelat Lantai

Acuan

Pembesian

Pengecoran

VIII LANTAI 7

1 Kolom

Acuan

Pembesian

Pengecoran

2 Balok & Pelat Lantai

Acuan

Pembesian

Pengecoran

IX LANTAI 8

1 Kolom

Acuan

Pembesian

Pengecoran

2 Balok & Pelat Lantai

Acuan

Pembesian

Pengecoran

X LANTAI 9

1 Kolom

Acuan

Pembesian

Pengecoran

2 Balok & Pelat Lantai

Acuan

Pembesian

Pengecoran

XI LANTAI 10

1 Kolom

Acuan

Pembesian

Pengecoran

2 Balok & Pelat Lantai

Acuan

Pembesian

Pengecoran

ITEM PEKERJAAN18 19

DESEMBERNOVEMBER

13 14 15 16 17 22 23 24

JANUARI FEBRUARI

20

2007 2008

21

228