030.Bq-2015 Tuntun Miomafo Ttu
-
Upload
shinobiinfiltran -
Category
Documents
-
view
40 -
download
6
description
Transcript of 030.Bq-2015 Tuntun Miomafo Ttu
-
JUMLAH HARGA
(Rp)
I MATERIAL
1 Tiang besi 11 meter 200 daN Btg 213 2 Isolator tumpu 20 kV Bh 577 3 Isolator tarik 20 kV Bh 174 4 Cut Out 20 kV + Fuse Bh 3 5 Lighting Arester 20 kV Bh 3
6 Konduktor AAAC 70 mm2 km 28,397 JUMLAH I
II ANGKUTAN
1 Tiang besi 11 meter 200 daN btg 213 2 Isolator tumpu 20 kV m3 8,251 3 Isolator tarik 20 kV m3 4,019 4 Cut Out 20 kV + Fuse m3 0,025 5 Lighting Arester 20 kV m3 0,025 6 Konduktor AAAC 70 mm2 m3 5,679
JUMLAH II
TOTAL I + IIPPN 10 %JUMLAHDIBULATKAN
Terbilang ;
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN JARINGAN TEGANGAN MENENGAH 20 kVKABUPATEN TIMOR TENGAH UTARA
DESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR030.DL/611/LISDES.NTT/2015
NO URAIAN STN VOLHARGA SATUAN
(Rp)
-
JUMLAH HARGA(Rp)
I MATERIAL
1. Trafo 3 P 50 KVA 20 KV - B2 Buah 3 - 2. Cut Out 20 KV 100 A + Fuse Link Bh 9 - 3. L Arrester 20 KV 10 kA Bh 9 -
JUMLAH I
II ANGKUTAN
1. Trafo 3 P 50 KVA 20 KV - B2 m3 2,078 2. Cut Out 20 KV 100 A + Fuse Link m3 0,208 3. L Arrester 20 KV 10 kA m3 0,075
JUMLAH II
TOTAL I + IIPPN 10 %JUMLAHDIBULATKAN
Terbilang ;
RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN GARDU TRAFO DISTRIBUSI 20 kV
KABUPATEN TIMOR TENGAH UTARADESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR
030.DL/611/LISDES.NTT/2015
NO URAIAN STN VOLHARGA SATUAN
(Rp)
-
JUMLAH HARGA(Rp)
I MATERIAL1 Tiang Besi 9 meter 100 daN btg 71 2 LVTC 3 X 50+1X35 mm2 km 9,833
JUMLAH I
II ANGKUTAN
1 Tiang Besi 9 meter 100 daN btg 71 2 LVTC 3 X 50+1X35 mm2 m3 11,799
JUMLAH II
TOTAL I + IIPPN 10 %JUMLAHDIBULATKAN
Terbilang ;
RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN JARINGAN TEGANGAN RENDAH (LVTC)
KABUPATEN TIMOR TENGAH UTARADESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR
NO JENIS MATERIAL STN VOLHARGA SATUAN
(Rp)
030.DL/611/LISDES.NTT/2015
-
PAKET 014 A3C 70 mm2 = 9,280 kms
SA- JUMLAH
NO. JENIS MATERIAL TU- BAHAN UPAH BAHAN UPAH HARGA
AN RP RP RP RP RP
I MATERIAL UTAMA
1 Tiang besi 11 meter 200 daN Btg 210
2 Isolator tumpu 20 kV Bh 568
3 Isolator tarik 20 kV Bh 174
4 Cut Out 20 kV + Fuse Bh 3
5 Lighting Arester 20 kV Bh 3
6 Konduktor AAAC 70 mm2 kms 9,28
II MATERIAL NON UTAMA
1 Perlengkapan druck schoor set 29
2 Perlengkapan kontramast set 6
3 Treck schoor set 60
4 Cross Arm UNP 100 (Balance) :
a. Type A1 set 112
b. Type A2 set 32
c. Type A3 set 42
d. Type B3 set -
5 H. Type Conector 70 mm2 Bh 90
6 Alluminium Bending wire Mtr 852,00
7 Joint sleeve 70 mm2 Bh 30
8 Penghalang panjat Bh 49
9 Tanda kilat Bh 175
10 Arde TM u/ Arrester Set 1
11 Beton kaki tiang Btg 210
III PEKERJAAN PERSIAPAN
1 Angkutan Material m3 43,39
2 Angkutan Tiang Besi Btg 210
3 Pembersihan Trase Kms 9,28
IV PEKERJAAN FINISHING
1 Foto dokumentasi Lbr 30
2 Gambar Lbr 8
3 Pengecatan tiang Btg 210
4 Komisioning Kms 9,28
SUB. JUMLAH Rp
PPN 10 % Rp
JUMLAH Rp
DIBULATKAN Rp
VOLUME
HARGA SATUAN HARGA BAGIAN
RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN JARINGAN TEGANGAN MENENGAH 20 kV
KABUPATEN TIMOR TENGAH UTARADESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR
030.DL/611/LISDES.NTT/2015
-
PAKET 014 TRAFO 3 PHS 50 KVA = 3 BH
SA- JUMLAH
NO. JENIS MATERIAL TU- BAHAN UPAH BAHAN UPAH HARGA
AN RP RP RP RP RP
I MATERIAL UTAMA
1 Tiang besi 11 meter 200 daN Btg 3
2 Isolator tumpu 20 kV Bh 9
3 Cut Out 20 kV + Fuse Bh 9
4 Lighting Arester 20 kV Bh 9
5 Trafo 3 phs 50 kVA - 20 kV Bh 3
II MATERIAL NON UTAMA
1 Penghalang panjat Bh 3
2 Tanda kilat Bh 3
3 Rangka Dudukan u/.trafo 3 phs Set 3
4 Cross Arm type A1 Set 3
5 Cross Arm u/ dudukan CO Set 3
6 Cross Arm u/ dudukan Arester Set 3
7 LV Board 3 phs 1 tiang 2 Jurusan 2 Pintu Set 3
8 Pipa Inlet-Outlet Medium B + Invoring Set 3
9 Alluminium Bending wire Mtr 13,50
10 Arde Gardu Set 3
11 Arde TM u/ Arrester Set 3
12 Pondasi Lantai Kerja Bh 3
13 Paralel Grove 35 - 70 mm Bh 18
14 Kabel NYY 50 mm2 mtr 288,00
15 Sepatu Kabel AL-CU 35-50 mm2 Bh 12
16 Sepatu Kabel CU 50 mm2 Bh 48
17 Beton kaki tiang Btg 3
III PEKERJAAN PERSIAPAN
1 Pengedropan Material m3 4,68
2 Pengedropan Tiang Besi btg 3
IV PEKERJAAN FINISHING
1 Foto dokumentasi Lbr 6
2 Penomoran Tiang Btg 3
3 Penomoran Tiang Btg 3
4 Komisioning Bh 3
SUB. JUMLAH Rp
PPN 10 % Rp
JUMLAH Rp
DIBULATKAN Rp
RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN GARDU TRAFO DISTRIBUSI 20 kV
KABUPATEN TIMOR TENGAH UTARADESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR
030.DL/611/LISDES.NTT/2015
VOLUME
HARGA SATUAN HARGA BAGIAN
-
PAKET 014 LVTC 3X50+1X35 MM2 = 9,640 KMS
SA- JUMLAH
NO. JENIS MATERIAL TU- BAHAN UPAH BAHAN UPAH HARGA
AN RP RP RP RP RP
I MATERIAL UTAMA
1 Tiang besi 9 mtr 100 daN Btg 71
3 LVTC 3 x 50- + 1 x 35 mm2 km 9,64
II MATERIAL NON UTAMA
1 Perlengkapan druck schoor Set 6
2 Perlengkapan kontramast Set -
3 Treck schoor Set 28
4 Beton kaki tiang btg 71
ACCESSORIES LVTC :
5 Suspension Assembly Set 129
6 Large Angle Assembly Set 38
7 Fixed Dead End Assembly Set 14
8 Adjustable Dead End Assembly Set 14
9 Bundle End Protection Set 14
10 Bimetalic Joint 50 mm2 Bh 16
11 Joint Sleves 50 mm2 Bh 40
12 Arde TR ( 5 ohm ) Set 20
13 Tap Conector Bh 32
III PEKERJAAN PERSIAPAN
1 Pengedropan Material m3 15,47
2 Pengedropan Tiang Besi Btg 71
3 Pembersihan Trase kms 9,64
IV PEKERJAAN FINISHING
1 Foto dokumentasi Lbr 16
2 Gambar revisi Lbr 8
3 Penomoran tiang Btg 181
4 Pengecatan tiang Btg 71
5 Komisioning kms 9,64
SUB. JUMLAH Rp
PPN 10 % Rp
JUMLAH Rp
DIBULATKAN Rp
VOLUME
HARGA SATUAN HARGA BAGIAN
RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN JARINGAN TEGANGAN RENDAH (LVTC)
KABUPATEN TIMOR TENGAH UTARADESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR
030.DL/611/LISDES.NTT/2015
-
SATUAN KERJA LISTRIK PERDESAAN
PROVINSI NUSA TENGGARA TIMUR
I JARINGAN TEGANGAN MENENGAH
- PENGADAAN
- PEMASANGAN
II GARDU DISTRIBUSI 3 150
- PENGADAAN
- PEMASANGAN
III JARINGAN TEGANGAN RENDAH
- PENGADAAN
- PEMASANGAN
Terbilang :
KMS
9,640
KMS
BH/KVA
PT. PLN (PERSERO)
REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN JARINGAN DISTRIBUSI DAN GARDUKABUPATEN TIMOR TENGAH UTARA
DESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR030.DL/611/LISDES.NTT/2015
NO URAIAN SATUANJUMLAH HARGA
RPVOLUME
9,280
-
PT. PLN (Persero) UNIT PELAKSANA KONTRUKSI (UPK) SATKER LISTRIK PERDESAAN NTT
JUMLAH
URAIAN STN VOLUME HARGA
( Rp.) (Rp.)
1 Type A1 Balance UNP 100x50x5x2000
1 UNP 100x50x5x2000 mm Btg 1
2 Pole band 1/2, 4" (6x50) Bh 1
3 Pole band 2/2, 4" (6x50) set 1
4 Arm Tie ( Besi L. 50x4x1270 mm) btng 1
5 Steel plat type 2 bh 2
6 Bollt & nut 5/8 x 70 + ring (galvanis) Bh 5
7 Bollt & nut 5/8 x 140 + ring (galvanis) bh 2
Jumlah
Pembulatan
2 Type A2 Balance UNP 100x50x5x2000
1 UNP 100x50x5x2000 mm Btg 2
2 Pole band 2/2, 4" (6x50) bh 2
3 Steel Plate typre I (6x100x37,5) bh 4
4 Steel Plate typre II (6x100x12) bh 4
5 Arm Tie ( Besi L. 50x4xx 1270 mm) btng 1
6 Bollt & nut 5/8 x 70 + ring (galvanis) Bh 3
7 Bollt & nut 5/8 x 140 + ring (galvanis) bh 14
Jumlah
Pembulatan
3 Type A3 Balance UNP 100x50x5x2000
1 UNP 100x50x5x2000 mm btng 2
2 Pole band 2/2, 4" (6x50) bh 2
3 Steel Plate typre I (6x100x37,5) bh 4
4 Steel Plate typre II (6x100x12) bh 4
5 Arm Tie ( Besi L. 50x4xx 1270 mm) btng 1
6 Bollt & nut 5/8 x 70 + ring (galvanis) Bh 3
7 Bollt & nut 5/8 x 140 + ring (galvanis) bh 14
Jumlah
Pembulatan
4 Type B3 Balance UNP 100x50x5x2200
1 UNP 10x50x5x2200 mm btng 2
2 Pole band 2/2, 4" (6x50) set 2
3 Steel Plate typre I (6x100x37,5) bh 6
4 Bollt & nut 5/8 x 140 + ring (galvanis) bh 12
5 Bollt & nut 5/8 x200 + 4 mur (galv) bh 4
Jumlah
Pembulatan
5 Treck scoor - Guy Wire TM
1 Stall drad 64 mm2 mtr 15
2 Pole band 2/2, 4" (6x50) set 1
3 Bolt nut + Plat & spring plat 5/8" x 50 mm galv bh 2
4 Spanschroef 3/4" / Turn Bucle 50 KN bh 1
5 Guy isolator/tui isolator bh 1
6 Wire clip/cros by 35 mm2 bh 4
7 Stay road 16 mm2 panjang = 2500 mm (anker) btng 1
8 Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Set 2
9 Beton Block 40x40x10 bh 110 U-Bolt 19mm with nut+plat 120x50x5 u/beton blok set 1
Jumlah
Pembulatan
6 Kontramast - Horizontal Guy Wire
1 Stall drad 64 mm2 mtr 26
2 Pole band 2/2, 4" (6x50) set 2
3 Bolt nut + Plat & spring plat 5/8" x 50 mm galv bh 4
4 Spanschroef 3/4" / Turn Bucle 50 KN bh 2
5 Guy isolator/tui isolator bh 2
6 Wire clip/cros by 12 mm2 bh 6
7 Stay road 16 mm2 panjang = 2500 mm (anker) bh 1
8 Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Set 4
9 Beton Block 40 cmx40 cmx10 cm bh 1
10 U-Bolt 19mm with nut+plat 120x50x5 u/beton blok set 1
Jumlah
Pembulatan
ANALISA HARGA SATUAN MATERIAL AKSSESORIS
TAHUN 2015
HARGA SATUANHARGA BAGIAN
NO.
( Rp.)
-
7 Druck Schoor TM
1 Pole band galvanise 1/2 4" bh 1
2 Pole band galvanise 2/2 4" (atas) bh 2
3 Pole band galvanise 2/2 8' (bawah) u/sekang bh 2
4 Pipa galvanise Diameter 2"- panajang 2000 mm btng 1
5 Besi UNP 100x50x5x200 mm u/stop druck btng 1
6 Bolt nut + plat & spring plat 5/8' x 50 mm galv bh 9
Jumlah
Pembulatan
1 M2 CAT TIANG BESI
Cat dasar Kg 0,1
Minyak cat Ltr 0,05
Cat besi Kg 0,15
kuas Lbr 0,1
Pekerja HO 0,3
Mandor HO 0,125
Tukang HO 0,25
Jumlah
Pembulatan
8 Pengecatan T. besi 9 mtr (1 batang) - Material m2/btg 2,814
Upah m2/btg 2,814
Jumlah
Pembulatan
9 Pengecatan T. besi 11 mtr (1 batang) - Material m2/btg 4,691
Upah m2/btg 4,691
Jumlah
Pembulatan
8 ARDE ARESTER
1 Grounding Rod 16 mm2 L = 1750 mm bh 2,00
2 BC 50 mm2 Mtr 15,00
3 Pipa Galvanis 1/2" L= 6000 mm Btg 1,00
4 Klem Steinless Steel 4 titik mtr 4,00
5 Connector CU 35 - 50 mm2 Buah 3,00
6 Stoping Bukle bh 4,00
7 Link 25 x 25 bh 4,00
Jumlah
Pembulatan
9 ARDE GARDU
1 Grounding Rod 16 mm2 L = 1750 mm bh 1,00
2 BC 50 mm2 Mtr 11,00
3 Pipa Galvanis 1/2" L = 2000 mm bh 1,00
4 Klem Steinless Steel 4 titik mtr 4,00
5 Connector Cu 35 - 50 mm mm2 bh 2,00
6 Sepatu Kabel CU 50 mm2 bh 1,00
7 Stoping Bukle bh 4,00
8 Link bh 4,00
Jumlah
Pembulatan
10 RANGKA DUDUKAN TRAFO 25-50 KVA (CANTOL) :
1 UNP 100 x 45x4x1500 mm galv Btg 2,00
2 UNP 100 x 45x4x750 mm galv Btg 2,00
3 UNP 100 x 45x4x 600mm galv btg 2,00
4 Arm tie galvanise 50x50x5 1000 mm btg 2,00
5 Arm tie galvanise 50x50x5 1200 mm btg 2,00
6 Bolt nut + plat & spring plat 5/8" 300 mm bh 2,00
7 Bolt nut + plat & spring plat 5/8" 50 mm bh 18,00
8 Pole band 1/2 6" u penahan dudukan trafo bh 4,00
Jumlah -
Pembulatan -
11 TRAVERS UNTUK CUT OUT DAN ARRESTER :
1 UNP 100x50x5x2000 mm u/dudukan CO dan Arester btg 1,00
2 Pole band 1/2, 4" (6 X 70) bh 1,00
3 Bolt nut + plat & spring plat 5/8" 50 mm bh 2,00
Jumlah
Pembulatan
12 BETON BLOCK UNTUK SCHOOR TARIK
1 Beton Cor : 1 ; 2 ; 3 (40cmx40 cm x10 cm) M3 0,0160
2 Besi Beton 16 mm2 Galvanis L=2500 mm btg 1,0000
3 U. Bolt 3/4" Buah 1,00
Jumlah -
Pembulatan -
-
13 LV Board ( Lemari bagi TR) 2 Jurusan 2 Pintu
1 LV Board ( Lemari bagi TR) 2 Jurusan 2 Pintu set 1,00
2 UNP 100 x 50x100 mm L 1000 mm galv btg 2,00
3 Pole band 1/2, 7" bh 2,00
4 Bolt nut + plat & spring plat 5/8" 50 mm bh 4,00
Jumlah -
Pembulatan
14 Pipa Inlet / Oulet Gardu
1 Pipa 2" Galvanise btg 3,00
2 L - bow pipa PVC 2" u/ bagian atas bh 3,00
3 UNP 100 x 50 x 5 x 500 mm u/ dudukan pipa galv btng 2,00
4 Pole band 1/2 4" bh 2,00
5 Pole band 1/2 2" bh 6,00
6 Bolt nut + plat & spring plat 5/8" 50 mm bh 16,00
Jumlah
Pembulatan
15 PONDASI COR BETON MANSET :
1 M3 COR BETON 1:2:3 :
1 Semen (PC) Zak 8,30
2 Kerikil Beton M3 0,83
3 Pasir Pasangan M3 0,54
4 Pekerja Org 6,00
5 Tukang Batu Org 1,00
6 Kepala Tukang Org 0,10
7 Mandor Org 0,30
Jumlah
Pembulatan
8 Cor Kaki Tiang Besi 11 mtr 200 daN m3 0,118
9 Cor Kaki Tiang Besi 9 mtr 100 daN m3 0,093
10 Cor Lantai Kerja Gardu 120cm x 100 cm x 10 cm m3 0,269
Jumlah
Pembulatan
16 1 M3 GALIAN TANAH BIASA SEDALAM 2 M :
1 Pekerja OH 0,667
2 Tukang Batu OH 0,333
3 Tukang Listrik OH
4 Mandor OH 0,333
Jumlah
Pembulatan
17 1 M3 GALIAN BATU CADAS SEDALAM 2 M :
1 Pekerja OH 2,500
2 Tukang Batu OH 1,250
3 Tukang Listrik OH
4 Mandor OH 1,250
Jumlah
Pembulatan
18 1 M3 URUGAN KEMBALI :
1 Pekerja OH 0,400
2 Tukang Batu OH -
3 Kepala Tukang OH -
4 Mandor OH 0,200
Jumlah
Pembulatan
19 1 M3 PEMADATAN TANAH :
1 Pekerja OH 0,250
2 Tukang Batu OH
3 Kepala Tukang OH
4 Mandor OH 0,125
Jumlah
Pembulatan
RATA2 GALIAN PER M3 NTT(1/2 CADAS+1/2 TANAH) m3 1,00
Volumer galian satu lubang tiang 11m 200 daN m3 0,45
Volumer galian satu lubang tiang 9m 100 daN m3 0,38
Mendirikan tiang 11 m 200 daN
Pekerja HO 0,50
Tukang Listrik HO 0,13
Mandor HO 0,13
Jumlah
Pembulatan
Mendirikan tiang 9 m 100 daN
Pekerja HO 0,33
Tukang Listrik HO 0,08
Mandor HO 0,08
Jumlah
Pembulatan
-
20 MENDIRIKAN TIANG 11 M 200 daN PERMANENT btg 1
21 MENDIRIKAN TIANG 9 M 100 daN PERMANENT btg 1
22 Alluminium Bending wire mtr 1
23 Joint sleeve 70 mm2 bh 1
24 Penghalang panjat bh 1
25 Tanda kilat Kecil bh 1
26 Tanda kilat Besar u. Gardu bh 1
27 Parel Grove 35-70 mm bh 1
28 Sepatu Kabel Cu 50 mm bh 1
29 Sepatu Kabel AL-CU 35-50 mm bh 1
-
PT. PLN (Persero) UNIT PELAKSANA KONTRUKSI (UPK) SATKER LISTRIK PERDESAAN NTT
JUMLAH
NO. URAIAN STN VOL HARGA
( Rp.) ( Rp.) (Rp.)
1 Suspension Assembly
1 Suspension Clamp bh 1
2 Pole Bracket bh 1
3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75
4 Stopping bukle bh 2
5 Plastic strip bh 3
Jumlah
Pembulatan
2 Large Angle Assembly
1 Strain Clamp 25 - 70 bh 2
2 Pole Bracket bh 1
3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75
4 Stopping bukle bh 2
5 Plastic strip bh 3
Jumlah
Pembulatan
3 Fixed Dead And Assembly
1 Strain Clamp 25 - 70 bh 1
2 Pole Bracket bh 1
3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75
4 Stopping bukle bh 2
5 Plastic strip bh 2
Jumlah
Pembulatan
4 Adjustable Dead And Assembly
1 Strain Clamp 25 - 70 bh 1
2 Pole Bracket bh 1
3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75
4 Stopping bukle bh 2
5 Plastic strip bh 2
6 Turn Buckle/Span Scroef bh 1
Jumlah
Pembulatan
5 Bundle Protection
1 Pipa PVC 2" 50 cm bh 1
2 Stainless Steel Strip 20 x 0,7 mm mtr 1,75
3 Stopping bukle Bh 2
4 Link Set 2
5 End cap Set 4
Jumlah
Pembulatan
ANALISA HARGA SATUAN MATERIAL SUTR
TAHUN 2015
HARGA
SATUAN
HARGA
BAGIAN
-
PT. PLN (Persero) UNIT PELAKSANA KONTRUKSI (UPK) SATKER LISTRIK PERDESAAN NTT
JUMLAH
NO. URAIAN STN VOL HARGA
( Rp.) ( Rp.) (Rp.)
ANALISA HARGA SATUAN MATERIAL SUTR
TAHUN 2015
HARGA
SATUAN
HARGA
BAGIAN
6 Treck scoor - Guy Wire TR1 Stall drad 35 mm2 mtr 11 2 Pole band 2/2" dia 4" (45 x 4 mm) bh 1 3 Mur Baut 5/8"-50 mm +Plat+Ring Plat bh 2 4 Spanschroef/ Turn Bucle 17 KN bh 1 5 Guy isolator/tui isolator dia 8 mm bh 1 6 Cousen gegalv 8 mm2 bh 2 7 Stay road 16 mm2 panjang = 1800 mm bh 1 8 Cros by 8 mm2 bh 4 9 Beton Block 40x40x10 dengan besi penguat 8 mm bh 1
10 U bolt 16 mm + nut plat u. Beton block bh 1
Jumlah - Pembulatan -
7 Kontramast - Horizontal Guy Wire
1 Stall drad 35 mm2 mtr 26 2 Pole band 2/2, 4" (6x50) bh 2 3 Bolt nut + Plat & spring plat 5/8" x 50 mm galv bh 4 4 Spanschroef 3/4" / Turn Bucle 17 KN bh 2 5 Guy isolator/tui isolator bh 2 6 Wire clip/cros by 12 mm2 bh 8 7 Stay road 16 mm2 panjang = 2500 mm (anker) bh 1 8 Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Set 4
9 Beton Block 40 cmx40 cmx10 cm bh 1
10 U bolt 16 mm + nut plat u. Beton block bh 1
Jumlah -
Pembulatan -
8 Druck Schoor TR
1 Pole band galvanise 1/2 3" bh 1
2 Pole band galvanise 2/2 3" (atas) bh 2
3 Pole band galvanise 2/2 5' (bawah) u/sekang bh 2
4 Pipa galvanise Diameter 2"- panjang 1200 mm btng 1
5 Besi UNP 8 L=160 mm btng 1
6 Bolt nut + plat & spring plat 5/8' x 50 mm galv bh 9
Jumlah -
Pembulatan -
9 GROUNDING TR
1 Grounding Rod 16 mm2 L = 1750 mm bh 1
2 BC 50 mm2 Mtr 10
3 Pipa Galvanis 1/2" L= 6000 mm Btg 1
4 Klem Steinless Steel 4 titik 3 titik mtr 4
5 AL/CU 35 - 50 mm2 bh 1
6 Electroda clam cu bh 1
7 Stoping bukle bh 4
8 Link 25 x 25 bh 4
Jumlah -
Pembulatan -
10 Tap Connector 25 - 50 mm2 bh 1
11 Compression Joint 50 mm2+ heat shrink set 1
-
I'a .'. -
i:IIi3
t
31
t9F=
9ts
i:9iea
B
i
-
;E
tq9;
iEt6
qE
9B
,5"B
.iil
-JIj
{
F
lIIiI
+ti
i:;
Y\
\."
\
\3F
!;tiA
,:!6.:
t
-
EE
t99;!ii!!
EC
5i
I
x
It
..'
\
?IE
Ie
?z
c:3q