...TAMPAK ATAS SEPTICTANK DAN PERESAPAN SKALA 1 : 20 POTONGAN A-A SKALA 1 : 20 Septictank A A 80 60...
Transcript of ...TAMPAK ATAS SEPTICTANK DAN PERESAPAN SKALA 1 : 20 POTONGAN A-A SKALA 1 : 20 Septictank A A 80 60...
150150
120120
150150
100
100
INSTA
LASI A
IRS
KA
LA
1 : 40
300
300
P1
P1
DEN
AH SEPTICTAN
K DAN1 : 100
14
PEKERJAAN :
CHILD FRIEN
DLY SPACE CUM NUTR
ITIONCEN
TRE (CFS) - Type H
ILL (2018)
DIRENCANAKAN / DIGAMBAR :
MENGETAHUI :
DIPERIKSA :
Lokasi:
Kecam
atan
Kabupaten/kota
Provinsi
: Sulaw
esi Tengah
: Palu
:
Koordinator Shelter dan Infrastruktur
Manajer Shelter dan Infrastruktur
KONTRAKTOR :
Engineer A
ssistant
STR
GAMBAR :
SKALA :
JML. LEM
BARNO. LEM
BARKODE GAM
BAR
19
Septictank
JUMLAH
KETERANGANSIMBOL
M 2 BhKLOSET JONGKOK
SEPTICTANK1 Bh
TABEL KOMPONEN INSTALASI LISTRIK
M 2 BhKERAN AIR
PIPAN AIR BERSIH 3/4"
PIPAN AIR KOTOR 3"
Peresapan
DETAIL1 : 20
14
PEKERJAAN :
CHILD FRIEN
DLY SPACE CUM NUTR
ITIONCEN
TRE (CFS) - Type H
ILL (2018)
DIRENCANAKAN / DIGAMBAR :
MENGETAHUI :
DIPERIKSA :
Lokasi:
Kecam
atan
Kabupaten/kota
Provinsi
: Sulaw
esi Tengah
: Palu
:
Koordinator Shelter dan Infrastruktur
Manajer Shelter dan Infrastruktur
KONTRAKTOR :
Engineer A
ssistant
STR
GAMBAR :
SKALA :
JML. LEM
BARNO. LEM
BARKODE GAM
BAR
19
TAM
PAK
ATA
S SEPTICTA
NK
DA
N PER
ESAPA
NS
KA
LA
1 : 20POTO
NG
AN
A-A
SK
AL
A 1 : 20
SeptictankA
A
80 6080 60
1060
10
8
150
Lantai cor 10 cm
Tanah Asli
Pipa PVC Ø3"
Beton Bertulang
Pipa Vent
Buis Beton Ø80
PERESAPAN
1060
10
10
80
100
Pasir Urug
Beton Bertulang
Kerikil 1/2Batu karang 150
Kemiringan -1%
10 10
Control Hole (20x20)Control Hole (20x20)Buis Beton Ø80
505050
5050140
10
Pipa PVC Ø3"
Tanah Asli