Post on 24-Jan-2017
LAPORAN PROYEK AKHIR
PROSES PRODUKSI PADA MESIN HYBRID POWDER
SPRAY CNC 2 AXIS
Disusun guna memenuhi sebagian syarat
Untuk menyelesaikan studi dan mendapatkan gelar
Ahli Madya Teknik Mesin
Oleh:
EGA ZULISTYAWAN
NIM I8113011
PROGRAM STUDI DIPLOMA III TEKNIK MESIN
FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA
2016
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
ii
RANCANG BANGUN MESIN PENCETAK BAKSO
PADA SISTEM TRANSMISI
Disusun oleh:
Danang Ariyanto
NIM. I8113007
Pembimbing I Pembimbing II
D.Dananrdono D.P.T. S.T.,M.T.,PhD Indri Yaningsih, S.T., M.T.
NIP. 196905141999031001 NIP. 198607042012122004
Telah dipertahankan di hadapan Dosen Penguji pada hari Selasa 19 Juli 2016
1. Dr. Triyono, S.T.,MT. .....................................................
NIP. 197406251999031002
2. Raymundus Lulus Lambang G.H S.T.,M.T. ........................................................
NIP. 197207052000121001
3. Sukmaji Indro Cahyono. ST.,M.Eng. ....................................................
NIP. 198308182014041001
Ketua Program Studi Koordinator Proyek Akhir
Diploma III Teknik Mesin
Fakultas Teknik Universitas Sebelas Maret
Dr. Budi Santoso S.T., M.T. Indri Yaningsih, S.T., M.T.
NIP. 197011052000031001 NIP. 198607042012122004
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
iii
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
iv
KATA PENGANTAR
Puji syukur penulis panjatkan bagi Allah SWT karena atas berkat rahmat dan
karunia-Nya penulis dapat melaksanakan dan menyelesaikan proyek akhir ini
dengan baik dan lancar. Proyek akhir merupakan salah satu mata kuliah wajib
yang harus ditempuh oleh mahasiswa Program Studi Diploma Tiga Teknik Mesin
Produksi, Jurusan Teknik Mesin, Fakultas Teknik Universitas Sebelas Maret
Surakarta sebagai syarat kelulusan dalam menempuh perkuliahan dewasa ini.
Pelaksanaan proyek akhir kemudian dilaporkan dalam bentuk laporan sebagai
pertanggungjawaban kepada pihak Program Studi.
Melalui proyek akhir ini, penulis dapat menyalurkan banyak ilmu yang
diperoleh di bangku kuliah kemudian diterapkan kedalam sebuah mesin dari
proyek akhir ini.
Proses pelaksanaan proyek akhir maupun penulisan laporan tentunya tidak
lepas dari bantuan berbagai pihak, oleh karena itu penulis menyampaikan terima
kasih atas dukungan dan bimbingan kepada:
1. Dr. Budi Santoso, S.T., M.T. selaku ketua jurusan Diploma III Teknik
Mesin Fakultas Teknik Universitas Sebelas Maret Surakarta.
2. Ibu Indri Yaningsih, S.T., M.T. selaku Koordinator Tugas Akhir Jurusan
Diploma III Teknik Mesin Fakultas Teknik Universitas Sebelas Maret
Surakarta, sekaligus pembimbing II dari penulis.
3. Bapak Dr. Miftahul Anwar, S.Si, M.Eng selaku pembimbing I dari
penulis.
4. Semua Dosen Teknik Mesin Fakultas Teknik Universitas Sebelas Maret
Surakarta.
5. Bapak, Ibu, dan semua keluarga yang senantiasa memberikan do’a,
dukungan dan motivasi untuk bersemangat dalam menyelasaikan setiap
tugas perkuliahan.
6. Teman-teman satu tim yang bersama-sama membuat proyek akhir ini
hingga selesai.
7. Mas Hendri dan Mas Arifin yang telah memberikan bimbingan dan
bantuannya.
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
v
8. Rekan mahasiswa Diploma III Teknik Mesin angkatan 2013, serta semua
pihak yang telah membantu hingga terselesaikannya proyek akhir dan
penyusunan laporan ini.
Penulis menyadari tidak ada yang sempurna dimuka bumi ini. Oleh karena itu,
penulis memohon maaf apabila dalam pelaksanaan serta laporan proyek akhir ini
masih terdapat kesalahan dan kekurangan, serta penulis meminta kritik dan saran
yang membangun untuk kesempurnaan laporan proyek akhir ini. Akhir kata,
semoga proyek akhir dan laporan yang telah terselesaikan bermanfaat bagi semua
pihak dan dapat dipergunakan sebagaimana mestinya.
Surakarta, 13 Juli 2016
Penulis
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
vi
PROSES PRODUKSI PADA MESIN HYBRID POWDER
SPRAY CNC 2 AXIS
Oleh: Ega Zulistyawan
ABSTRAK
Mesin Hybrid Powder Spray adalah mesin yang menggunakan program CNC
(Computer Numerik Control) dalam sistem kerjanya. CNC adalah mesin yang
dikontrol dengan komputer menggunakan kode huruf dan angka. Program CNC
pada mesin ini diprogram dengan menggunakan Software Artsoft Mach3. Mesin
CNC ini dibuat dengan sistem 2 axis yang mampu bergerak pada sumbu x dan
sumbu y.
Proses produksi merupakan kegiatan untuk menciptakan atau menambah
kegunaan suatu barang menjadi lebih bermanfaat. Konsep perencanaan membahas
tentang pemesinan, pengelasan, perakitan, finishing dan perhitungan biaya
produksi. Hasil perencanaan proses produksi didapatkan bagaimana proses
pembuatan Mesin hybrid powder Spray CNC 2 Axis dengan biaya produksi yang
lebih murah yaitu Rp18.864.000,00 dengan waktu pengerjaan 2.095 menit,
sehingga tidak memakan biaya yang terlalu mahal.
Kata Kunci: CNC, Hybrid Powder Spray, Proses Produksi.
PRODUCTION PROCESS OF HYBRID POWDER
MACHINE SPRAY CNC 2 AXIS
ABSTRACT
Hybrid Powder Spray Machine is a machine that uses a program CNC
(Computer Numerical Control) system. CNC is a machine controlled by a
computer using a code of letters and numbers . CNC program on this machine is
programmed using Artsoft Mach3Software . CNC machine is made with two axis
system that is capable of moving on x-axis and y-axis .
The production process is an activity to create or add the usability of a
product more useful. The planning concept are about the machining, welding,
assembling, finishing and production cost calculation. Results obtained
production process planning on creating the hybrid powder Spray Machine CNC
2 Axis with cheaper production costs are Rp18.864.000,00 and construction time
2,095 minutes, so it does not cost too expensive.
Keywords: CNC, Hybrid Powder Spray, Production Process.
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
vii
DAFTAR ISI
HALAMAN JUDUL .......................................................................................... i
LEMBAR PENGESAHAN ............................................................................... ii
LEMBAR BERITA ACARA LAPORAN .......................................................... iii
KATA PENGANTAR ....................................................................................... iv
ABSTRAK ......................................................................................................... vi
DAFTAR ISI ....................................................................................................... vii
DAFTAR GAMBAR .......................................................................................... ix
DAFTAR PERSAMAAN ................................................................................... xi
DAFTAR TABEL ............................................................................................. xii
DAFTAR LAMPIRAN ...................................................................................... xiii
DAFTAR NOTASI ............................................................................................. xiv
BAB I PENDAHULUAN
1.1 Latar Belakang ........................................................................................ 1
1.2 Rumusan Masalah ................................................................................... 2
1.3 Batasan Masalah ...................................................................................... 2
1.4 TujuanTugas Akhir ................................................................................. 2
1.5 Manfaat Tugas Akhir . ............................................................................ 3
1.6 Sistematika Penulisan ........................................................... .................. 3
BAB II DASAR TEORI
2.1. Pengertian Proses Produksi .................................................................... 4
2.2. Sistem Perencanaan Proses Produksi ..................................................... 4
2.3. Pemesinan (Machining) ......................................................................... 5
2.3.1. Mesin Bubut ................................................................................... 5
2.3.2. Bagian Utama Mesin Bubut ........................................................... 6
2.3.3. Prinsip Kerja Mesin Bubut ............................................................ 8
2.3.4. Jenis Pengerjaan Pada mesin Bubut ............................................... 8
2.3.5. Proses Yang Dihasilkan Mesin Bubut ........................................... 10
2.3.6. Mesin Gerinda Potong ................................................................... 12
2.3.7. Bagian-bagian Mesin Gerinda Potong ........................................... 13
2.3.8. Mesin Gerinda Tangan ................................................................... 13
2.3.9. Mesin Bor ...................................................................................... 14
2.3.10. Bagian-Bagian Utama Mesin Bor ............................................... 14
2.3.11. Jenis-Jenis Mesin Bor .................................................................. 16
2.3.12. Pengerjaan Pengeboran ............................................................... 17
2.3.13. Kecepatan Pengeboran ................................................................ 18
2.3.14. Pengelasan (Welding) .................................................................. 18
2.3.15. Macam-Macam Cara Pengelasan ................................................ 19
2.3.16. Pemilihan Besar Arus Listrik ...................................................... 21
2.3.17. Kekuatan Las ............................................................................... 22
2.4. Proses Perakitan (Assembling) ............................................................... 22
2.5. Proses Finishing ..................................................................................... 23
2.6. Analisa Biaya ......................................................................................... 23
2.3.1. Penetapan Harga Pada Perusahaan Kecil....................................... 24
2.3.2. Penetapan Harga Pada Perusahaan Besar..................................... 24
BAB III PERANCANGAN DAN GAMBAR
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
viii
3.1. Flow Chart Pembuatan Hybrid Powder Spray CNC 2 Axis Dengan
Pengendali Software Artsoft Mach3 ...................................................... 26
3.2. Prinsip Kerja Produk ............................................................................. 28
3.3. Bagian-Bagian Utama Mesin Hybrid Powder Spray CNC 2 Axis ........ 28
3.4. Perencanaan Permesinan ....................................................................... 32
3.5. Perhitungan Biaya Pembuatan Mesin .................................................... 37
3.5.1. Harga Raw Material................................................................... 37
3.5.2. Perhitungan Biaya Machining Process...................................... 38
3.6. Penetapan Harga Jual Mesin Hybrid Powder Spray CNC 2 Axis ........ 38
BAB IV PROSES PEMBUATAN DAN PENGUJIAN
4.1. Proses Produksi ..................................................................................... 39
4.2. Alat Dan Bahan ..................................................................................... 39
4.3. Proses Pengerjaan ................................................................................. 40
4.3.1. Pembuatan Rangka Utama/Sumbu Y........................................ 40
4.3.2. Pembuatan Rangka Sumbu X.................................................... 42
4.3.3. Dudukan Kaki Rangka Utama.................................................. 43
4.3.4. Pembuatan Transmisi Sumbu Y................................................ 43
4.3.5. Pembuatan Transmisi Sumbu X................................................ 45
4.3.6. Pembuatan Dudukan Motor Stepper sumbu X dan Y............... 45
4.4. Proses Pengecatan ................................................................................. 48
4.5. Proses Perakitan .................................................................................... 50
4.6. Perhitungan Total Waktu Pembuatan Mesin ........................................ 55
4.7. Hasil Pengujian ..................................................................................... 56
BAB V PENUTUP
5.1 Kesimpulan ............................................................................................. 57
5.2 Saran ...................................................................................................... 57
DAFTAR PUSTAKA ......................................................................................... 58
LAMPIRAN ........................................................................................................ 59
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
ix
DAFTAR GAMBAR
Gambar 2.1 Mesin Bubut .................................................................................. 5
Gambar 2.2 Bagian Utama Mesin Bubut .......................................................... 6
Gambar 2.3 Prinsip Kerja Mesin Bubut ............................................................ 8
Gambar 2.4 Bentuk Pengerjaan Mesin Bubut .................................................. 10
Gambar 2.5 Parameter Pahat Bubut .................................................................. 10
Gambar 2.6 Mesin Gerinda Potong ................................................................... 12
Gambar 2.7 Bagian-Bagian Mesin Gerinda Potong .......................................... 13
Gambar 2.8 Bagian-Bagian Mesin Gerinda Potong .......................................... 13
Gambar 2.9 Gerinda Tangan ............................................................................. 14
Gambar 2.10 Mesin Bor Tegak (Vertical Drilling Machine) ............................. 16
Gambar 2.11 Mesin Las ...................................................................................... 20
Gambar 2.12 Jenis Sambungan Las .................................................................... 20
Gambar 2.13 Bentuk Alur Kampuh Las ............................................................. 20
Gambar 3.1 Flow Chart Pembuatan Mesin Hybrid Powder Spray CNC
2 Axis Dengan Pengendali Software Artsoft Mach 3 ................... 27
Gambar 3.2 Prinsip Kerja Mesin ....................................................................... 28
Gambar 3.3 Rangka Sumbu Y .......................................................................... 29
Gambar 3.4 Rangka Sumbu X .......................................................................... 30
Gambar 3.5 Gun Spray Coating ........................................................................ 30
Gambar 3.6 Motor Stepper Nema 23 dan Nema34 ........................................... 31
Gambar 3.7 Ball Screw ..................................................................................... 31
Gambar 3.8 Houshing Bearing ......................................................................... 31
Gambar 3.9 Bearing Roll .................................................................................. 32
Gambar 3.10 Limit Switch ................................................................................... 32
Gambar 3.11 Posisi pengelasan pada dudukan kaki rangka utama ..................... 32
Gambar 4.1 Membuat Rangka Bertingkat ........................................................ 40
Gambar 4.2 Membuat Rangka Siku .................................................................. 41
Gambar 4.3 Membuat Rangka Kaki.................................................................. 41
Gambar 4.4 Membuat Rangka Utama ............................................................... 41
Gambar 4.5 Membuat Meja Rangka ................................................................. 42
Gambar 4.6 Membuat Rangka Sumbu X .......................................................... 42
Gambar 4.7 Merangkai Rangka Sumbu X ........................................................ 43
Gambar 4.8 Dudukan Kaki Rangka Utama....................................................... 43
Gambar 4.9 Membuat Alur Transmisi Sumbu Y .............................................. 44
Gambar 4.10 Bearing Roll Sumbu Y Bagian Depan .......................................... 44
Gambar 4.11 Bearing Roll Sumbu Y Bagian Belakang ...................................... 45
Gambar 4.12 Bearing Roll Sumbu X .................................................................. 45
Gambar 4.13 Dudukan Motor Sumbu X ............................................................. 46
Gambar 4.14 Dudukan Motor Sumbu Y ............................................................. 47
Gambar 4.15 Mendempul Rangka ...................................................................... 48
Gambar 4.16 Mengamplas Rangka ..................................................................... 48
Gambar 4.17 Mengecat Poxy .............................................................................. 49
Gambar 4.18 Mengecat Warna ........................................................................... 49
Gambar 4.19 Memasang Dudukan Kaki Rangka ................................................ 51
Gambar 4.20 Memasang Roll Bearing ................................................................ 51
Gambar 4.21 Memasang Motor Stepper ............................................................. 51
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
x
Gambar 4.22 Memasang Rubber Coupling ......................................................... 52
Gambar 4.23 Memasang Pembawa sumbu X ..................................................... 52
Gambar 4.24 Memasang Ballscrew dan Houshing Bearing ............................... 52
Gambar 4.25 Memasang Transmisi Sumbu X .................................................... 53
Gambar 4.26 Memasang Motor Stepper sumbu Y.............................................. 53
Gambar 4.27 Memasang Rubber Coupling ......................................................... 53
Gambar 4.28 Memasang Ballscrew dan Houshing Bearing ............................... 54
Gambar 4.29 Memasang Transmisi Sumbu Y .................................................... 54
Gambar 4.30 Memasang Limit Switch ................................................................ 54
Gambar 4.31 Memasang Toogle Clamp ............................................................. 55
Gambar 4.32 Memasang Dudukan Gun Spray Coating ..................................... 55
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xi
DAFTAR PERSAMAAN
Persamaan 2.1 Kecepatan Potong Mesin Bubut ............................................... 11
Persamaan 2.2 Kecepatan Putaran Benda Kerja .............................................. 11
Persamaan 2.3 Dept Of Cut ............................................................................... 11
Persamaan 2.4 Jumlah Langkah Pembubutan Memanjang ............................... 11
Persamaan 2.5 Jumlah Langkah Pembubutan Permukaan................................ 11
Persamaan 2.6 Waktu Pembubutan Memanjang .............................................. 12
Persamaan 2.7 Waktu Pembubutan Permukaan ................................................ 12
Persamaan 2.8 Waktu Proses Pengeboran ........................................................ 18
Persamaan 2.9 Total Waktu Proses Pengeboran ............................................... 18
Persamaan 2.10 Tegangan Geser ........................................................................ 22
Persamaan 2.11 Tegangan Bending .................................................................... 22
Persamaan 2.12 Tegangan Bending .................................................................... 22
Persamaan 2.13 Tegangan Bending .................................................................... 22
Persamaan 2.14 Tegangan Geser Maksimum ..................................................... 22
Persamaan 2.15 Harga Pokok Produksi .............................................................. 23
Persamaan 2.16 Harga Jual ................................................................................. 23
Persamaan 2.17 Laba .......................................................................................... 23
Persamaan 2.18 Penetapan Harga Perusahaan Kecil .......................................... 24
Persamaan 2.19 Penetapan Harga Biaya Plus ..................................................... 24
Persamaan 2.20 Penetapan Harga Mark Up ........................................................ 25
Persamaan 2.21 Penetapan Harga BEP (Break Event Point) .............................. 25
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xii
DAFTAR TABEL
Tabel 2.1 Kecepatan Potong dan Pemakanan Pengeboran ................................ 18
Tabel 2.2 Besar Arus dalam Ampere dan Diameter ............................................ 21
Tabel 3.1 Perhitungan Waktu Proses Pembubutan ............................................. 36
Tabel 3.2 Harga Raw Material ............................................................................ 37
Tabel 3.3 Machining Process .............................................................................. 38
Tabel 4.1 Perhitungan Waktu Pembubutan Dudukan Motor Sumbu X dan Y ... 48
Tabel 4.2 Perhitungan Waktu Proses Pengecatan ............................................... 49
Table 4.3 Waktu Pemesinan ................................................................................ 55
Tabel 4.4 Perhitungan Waktu Pembuatan Alat ................................................... 56
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xiii
DAFTAR LAMPIRAN
Lampiran 1. Tabel Kecepatan Pemakanan Pada Mesin Bubut .......................... 60
Lampiran 2. Tabel Kecepatan Pemakanan Pada Mesin Bor .............................. 61
Lampiran 3. Gambar Mesin Hybrid Powder spray ........................................... 62
Lampiran 4. Gambar Besi Hollow Sisi Belakang .............................................. 63
Lampiran 5. Gambar Besi Hollow Sliding Belakang......................................... 64
Lampiran 6. Gambar Besi Hollow Sliding Depan ............................................. 65
Lampiran 7. Gambar Besi Hollow Penyangga ................................................... 66
Lampiran 8. Gambar Besi Hollow Penghubung ................................................ 67
Lampiran 9. Gambar Besi Hollow Penyangga ................................................... 68
Lampiran 10. Gambar Besi Hollow Sisi Depan .................................................. 69
Lampiran 11. Gambar Besi L Sliding ................................................................. 70
Lampiran 12. Gambar Besi Hollow Sliding ........................................................ 71
Lampiran 13. Gambar Plat Dudukan Motor ....................................................... 72
Lampiran 14. Gambar Besi L Dudukan Sliding.................................................. 73
Lampiran 15. Gambar Besi Profil U ................................................................... 74
Lampiran 16. Gambar Besi Profil U ................................................................... 75
Lampiran 17. Gambar Besi Profil U ................................................................... 76
Lampiran 18. Gambar Besi Profil U ................................................................... 77
Lampiran 19. Gambar Dudukan Kaki Mesin ...................................................... 78
Lampiran 20. Gambar Besi Plat .......................................................................... 79
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xiv
DAFTAR NOTASI
A : Luasan minimum las ( )
d : Diameter pemakanan (mm)
D : Diameter awal benda kerja (m)
: Diameter setelah pemakanan (mm)
: Diameter awal (mm)
F : Gaya (N)
i : Jumlah langkah pemakanan
L : Panjang benda kerja (mm)
l : Panjang akhir benda kerja (mm)
: Panjang pengeboran atau tebal bahan (mm)
M : Momen (N.mm)
n : Kecepatan putar (rpm)
r : Jari jari (mm)
S : Kecepatan pemakanan (mm/rev)
t : Tebal pemakanan (mm)
: Waktu permesinan (menit)
V : Kecepatan potong (m/min)
: Kecepatan pemakanan (mm/rev)
Z : Section modulus ( )
τ : Tegangan geser (N/ )
: Tegangan bending (N/ )
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user