Post on 15-Dec-2015
Meter
N
Interval Kontur : 1 Meter
Keterangan:
0 50252550 12,5
Toe
Crest
Garis PenampangA
A'
Garis Kontur
Jalan Angkut
Batas Catchment Area
Sump
Produksi OverburdenBatubara TereksposVolume SumpLuas Catchment Area
: 1.813.121 BCM: 145.825 MT: 22.568 m3: 2,01 km2
Daerah Pengupasan Overburden
Stock Soil
Disposal Area
Batubara Terekspos
PROGRAM STUDI TEKNIK PERTAMBANGANFAKULTAS TEKNIK
UNIVERSITAS HASANUDDIN
MAKASSAR2015
SKRIPSI
RANCANGAN SEQUENCE TAMBANG BATUBARAUNTUK PRODUKSI JANGKA PENDEK TAHUN
2015 PT. TANITO HARUM
DESAIN SEQUENCE TAMBANG TRIWULAN ITAHUN 2015
LAMPIRANF
HALAMAN107
DIGAMBAR
PEMBIMBING
Bryan Kevin Toding MNIM. D621 11 258
Dr. Eng. Ir. Muhammad Ramli, MT.NIP. 196807181993091001
9955
700
9955
400
9955
100
9954
800
9954
500
487600 487900 488200 488500 488800 489100