00. Sekat Laporan Akhir
15
BAB I PENDAHULUAN CV CV. . TRIKARYA UTAMA TRIKARYA UTAMA Engineering Consultant STUDIES, TOPOGRAPHY, SOIL MECHANIC, DESIGN & SUPERVISI Jl. AP. Pranoto RT. IV No. 23F TELP:(0541)663344 eMail : [email protected] TENGGARONG – KALIMANTAN TIMUR
-
Upload
iwansurahmat -
Category
Documents
-
view
272 -
download
3
description
kk
Transcript of 00. Sekat Laporan Akhir
BAB IPENDAHULUAN
BAB IIGAMBARAN UMUM LOKASI PERENCANAAN
BAB IIIKONSTRUKSI PERKERASAN KAKU(RIGID PAVEMENT)
BAB IVPERENCANAAN GEOMETRIK JALAN
BAB VDESAIN PERKERASAN BETON
BAB VIVOLUME DAN BIAYA
BAB VIIPENUTUP
LAMPIRAN 01DATA PENGUKURAN TOPOGRAFI
LAMPIRAN 02DOKUMENTASI KEGIATAN
LAMPIRAN 03ENGINEER ESTIMATE
LAMPIRAN 04GAMBAR RENCANA
CV. TRIKARYA UTAMAEngineering Consultant STUDIES, TOPOGRAPHY, SOIL MECHANIC, DESIGN & SUPERVISIJl. AP. Pranoto RT. IV No. 23FTELP:(0541)663344 eMail : [email protected] KALIMANTAN TIMUR