AnalisaDAFTAR ANALISA PEKERJAANTAHUN 2014

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456IPEKERJAAN PERSIAPAN (SNI 03-2835-2002)11 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER1.2500btgBambu Sedang10,000.0012,500.002.5000kgSemen Portland1,340.003,350.001.2000lbrSeng gelombang 3" - 5"82,500.0099,000.000.0050m3Pasir Beton131,000.00655.000.0090m3Koral beton152,000.001,368.000.0720m3Kayu Meranti Usuk 5/75,500,000.00396,000.000.0600kgPaku biasa 2" - 5"15,400.00924.000.4500kgMeni Besi16,000.007,200.000.2000ohTukang Kayu82,000.0016,400.000.4000ohPekerja50,000.0020,000.000.0200ohKepala Tukang88,000.001,760.000.0200ohMandor95,000.001,900.00Total :40,060.00520,997.00561,057.00

21 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK0.0120m3Kayu Usuk Meranti 5/75,500,000.0066,000.000.0200kgPaku Biasa 2" - 5"15,400.00308.000.0070m3Kayu Papan Meranti 3/206,050,000.0042,350.000.1000ohTukang Kayu82,000.008,200.000.1000ohPekerja50,000.005,000.000.0100ohKepala Tukang88,000.00880.000.0050ohMandor95,000.00475.00Total :14,555.00108,658.00123,213.00

31 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN1.2500btgDolken Kayu 8 - 10/4m99,000.00123,750.000.1800m3Kayu Meranti2,585,000.00465,300.000.8500kgPaku Biasa 2" - 5"15,400.0013,090.001.1000kgBesi Strip8,800.009,680.0035.0000kgSemen Portland1,340.0046,900.000.1500m3Pasir Pasang152,000.0022,800.000.1000m3Pasir Beton131,000.0013,100.000.1500m3Koral Beton152,000.0022,800.0030.0000bhBata Merah3,300.0099,000.000.2500lbrSeng Plat55,000.0013,750.002.0000bhJendela Nako32,000.0064,000.000.0800m2Kaca Polos121,000.009,680.000.1500bhKunci Tanam24,200.003,630.000.0600lbrPlywood 4 mm71,500.004,290.002.0000ohTukang Kayu82,000.00164,000.001.0000ohTukang Batu76,000.0076,000.002.0000ohPekerja50,000.00100,000.000.3000ohKepala Tukang88,000.0026,400.000.0500ohMandor95,000.004,750.00Total :371,150.00911,770.001,282,920.00

41 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT1.7000btgBambu Sedang10,000.0017,000.000.2100m3Kayu Meranti2,585,000.00542,850.000.3000kgPaku Biasa 2" - 5"15,400.004,620.0010.5000kgSemen Portland1,340.0014,070.000.0300m3Pasir Beton131,000.003,930.000.0500m3Koral Beton152,000.007,600.001.5000lbrSeng gelombang BJLS 3099,000.00148,500.002.0000ohTukang Kayu82,000.00164,000.001.0000ohPekerja50,000.0050,000.000.2000ohKepala Tukang88,000.0017,600.000.0500ohMandor95,000.004,750.00Total :236,350.00738,570.00974,920.00

51 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU3.0000btgBambu Sedang10,000.0030,000.000.2760m3Kayu Meranti 2,585,000.00713,460.000.7000kgPaku biasa 2" - 5"15,400.0010,780.001.5000lbrSeng gelombang BJLS 2899,000.00148,500.001.5000ohTukang Kayu82,000.00123,000.001.0000ohPekerja50,000.0050,000.000.1500ohKepala Tukang88,000.0013,200.000.0500ohMandor95,000.004,750.00Total :190,950.00902,740.001,093,690.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

61 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN0.1000ohPekerja50,000.005,000.000.0500ohMandor95,000.004,750.00Total :9,750.009,750.00

71 M2 PEMBUATAN BEDENG BURUH1.2500btgBambu Sedang10,000.0012,500.000.1860m3Kayu Meranti2,585,000.00480,810.000.3000kgPaku Biasa 2" - 5"15,400.004,620.0018.0000kgSemen Portland1,340.0024,120.000.0300m3Pasir Beton131,000.003,930.000.0500m3Koral Beton152,000.007,600.001.5000lbrSeng gelombang BJLS 2899,000.00148,500.001.3500lbrPlywood 4 mm71,500.0096,525.002.0000ohTukang Kayu82,000.00164,000.001.0000ohPekerja50,000.0050,000.000.2000ohKepala Tukang88,000.0017,600.000.0500ohMandor95,000.004,750.00Total :236,350.00778,605.001,014,955.00

71 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM0.0360m3Kayu Terentang2,585,000.0093,060.000.0800kgPaku Biasa 2" - 5"15,400.001,232.001.0000btgKaso 5/784,700.0084,700.000.3000ohTukang kayu82,000.0024,600.000.0015ohMandor95,000.00142.50Total :24,742.50178,992.00203,734.50

81 M2 PEMBUATAN STEGGER DARI BAMBU1.0000btgBambu10,000.0010,000.000.2500kgTali Ijuk37,500.009,375.000.0170ohTukang Kayu82,000.001,394.000.0020ohPekerja50,000.00100.000.2500ohKepala Tukang88,000.0022,000.000.0130ohMandor95,000.001,235.0024,729.0019,375.0044,104.00

91 M2 PEMBUATAN JALAN SEMENTARA0.1500m3Batu Kali 180,000.0027,000.000.0900m3Batu Pecah 5 - 7182,500.0016,425.000.0100m3Pasir Pasang152,000.001,520.001.0000ohPekerja50,000.0050,000.000.0500ohMandor95,000.004,750.00Total :54,750.0044,945.0099,695.00

101 M3 BONGKARAN BETON BERTULANG6.6670ohPekerja50,000.00333,350.000.3330ohMandor95,000.0031,635.00Total :364,985.00364,985.00

121 M3 BONGKARAN DINDING TEMBOK BATA MERAH6.6670ohPekerja50,000.00333,350.000.0330ohMandor95,000.003,135.00Total :336,485.00336,485.00

1310 M3 MEMBONGKAR s.d.a DINDING TEMBOK YANG TIPIS TERHITUNG DENGAN MEMBERSIHKAN BATAS - BATASNYA2.0000ohPekerja50,000.00100,000.000.1000ohMandor95,000.009,500.00Total :109,500.00109,500.00

1410 M3 MEMBONGKAR LANTAI YANG LAMA BERIKUT PEKERJAAN MEMBERSIHKAN BATA-BATA ATAU LAIN - LAIN YANG DIBONGKAR1.0000ohPekerja50,000.0050,000.000.1000ohMandor95,000.009,500.00Total :59,500.0059,500.00

1510 M3 MENGUPAS PLESTERAN YANG LAMA0.5000ohPekerja50,000.0025,000.000.0250ohMandor95,000.002,375.00Total :27,375.0027,375.00

1610 M3 MENURUNKAN ATAP GENTENG ATAU SIRAP JIKA GENTENG ATAU SIRAP DIPAKAI LAGI0.2000ohPekerja50,000.0010,000.000.1000ohMandor95,000.009,500.00Total :19,500.0019,500.00IIPEKERJAAN TANAH (SNI 2835 : 2008)11 M3 GALIAN TANAH BIASA DALAM 1 METER0.7500ohPekerja50,000.0037,500.000.0250ohMandor95,000.002,375.00Total :39,875.0039,875.0021 M3 GALIAN TANAH BIASA DALAM 2 METER0.9000ohPekerja50,000.0045,000.000.0450ohMandor95,000.004,275.00Total :49,275.0049,275.00

31 M3 GALIAN TANAH BIASA DALAM 3 METER1.0500ohPekerja50,000.0052,500.000.0670ohMandor95,000.006,365.00Total :58,865.0058,865.0041 M3 GALIAN TANAH KERAS DALAM 1METER1.0000ohPekerja50,000.0050,000.000.0320ohMandor95,000.003,040.00Total :53,040.0053,040.00

51 M3 GALIAN TANAH CADAS DALAM 1 METER1.5000ohPekerja50,000.0075,000.000.0600ohMandor95,000.005,700.00Total :80,700.0080,700.0061 M3 GALIAN TANAH LUMPUR DALAM 1 METER1.2000ohPekerja50,000.0060,000.000.0450ohMandor95,000.004,275.00Total :64,275.0064,275.00

71 M2 PEKERJAAN STRIPPING SETINGGI 1 METER0.0500ohPekerja50,000.002,500.000.0050ohMandor95,000.00475.00Total :2,975.002,975.00

81 M3 PEMBUANGAN TANAH SEJAUH 15 METER0.3300ohPekerja50,000.0016,500.000.0100ohMandor95,000.00950.00Total :17,450.0017,450.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

1710 M3 MENURUNKAN ATAP SENG0.5000ohPekerja50,000.0025,000.000.1000ohMandor95,000.009,500.00Total :34,500.0034,500.00

1810 M3 MENURUNKAN RANGKA ATAP DARI KAYU JIKA KAYU BONGKARAN DIPAKAI0.2500ohTukang Kayu82,000.0020,500.000.0250ohKepala Tukang Kayu88,000.002,200.000.0500ohPekerja50,000.002,500.00Total :25,200.0025,200.00

1910 M3 MEMBONGKAR LANTAI 2 DARI KAYU, DINDING LUAR, LANTAI JEMBATAN (LAPISAN ATAU DARI BAWAH DIHITUNG TERPISAH)0.6000ohTukang Kayu82,000.0049,200.000.0600ohKepala Tukang Kayu88,000.005,280.002.0000ohPekerja50,000.00100,000.000.1000ohMandor95,000.009,500.00Total :109,500.00109,500.00

2010 M3 MEMBONGKAR KAYU DARI BALOK LANTAI 2, KUDA - KUDA GELEGAR JEMBATAN DAN SEBAGAINYA (KAYU DIPAKAI LAGI)6.0000ohTukang Kayu82,000.00492,000.000.6000ohKepala Tukang Kayu88,000.0052,800.004.0000ohPekerja50,000.00200,000.000.2000ohMandor95,000.0019,000.00Total :219,000.00219,000.00

211 M2 PEKERJAAN MENANAM RUMPUT1.0000m2Tanaman Rumput19,800.0019,800.000.0500ohPekerja50,000.002,500.000.0050ohMandor95,000.00475.00Total :2,975.002,975.00

221 M3 PENGANGKUTAN BAHAN KE LOKASI SEJAUH RATA - RATA 200M'1.0000ohPekerja50,000.0050,000.00Total :50,000.0050,000.00

91 M3 URUGAN KEMBALI0.1920ohPekerja50,000.009,600.000.01900hMandor95,000.001,805.00Total :11,405.0011,405.00

101 M3 PEMADATAN TANAH ( Per 20 Cm )0.5000ohPekerja50,000.0025,000.000.0500ohMandor95,000.004,750.00Total :29,750.0029,750.00

111 M3 URUGAN PASIR 1.2000m3Pasir Urug135,000.00162,000.000.3000ohPekerja50,000.0015,000.000.0100ohMandor95,000.00950.00Total :15,950.00162,000.00177,950.00

121 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM6.0000m3Ijuk7,700.0046,200.000.1500ohPekerja50,000.007,500.000.0150ohMandor95,000.001,425.00Total :8,925.0046,200.0055,125.00

131 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan1.2000m3Sirtu100,800.00120,960.000.2500ohPekerja50,000.0012,500.000.0250ohMandor95,000.002,375.00Total :14,875.00120,960.00135,835.00

141 M3 URUGAN TANAH PILIHAN DIPADATKAN1.2000m3Tanah Urug115,500.00138,600.000.5000ohPekerja50,000.0025,000.000.0500ohMandor95,000.004,750.00Total :29,750.00138,600.00168,350.00151 M3 URUGAN LIMESTONE PADAT1.2000m3Limestone126,500.00151,800.000.2500ohPekerja50,000.0012,500.000.0250ohMandor95,000.002,375.00Total :14,875.00151,800.00166,675.00

IIIPEKERJAAN PONDASI (SNI 2836 : 2008)11 M3 BATU BELAH CAMP. 1 PC : 3 PS1.2000m3Batu Belah 15 cm / 20 cm181,500.00217,800.00202.0000kgSemen Portland1,375.00277,750.000.4850m3Pasir Pasang152,000.0073,720.001.5000ohPekerja50,000.0075,000.000.7500ohTukang Batu 76,000.0057,000.000.0750ohKepala Tukang88,000.006,600.000.0750ohMandor95,000.007,125.00Total :145,725.00569,270.00714,995.0021 M3 BATU BELAH CAMP. 1 PC : 4 PS1.2000m3Batu Belah 15 cm / 20 cm181,500.00217,800.00163.0000kgSemen Portland1,375.00224,125.000.5200m3Pasir Pasang152,000.0079,040.001.5000ohPekerja50,000.0075,000.000.7500ohTukang Batu 76,000.0057,000.000.0750ohKepala Tukang88,000.006,600.000.0750ohMandor95,000.007,125.00Total :145,725.00520,965.00666,690.00

21 M3 BATU BELAH CAMP. 1 PC : 5 PS1.2000m3Batu Belah 15 cm / 20 cm181,500.00217,800.00136.0000kgSemen Portland1,375.00187,000.000.5440m3Pasir Pasang152,000.0082,688.001.5000ohPekerja50,000.0075,000.000.7500ohTukang Batu 76,000.0057,000.000.0750ohKepala Tukang88,000.006,600.000.0750ohMandor95,000.007,125.00Total :145,725.00487,488.00633,213.0031 M3 BATU BELAH CAMP. 1 PC : 6 PS1.2000m3Batu Belah 15 cm / 20 cm181,500.00217,800.00117.0000kgSemen Portland1,375.00160,875.000.5610m3Pasir Pasang152,000.0085,272.001.5000ohPekerja50,000.0075,000.000.7500ohTukang Batu 76,000.0057,000.000.0750ohKepala Tukang88,000.006,600.000.0750ohMandor95,000.007,125.00Total :145,725.00463,947.00609,672.0041 M3 BATU BELAH CAMP. 1 PC : 8 PS1.2000m3Batu Belah 15 cm / 20 cm181,500.00217,800.0091.0000kgSemen Portland1,375.00125,125.000.5840m3Pasir Pasang152,000.0088,768.001.5000ohPekerja50,000.0075,000.000.7500ohTukang Batu 76,000.0057,000.000.0750ohKepala Tukang88,000.006,600.000.0750ohMandor95,000.007,125.00Total :145,725.00431,693.00577,418.0051 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI0.4800m3Batu Belah 15 cm / 20 cm181,500.0087,120.00194.0000kgSemen Portland1,375.00266,750.000.3120m3Pasir Beton131,000.0040,872.000.4680m3Koral Beton152,000.0071,136.00126.0000kgBesi Beton10,000.001,260,000.001.8000kgKawat Beton13,750.0024,750.003.4000ohPekerja50,000.00170,000.000.8500ohTukang Batu 76,000.0064,600.000.0850ohKepala Tukang88,000.007,480.000.1700ohMandor95,000.0016,150.00258,230.001,750,628.002,008,858.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

61 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M0.4500m3Batu Belah 15 cm / 20 cm181,500.0081,675.00194.0000kgSemen Portland1,375.00266,750.000.3120m3Pasir Beton131,000.0040,872.000.4680m3Koral Beton152,000.0071,136.002.4000ohPekerja50,000.00120,000.000.8000ohTukang Batu 76,000.0060,800.000.0800ohKepala Tukang88,000.007,040.000.1190ohMandor95,000.0011,305.00Total :199,145.00460,433.00659,578.00

71 M3 PASANGAN BATU KOSONG1.2000m3Batu Belah 15 cm / 20 cm181,500.00217,800.000.4320m3Pasir Urug135,000.0058,320.000.7800ohPekerja50,000.0039,000.000.3900ohTukang Batu 76,000.0029,640.000.0390ohKepala Tukang88,000.003,432.000.0390ohMandor95,000.003,705.00Total :75,777.00276,120.00351,897.00

SNI 03-3436-2002

81 M' PONDASI BORED PILE DIAMETER 30 CMA.Pengeboran O 13/m' Bored pile0.1550JamCrawler CraneERROR:#REF!ERROR:#REF!0.1550JamMesin Bor80,000.0012,400.000.1800ohTukang Gali76,000.0013,680.000.0090ohMandor 95,000.00855.001.0000LsOli + Solar46,750.0046,750.000.2200Alat Bantu40,000.008,800.00Total A :61,285.0021,200.0082,485.00B.Beton K-300, Bored Pile0.0707m3Beton K-300865,678.1861,203.450.4250ohTukang batu76,000.0032,300.000.0210ohMandor 181,500.003,811.501.0000LsPipa Tremi dan Casing pelindung100,000.00100,000.00Total B :36,111.50161,203.45197,314.95

C.Pembesian 6 O 13 Beugel O 8 Spiral7.2936KgBesi O 1310,000.0072,936.00141.5600KgBeugel Besi O810,000.0015,600.000.2827433388Total C :0.088,536.0088,536.000.3945840373Total A + B + C :97,396.50270,939.45368,335.951.5619241141IVPEKERJAAN DINDING (SNI 6897 : 2008)7.2936393143

11 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS140.0000bhBata Merah 5 x 11 x 22 cm3,300.00462,000.0043.5000kgSemen Portland1,375.0059,812.500.0800m3Pasir Pasang152,000.0012,160.000.6000ohPekerja50,000.0030,000.000.2000ohTukang Batu 76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0300ohMandor95,000.002,850.0049,810.00533,972.50583,782.50

21 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS140.0000bhBata Merah 5 x 11 x 22 cm3,300.00462,000.0032.9500kgSemen Portland1,375.0045,306.250.0910m3Pasir Pasang152,000.0013,832.000.6000ohPekerja50,000.0030,000.000.2000ohTukang Batu 76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0300ohMandor95,000.002,850.0049,810.00521,138.25570,948.25

11 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS70.0000bhBata Merah 5 x 11 x 22 cm2,200.00154,000.0018.9500kgSemen Portland1,375.0026,056.250.0380m3Pasir Pasang152,000.005,776.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.0024,905.00185,832.25210,737.2521 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS70.0000bhBata Merah 5 x 11 x 22 cm2,200.00154,000.0014.3700kgSemen Portland1,375.0019,758.750.0400m3Pasir Pasang152,000.006,080.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.00179,838.75204,743.7581 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS70.0000bhBata Merah 5 x 11 x 22 cm2,200.00154,000.0011.5000kgSemen Portland1,375.0015,812.500.0430m3Pasir Pasang152,000.006,536.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.00176,348.50201,253.5031 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS70.0000bhBata Merah 5 x 11 x 22 cm2,200.00154,000.009.6800kgSemen Portland1,375.0013,310.000.0450m3Pasir Pasang152,000.006,840.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.00174,150.00199,055.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

31 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS140.0000bhBata Merah 5 x 11 x 22 cm3,300.00462,000.0026.5500kgSemen Portland1,375.0036,506.250.0930m3Pasir Pasang152,000.0014,136.000.6000ohPekerja50,000.0030,000.000.2000ohTukang Batu 76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0300ohMandor95,000.002,850.0049,810.00512,642.25562,452.2541 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS140.0000bhBata Merah 5 x 11 x 22 cm3,300.00462,000.0022.2000kgSemen Portland1,375.0030,525.000.1020m3Pasir Pasang152,000.0015,504.000.6000ohPekerja50,000.0030,000.000.2000ohTukang Batu 76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0300ohMandor95,000.002,850.0049,810.00508,029.00557,839.0051 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS140.0000bhBata Merah 5 x 11 x 22 cm3,300.00462,000.0018.5000kgSemen Portland1,375.0025,437.500.1220m3Pasir Pasang152,000.0018,544.000.6000ohPekerja50,000.0030,000.000.2000ohTukang Batu 76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0300ohMandor95,000.002,850.0049,810.00505,981.50555,791.50

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

111 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS70.0000bhBata Merah 5 x 11 x 22 cm2,200.00154,000.006.5000kgSemen Portland1,375.008,937.500.0500m3Pasir Pasang152,000.007,600.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.00170,537.50195,442.50151 M2 PASANGAN DINDING BEDEG, RANGKA KAYU1.5000m2Bedeg/Bilik Bambu Kelas I385,000.00577,500.000.0140m3Kayu kamper usuk/reng6,600,000.0092,400.000.0120kgPaku Biasa15,400.00184.800.0030m3List Kayu 2/46,600,000.0019,800.000.1000ohPekerja50,000.005,000.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang88,000.00440.000.0020ohMandor95,000.00190.00Total :9,730.00689,884.80699,614.80

SNI 03-2836-2002161 M2 PASANGAN BATA GOSOK60.0000bhBata Gosok5,500.00330,000.0012.4400kgSemen Portland1,375.0017,105.002.0000ohTukang Paras Bali82,000.00164,000.000.4000ohKepala Tukang Paras Bali88,000.0035,200.002.0000ohPekerja / Pekerja Tak Terlatih50,000.00100,000.000.1000ohMandor95,000.009,500.00Total :144,700.00347,105.00491,805.00171 M2 PASANGAN PARAS SILAKARANG22.0000bhBata Paras Silakarang22,000.00484,000.0011.7500kgSemen Portland1,375.0016,156.252.0000ohTukang Paras Bali82,000.00164,000.000.4000ohKepala Tukang Paras Bali88,000.0035,200.002.0000ohPekerja / Pekerja Tak Terlatih50,000.00100,000.000.1000ohMandor95,000.009,500.00Total :308,700.00500,156.25808,856.25181 M2 PASANGAN PARAS KEROBOKAN22.0000bhBata Paras Kerobokan13,750.00302,500.0011.7500kgSemen Portland1,375.0016,156.252.0000ohTukang Paras Bali82,000.00164,000.000.4000ohKepala Tukang Paras Bali88,000.0035,200.002.0000ohPekerja / Pekerja Tak Terlatih50,000.00100,000.000.1000ohMandor95,000.009,500.00Total :308,700.00318,656.25627,356.25

41 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS70.0000bhBata Merah 5 x 11 x 22 cm2,200.00154,000.008.3200kgSemen Portland1,375.0011,440.000.0490m3Pasir Pasang152,000.007,448.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.00172,888.00197,793.0051 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 10), campuran spesi 1 pc : 3 ps12.5000bhBatako Lubang2,750.0034,375.0015.1600kgSemen Portland1,375.0020,845.000.3640m3Pasir Pasang152,000.0055,328.000.2800kgBesi Beton 8 mm10,000.002,800.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.00113,348.00138,253.00131 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10), campuran spesi 1 pc : 4 ps12.5000bhBatako2,750.0034,375.0012.1300kgSemen Portland1,375.0016,678.750.3880m3Pasir Pasang152,000.0058,976.000.2800kgBesi Beton 8 mm10,000.002,800.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.00112,829.75137,734.7561 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM camp 1 Pc : 3 Ps30.0000bhRoster Keramik38,500.001,155,000.0014.0000kgSemen Portland1,375.0019,250.000.0320m3Pasir Pasang152,000.004,864.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu 76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.001,179,114.001,204,019.00VPEKERJAAN PLESTERAN (SNI 2837 : 2008)

11 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM15.5040kgSemen Portland1,375.0021,318.000.0160m3Pasir Pasang152,000.002,432.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.0023,750.0052,895.0021 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM10.2240kgSemen Portland1,375.0014,058.000.0200m3Pasir Pasang152,000.003,040.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.0017,098.0046,243.0031 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM7.7760kgSemen Portland1,375.0010,692.000.0230m3Pasir Pasang152,000.003,496.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.0014,188.0043,333.0041 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM6.2400kgSemen Portland1,375.008,580.000.0240m3Pasir Pasang152,000.003,648.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.0012,228.0041,373.0041 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM5.1840kgSemen Portland1,375.007,128.000.0260m3Pasir Pasang152,000.003,952.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.0011,080.0040,225.0051 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM4.4160kgSemen Portland1,375.006,072.000.0270m3Pasir Pasang152,000.004,104.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.0010,176.0039,321.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

61 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM3.4560kgSemen Portland1,375.004,752.000.0290m3Pasir Pasang152,000.004,408.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.009,160.0038,305.0071 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM13.6320kgSemen Portland1,375.0018,744.000.0270m3Pasir Pasang152,000.004,104.000.4000ohPekerja50,000.0020,000.000.2000ohTukang Batu76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0220ohMandor95,000.002,090.00Total :39,050.0022,848.0061,898.0081 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM10.3680kgSemen Portland1,375.0014,256.000.0310m3Pasir Pasang152,000.004,712.000.2600ohPekerja50,000.0013,000.000.2000ohTukang Batu76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0130ohMandor95,000.001,235.00Total :31,195.0018,968.0050,163.00101 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM8.3200kgSemen Portland1,375.0011,440.000.0320m3Pasir Pasang152,000.004,864.000.4000ohPekerja50,000.0020,000.000.2000ohTukang Batu76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0220ohMandor95,000.002,090.00Total :39,050.0016,304.0055,354.0091 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM6.9120kgSemen Portland1,375.009,504.000.0350m3Pasir Pasang152,000.005,320.000.4000ohPekerja50,000.0020,000.000.2000ohTukang Batu76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0220ohMandor95,000.002,090.00Total :39,050.0014,824.0053,874.00101 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM5.8880kgSemen Portland1,375.008,096.000.0360m3Pasir Pasang152,000.005,472.000.4000ohPekerja50,000.0020,000.000.2000ohTukang Batu76,000.0015,200.000.0200ohKepala Tukang88,000.001,760.000.0220ohMandor95,000.002,090.00Total :39,050.0013,568.0052,618.00111 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM 0.5000kgSemen Portland1,375.00687.500.0130m3Pasir Pasang152,000.001,976.000.0800ohPekerja50,000.004,000.000.4000ohTukang Batu76,000.0030,400.000.0400ohKepala Tukang88,000.003,520.000.0040ohMandor95,000.00380.00Total :38,300.002,663.5040,963.50121 M2 PLESTERAN CIPRAT 1 PC : 2 PS4.3200kgSemen Portland1,375.005,940.000.0060m3Pasir Pasang152,000.00912.000.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.006,852.0031,757.00151 M2 PLESTERAN GRANIT 1 PC : 2 GRANIT, TEBAL 10 MM10.0000kgSemen Portland1,375.0013,750.0015.0000m3Batu Granit0.00.00.3000ohPekerja50,000.0015,000.000.1000ohTukang Batu76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,905.0013,750.0038,655.00161 M2 PLESTERAN TERASO 1 PC : 2 BATU TERASO, TEBAL 10 MM10.0000kgSemen Portland1,375.0013,750.0015.0000m3Batu Teraso0.00.00.4500ohPekerja50,000.0022,500.000.2250ohTukang Batu76,000.0017,100.000.0230ohKepala Tukang88,000.002,024.000.0230ohMandor95,000.002,185.00Total :43,809.0013,750.0057,559.00131 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M') 3.1080kgSemen Portland1,375.004,273.500.1500ohPekerja50,000.007,500.000.0750ohTukang Batu76,000.005,700.000.0080ohKepala Tukang88,000.00704.000.0080ohMandor95,000.00760.00Total :14,664.004,273.5018,937.50141 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M') 1.6000kgSemen Portland1,375.002,200.000.0700ohPekerja50,000.003,500.000.0350ohTukang Batu76,000.002,660.000.0040ohKepala Tukang88,000.00352.000.0040ohMandor95,000.00380.00Total :6,892.002,200.009,092.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

151 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS 6.3400kgSemen Portland1,375.008,717.500.0120m3Pasir Pasang152,000.001,824.000.3000ohPekerja50,000.0015,000.000.1500ohTukang Batu76,000.0011,400.000.0150ohKepala Tukang88,000.001,320.000.0150ohMandor95,000.001,425.00Total :29,145.0010,541.5039,686.50161 M2 PEKERJAAN ACIAN3.2500zakSemen Portland 50 Kg1,375.004,468.750.2000ohPekerja50,000.0010,000.000.1000ohTukang Labur/Cat76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0100ohMandor95,000.00950.00Total :9,430.004,468.7513,898.75

VIPEKERJAAN KAYU (SNI 3434 : 2008)1MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I1.1000m3Balok Kayu Kamper8,030,000.008,833,000.001.2500KgPaku 10 Cm27,500.0034,375.001.0000KgLem Kayu16,500.0016,500.007.0000ohPekerja50,000.00350,000.0021.0000ohTukang Kayu82,000.001,722,000.002.1000ohKepala Tukang88,000.00184,800.000.3500ohMandor95,000.0033,250.00Total :2,290,050.008,883,875.0011,173,925.002MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III1.2000m3Balok Kayu kruing5,280,000.006,336,000.001.2500KgPaku 10 Cm27,500.0034,375.001.0000KgLem Kayu16,500.0016,500.006.0000ohPekerja50,000.00300,000.0018.0000ohTukang Kayu82,000.001,476,000.001.8000ohKepala Tukang88,000.00158,400.000.3000ohMandor95,000.0028,500.00Total :1,962,900.006,386,875.008,349,775.003MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II0.0400m3Papan Kayu Kamper8,800,000.00352,000.000.0500KgPaku 5-7 Cm27,500.001,375.000.3500ohPekerja50,000.0017,500.001.0500ohTukang Kayu82,000.0086,100.000.1050ohKepala Tukang88,000.009,240.000.0180ohMandor95,000.001,710.00Total :114,550.00353,375.00467,925.004MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III0.0400m3Papan Kayu Kruing5,830,000.00233,200.000.0500KgPaku 5-7 Cm27,500.001,375.000.3500ohPekerja50,000.0017,500.001.0500ohTukang Kayu82,000.0086,100.000.1050ohKepala Tukang88,000.009,240.000.0180ohMandor95,000.001,710.00Total :114,550.00234,575.00349,125.00

5MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II0.0400m3Papan Kayu Kamper8,800,000.00352,000.000.5000KgLem Kayu16,500.008,250.001.0000ohPekerja50,000.0050,000.003.0000ohTukang Kayu82,000.00246,000.000.3000ohKepala Tukang88,000.0026,400.000.0500ohMandor95,000.004,750.00Total :327,150.00360,250.00687,400.006MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II0.0240m3Papan Kayu Kamper8,800,000.00211,200.000.3000KgLem Kayu16,500.004,950.000.8000ohPekerja50,000.0040,000.002.4000ohTukang Kayu82,000.00196,800.000.2400ohKepala Tukang88,000.0021,120.000.0400ohMandor95,000.003,800.00Total :261,720.00216,150.00477,870.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

7MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II0.0640m3Papan Kayu Kamper8,800,000.00563,200.000.5000KgLem Kayu16,500.008,250.001.0000ohPekerja50,000.0050,000.003.0000ohTukang Kayu82,000.00246,000.000.3000ohKepala Tukang88,000.0026,400.000.0500ohMandor95,000.004,750.00Total :327,150.00571,450.00898,600.008MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)0.0250m3Papan Kayu Kamper8,800,000.00220,000.000.0300KgPaku 1-2,5 Cm27,500.00825.000.5000KgLem Kayu16,500.008,250.001.0000LbrPlywood 4 mm 71,500.0071,500.000.7000ohPekerja50,000.0035,000.002.1000ohTukang Kayu82,000.00172,200.000.2100ohKepala Tukang88,000.0018,480.000.0350ohMandor95,000.003,325.00Total :229,005.00300,575.00529,580.009MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I/II 0.0256m3Papan Kayu Kamper8,800,000.00225,280.000.0300KgPaku 1-2,5 Cm27,500.00825.000.5000KgLem Kayu16,500.008,250.001.0000LbrPlywood 4 mm71,500.0071,500.000.8000ohPekerja50,000.0040,000.002.4000ohTukang Kayu82,000.00196,800.000.2400ohKepala Tukang88,000.0021,120.000.0400ohMandor95,000.003,800.00Total :261,720.00305,855.00567,575.00

10MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II 0.0600m3Papan Kayu Kamper8,800,000.00528,000.000.1500KgPaku 1-2,5 Cm27,500.004,125.000.6700ohPekerja50,000.0033,500.002.0000ohTukang Kayu82,000.00164,000.000.2000ohKepala Tukang88,000.0017,600.000.3350ohMandor95,000.0031,825.00Total :246,925.00532,125.00779,050.0011MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I0.0256m3Papan Kayu Kamper8,800,000.00225,280.000.0300KgPaku 1-2,5 Cm27,500.00825.000.3000KgLem Kayu16,500.004,950.001.0000LbrTeakwood 4 mm uk 90x220 cm77,000.0077,000.000.8000ohPekerja50,000.0040,000.002.4000ohTukang Kayu82,000.00196,800.000.2400ohKepala Tukang88,000.0021,120.000.0400ohMandor95,000.003,800.00Total :261,720.00308,055.00569,775.0012MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II0.0250m3Papan Kayu Kamper8,800,000.00220,000.000.0300KgPaku 1-2,5 Cm27,500.00825.000.8000KgLem Kayu16,500.0013,200.001.0000LbrTeakwood 4 mm uk 90x220 cm77,000.0077,000.000.5000LbrFormika77,000.0038,500.000.8500ohPekerja50,000.0042,500.002.5500ohTukang Kayu82,000.00209,100.000.2550ohKepala Tukang88,000.0022,440.000.0430ohMandor95,000.004,085.00Total :278,125.00349,525.00627,650.0013MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III Bentang 6 M' 1.1000m3Balok Kayu Kamper8,030,000.008,833,000.0015.0000KgBesi Strip Tebal 5 cm8,800.00132,000.005.6000KgPaku 12 Cm27,500.00154,000.004.0000ohPekerja50,000.00200,000.0012.0000ohTukang Kayu82,000.00984,000.001.2000ohKepala Tukang88,000.00105,600.000.2000ohMandor95,000.0019,000.00Total :1,308,600.009,119,000.0010,427,600.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

14MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I1.2000m3Balok Kayu Kamper8,030,000.009,636,000.0015.0000KgBesi Strip Tebal 5 cm8,800.00132,000.005.6000KgPaku 12 Cm27,500.00154,000.006.7000ohPekerja50,000.00335,000.0020.1000ohTukang Kayu82,000.001,648,200.002.0100ohKepala Tukang88,000.00176,880.000.3350ohMandor95,000.0031,825.00Total :2,191,905.009,922,000.0012,113,905.0015MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II1.1000m3Balok Kayu Kamper8,030,000.008,833,000.0015.0000KgBesi Strip Tebal 5 cm8,800.00132,000.003.0000KgPaku 12 Cm27,500.0082,500.002.4000ohPekerja50,000.00120,000.007.2000ohTukang Kayu82,000.00590,400.000.7200ohKepala Tukang88,000.0063,360.000.1200ohMandor95,000.0011,400.00Total :785,160.009,047,500.009,832,660.0016MEMASANG 1 M2 RANGKA ATAP / USUK RENG GENTENG KERAMIK, KAYU KELAS II0.0140m3Kaso-Kaso ( 5 x 7 ) Cm5,500,000.0077,000.000.0036m3Reng ( 2 x 3 ) Cm6,600,000.0023,760.000.2500KgPaku 5 Cm dan 10 Cm27,500.006,875.000.1000ohPekerja50,000.005,000.000.1000ohTukang Kayu82,000.008,200.000.0100ohKepala Tukang88,000.00880.000.0050ohMandor95,000.00475.00Total :14,555.00107,635.00122,190.0017MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II0.0140m3Kaso-Kaso ( 5 x 7 ) Cm5,500,000.0077,000.000.0072m3Reng ( 2 x 3 ) Cm6,600,000.0047,520.000.2500KgPaku 5 Cm dan 10 Cm27,500.006,875.000.1000ohPekerja50,000.005,000.000.1000ohTukang Kayu82,000.008,200.000.0100ohKepala Tukang88,000.00880.000.0050ohMandor95,000.00475.00Total :14,555.00131,395.00145,950.0018MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II0.1650m3Balok Kayu Kamper8,030,000.001,324,950.000.2000KgPaku 5 Cm dan 10 Cm27,500.005,500.000.1200ohPekerja50,000.006,000.000.1200ohTukang Kayu82,000.009,840.000.0120ohKepala Tukang88,000.001,056.000.0060ohMandor95,000.00570.00Total :17,466.001,330,450.001,347,916.0019MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III0.0154m3Kaso-Kaso ( 5 x 7 ) Cm5,500,000.0084,700.000.2000KgPaku 7 Cm dan 10 Cm27,500.005,500.000.1500ohPekerja50,000.007,500.000.3000ohTukang Kayu82,000.0024,600.000.0300ohKepala Tukang88,000.002,640.000.0750ohMandor95,000.007,125.00Total :41,865.0090,200.00132,065.0020MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III0.0163m3Kaso-Kaso ( 5 x 7 ) Cm5,500,000.0089,650.000.2500KgPaku 7 Cm dan 10 Cm27,500.006,875.000.2000ohPekerja50,000.0010,000.000.3000ohTukang Kayu82,000.0024,600.000.0300ohKepala Tukang88,000.002,640.000.0100ohMandor95,000.00950.00Total :38,190.0096,525.00134,715.0021MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II0.0108m3Papan Kayu Kamper8,800,000.0095,040.000.1000KgPaku 5 Cm dan 7 Cm27,500.002,750.000.1000ohPekerja50,000.005,000.000.2000ohTukang Kayu82,000.0016,400.000.0200ohKepala Tukang88,000.001,760.000.0050ohMandor95,000.00475.00Total :23,635.0097,790.00121,425.00

22MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II0.0110m3Papan Kayu Kamper8,800,000.0096,800.000.0500KgPaku 5 Cm dan 7 Cm27,500.001,375.000.1000ohPekerja50,000.005,000.000.2000ohTukang Kayu82,000.0016,400.000.0200ohKepala Tukang88,000.001,760.000.0050ohMandor95,000.00475.00Total :23,635.0098,175.00121,810.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

23MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III0.0280m3Balok Kayu Kamper8,030,000.00224,840.000.1500KgPaku 5 Cm dan 7 Cm27,500.004,125.000.1500ohPekerja50,000.007,500.000.4500ohTukang Kayu82,000.0036,900.000.0450ohKepala Tukang88,000.003,960.000.0080ohMandor95,000.00760.00Total :49,120.00228,965.00278,085.0024MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II0.0280m3Balok Kayu Kamper8,030,000.00224,840.000.1500KgPaku 5 Cm dan 7 Cm27,500.004,125.000.8600LbrTeakwood 4 mm uk 90x220 cm77,000.0066,220.000.5600KgLem Kayu16,500.009,240.000.1500ohPekerja50,000.007,500.000.4500ohTukang Kayu82,000.0036,900.000.0450ohKepala Tukang88,000.003,960.000.0080ohMandor95,000.00760.00Total :49,120.00304,425.00353,545.0025MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II0.0280m3Balok Kayu Kamper8,030,000.00224,840.000.1500KgPaku 5 Cm dan 7 Cm27,500.004,125.000.8600LbrPlywood tebal 4 mm uk 120 x 240 cm71,500.0061,490.000.5600KgLem Kayu16,500.009,240.000.2000ohPekerja50,000.0010,000.000.6000ohTukang Kayu82,000.0049,200.000.0600ohKepala Tukang88,000.005,280.000.0100ohMandor95,000.00950.00Total :65,430.00299,695.00365,125.0026MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA HOLO1.5000BtgRangka Holo25,300.0037,950.000.1500KgPaku 5 Cm dan 7 Cm27,500.004,125.000.8600LbrTeakwood 4 mm uk 90x220 cm77,000.0066,220.000.5600KgLem Kayu16,500.009,240.000.1500ohPekerja50,000.007,500.000.4500ohTukang Kayu82,000.0036,900.000.0450ohKepala Tukang88,000.003,960.000.0080ohMandor95,000.00760.00Total :49,120.00117,535.00166,655.0027MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA HOLO1.5000BtgRangka Holo25,300.0037,950.000.1500KgPaku 5 Cm dan 7 Cm27,500.004,125.000.8600LbrPlywood tebal 4 mm uk 120 x 240 cm71,500.0061,490.000.5600KgLem Kayu16,500.009,240.000.2000ohPekerja50,000.0010,000.000.6000ohTukang Kayu82,000.0049,200.000.0600ohKepala Tukang88,000.005,280.000.0100ohMandor95,000.00950.00Total :65,430.00112,805.00178,235.0028MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I0.0070m3Papan Kayu Kamper8,800,000.0061,600.000.1000KgPaku 5 Cm dan 10 Cm27,500.002,750.000.1500KgPaku Skrup 10 cm27,500.004,125.000.6000ohPekerja50,000.0030,000.001.8000ohTukang Kayu82,000.00147,600.000.1800ohKepala Tukang88,000.0015,840.000.0300ohMandor95,000.002,850.00Total :196,290.0068,475.00264,765.0029MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM0.4000LbrPlywood tebal 4 mm uk 120 x 240 cm71,500.0028,600.000.0500KgPaku 1 Cm dan 2.5 Cm27,500.001,375.000.0250ohPekerja50,000.001,250.000.0750ohTukang Kayu82,000.006,150.000.0080ohKepala Tukang88,000.00704.000.0010ohMandor95,000.0095.00Total :8,199.0029,975.0038,174.00

SNI 03-2836-2002281 M2 PASANGAN USUK GENTENG KAYU KAMPER0.0140M3Kayu Kamper6,600,000.0092,400.000.1500kgPaku27,500.004,125.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang Kayu88,000.00440.000.0500ohPekerja / Pekerja Tak Terlatih50,000.002,500.000.0250ohMandor95,000.002,375.00Total :5,315.0096,525.00101,840.00291 M2 PASANGAN RENG GENTENG KAYU KAMPER0.0040M3Kayu Kamper6,600,000.0026,400.000.1000kgPaku27,500.002,750.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang Kayu88,000.00440.000.0500ohPekerja / Pekerja Tak Terlatih50,000.002,500.000.0250ohMandor95,000.002,375.00Total :9,415.0029,150.0038,565.00301 M2 PASANGAN USUK EKSPOSE DENGAN PLAFOND PLAYWOOD0.0140M3Kayu Kamper6,600,000.0092,400.000.1500kgPaku27,500.004,125.000.3900LbrPlaywood115,500.0045,045.000.4000ohTukang Kayu82,000.0032,800.000.0400ohKepala Tukang Kayu88,000.003,520.000.2700ohPekerja / Pekerja Tak Terlatih50,000.0013,500.000.0135ohMandor95,000.001,282.50Total :51,102.50141,570.00192,672.50

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

VIIPEKERJAAN BETON ( SNI 7394:2008)1MEMBUAT 1 M BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 2)cm, w/c = 0,87247.0000kgSemen Portland1,375.00339,625.008690.62071428570.6207m3Pasir Beton131,000.0081,313.579990.740.7400m3Koral Beton152,000.00112,480.00215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00113,749.00538,793.57652,542.572MEMBUAT 1 M BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78276.0000kgSemen Portland1,375.00379,500.000.5914m3Pasir Beton131,000.0077,477.140.7496m3Koral Beton152,000.00113,943.70215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00576,295.85690,044.853MEMBUAT 1 M BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 2)cm, w/c = 0,72299.0000kgSemen Portland1,375.00411,125.000.5707m3Pasir Beton131,000.0074,763.570.7533m3Koral Beton152,000.00114,506.67215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00605,770.24719,519.244MEMBUAT 1 M BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 2)cm, w/c = 0,66326.0000kgSemen Portland1,375.00448,250.000.5429m3Pasir Beton131,000.0071,114.290.7622m3Koral Beton152,000.00115,857.78215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00640,597.06754,346.065MEMBUAT 1 M BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 2)cm, w/c = 0,61352.0000kgSemen Portland1,375.00484,000.000.5221m3Pasir Beton131,000.0068,400.710.7637m3Koral Beton152,000.00116,082.96215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00673,858.68787,607.686MEMBUAT 1 M BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 2)cm, w/c = 0,58371.0000kgSemen Portland1,375.00510,125.000.4986m3Pasir Beton131,000.0065,312.860.7756m3Koral Beton152,000.00117,884.44215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00698,697.30812,446.307MEMBUAT 1 M BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 2)cm, w/c =0,56384.0000kgSemen Portland1,375.00528,000.000.4943m3Pasir Beton131,000.0064,751.430.7696m3Koral Beton152,000.00116,983.70215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00715,110.13828,859.13

8MEMBUAT 1 M BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 2)cm, w/c =0,53406.0000kgSemen Portland1,375.00558,250.000.4886m3Pasir Beton131,000.0064,002.860.7600m3Koral Beton152,000.00115,520.00215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00743,147.86856,896.86

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

9MEMBUAT 1 M BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 2)cm, w/c =0,52413.0000kgSemen Portland1,375.00567,875.000.4864m3Pasir Beton131,000.0063,722.140.7563m3Koral Beton152,000.00114,957.04215.0000ltAir25.005,375.001.6500ohPekerja50,000.0082,500.000.2750ohTukang Batu76,000.0020,900.000.0280ohKepala Tukang88,000.002,464.000.0830ohMandor95,000.007,885.00Total :113,749.00751,929.18865,678.1810MEMBUAT 1 M BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 2)cm, w/c =0,49439.0000kgSemen Portland1,375.00603,625.000.4786m3Pasir Beton131,000.0062,692.860.7452m3Koral Beton152,000.00113,268.15215.0000ltAir25.005,375.002.1000ohPekerja50,000.00105,000.000.3500ohTukang Batu76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.1050ohMandor95,000.009,975.00Total :144,655.00784,961.01929,616.0111MEMBUAT 1 M BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 2)cm, w/c =0,48448.0000kgSemen Portland1,375.00616,000.000.4764m3Pasir Beton131,000.0062,412.140.7407m3Koral Beton152,000.00112,592.59215.0000ltAir25.005,375.002.1000ohPekerja50,000.00105,000.000.3500ohTukang Batu76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.1050ohMandor95,000.009,975.00Total :144,655.00796,379.74941,034.74

12PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR10.5000kgBesi Beton (Polos/ Ulir)10,000.00105,000.000.1500kgKawat Beton13,750.002,062.500.0700ohPekerja50,000.003,500.000.0700ohTukang Besi79,000.005,530.000.0070ohKepala Tukang88,000.00616.000.0040ohMandor95,000.00380.00Total :10,026.00107,062.50117,088.50Total Untuk 1 Kg :11,708.85131 M2 PASANG BEKISTING UNTUK PONDASI0.0400m3Kayu Kelas III2,585,000.00103,400.000.3000kgPaku Biasa 5' - 10'15,400.004,620.000.1000ltrMinyak Bekisting33,550.003,355.000.5200ohPekerja50,000.0026,000.000.2600ohTukang Kayu82,000.0021,320.000.0260ohKepala Tukang88,000.002,288.000.0260ohMandor95,000.002,470.00Total :52,078.00111,375.00163,453.00

141 M2 PASANG BEKISTING UNTUK SLOOF0.0450m3Kayu Kelas III2,585,000.00116,325.000.3000kgPaku Biasa 5' - 10'15,400.004,620.000.1000ltrMinyak Bekisting33,550.003,355.000.5200ohPekerja50,000.0026,000.000.2600ohTukang Kayu82,000.0021,320.000.0260ohKepala Tukang 88,000.002,288.000.0260ohMandor95,000.002,470.00Total :52,078.00124,300.00176,378.00151 M2 PASANG BEKISTING UNTUK KOLOM0.0400m3Kayu Kelas III2,585,000.00103,400.000.4000kgPaku Biasa 5' - 12'15,400.006,160.000.2000ltrMinyak Bekisting33,550.006,710.000.0150m3Kayu Usuk 4/62,585,000.0038,775.000.3500lbrPlywood 9 mm115,500.0040,425.002.0000btgDolken Kayu 8" - 10"/4 m99,000.00198,000.000.6600ohPekerja50,000.0033,000.000.3300ohTukang Kayu82,000.0027,060.000.0330ohKepala Tukang88,000.002,904.000.0330ohMandor95,000.003,135.00Total :66,099.00393,470.00459,569.00211 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)0.2000m3Kayu Kelas III2,585,000.00517,000.001.5000kgPaku Biasa 5' - 12'15,400.0023,100.000.4000ltrMinyak Bekisting33,550.0013,420.00157.5000kgBesi Beton10,000.001,575,000.002.2500kgKawat Beton13,750.0030,937.50336.0000kgSemen Portland1,340.00450,240.000.5400m3Pasir Beton131,000.0070,740.000.8100m3Koral Beton152,000.00123,120.005.3000ohPekerja50,000.00265,000.000.2750ohTukang Batu76,000.0020,900.001.3000ohTukang Kayu82,000.00106,600.001.0500ohTukang Besi79,000.0082,950.000.2620ohKepala Tukang88,000.0023,056.000.2650ohMandor95,000.0025,175.00Total :523,681.002,803,557.503,327,238.50

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

221 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)0.2700m3Kayu Kelas III2,585,000.00697,950.002.0000kgPaku Biasa 5' - 12'15,400.0030,800.000.6000ltrMinyak Bekisting33,550.0020,130.00210.0000kgBesi Beton10,000.002,100,000.003.0000kgKawat Beton13,750.0041,250.00336.0000kgSemen Portland1,340.00450,240.000.5400m3Pasir Beton131,000.0070,740.000.8100m3Koral Beton152,000.00123,120.005.6500ohPekerja50,000.00282,500.000.2750ohTukang Batu76,000.0020,900.001.5600ohTukang Kayu82,000.00127,920.001.4000ohTukang Besi79,000.00110,600.000.3230ohKepala Tukang88,000.0028,424.000.2830ohMandor95,000.0026,885.00Total :597,229.003,534,230.004,131,459.00231 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING)0.4000m3Kayu Kelas III2,585,000.001,034,000.004.0000kgPaku Biasa 5' - 12'15,400.0061,600.002.0000ltrMinyak Bekisting33,550.0067,100.00315.0000kgBesi Beton10,000.003,150,000.004.5000kgKawat Beton13,750.0061,875.00336.0000kgSemen Portland1,340.00450,240.000.5400m3Pasir Beton131,000.0070,740.000.8100m3Koral Beton152,000.00123,120.000.1500m3Kayu Kelas II balok5,280,000.00792,000.003.5000lbrPlywood 9 mm115,500.00404,250.0020.0000btgDolken Kayu 8" /4 m99,000.001,980,000.007.0500ohPekerja50,000.00352,500.000.2750ohTukang Batu76,000.0020,900.001.6500ohTukang Kayu82,000.00135,300.002.1000ohTukang Besi79,000.00165,900.000.4030ohKepala Tukang88,000.0035,464.000.3530ohMandor95,000.0033,535.00Total :743,599.008,194,925.008,938,524.00241 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING)0.3200m3Kayu Kelas III2,585,000.00827,200.003.2000kgPaku Biasa 5' - 12'15,400.0049,280.001.6000ltrMinyak Bekisting33,550.0053,680.00210.0000kgBesi Beton10,000.002,100,000.003.0000kgKawat Beton13,750.0041,250.00336.0000kgSemen Portland1,340.00450,240.000.5400m3Pasir Beton131,000.0070,740.000.8100m3Koral Beton152,000.00123,120.000.1400m3Kayu Kelas II balok5,280,000.00739,200.002.8000lbrPlywood 9 mm115,500.00323,400.0016.0000btgDolken Kayu 8" /4 m99,000.001,584,000.006.3500ohPekerja50,000.00317,500.000.2750ohTukang Batu76,000.0020,900.001.6500ohTukang Kayu82,000.00135,300.001.4000ohTukang Besi79,000.00110,600.000.3330ohKepala Tukang88,000.0029,304.000.3180ohMandor95,000.0030,210.00Total :643,814.006,362,110.007,005,924.00251 M3 MEMBUAT PLAT LANTAI BETON BERTULANG (150 KG BESI + BEKISTING0.3200m3Kayu Kelas III2,585,000.00827,200.003.2000kgPaku Biasa 5' - 12'15,400.0049,280.001.6000ltrMinyak Bekisting33,550.0053,680.00157.5000kgBesi Beton10,000.001,575,000.002.2500kgKawat Beton13,750.0030,937.50336.0000kgSemen Portland1,340.00450,240.000.5400m3Pasir Beton131,000.0070,740.000.8100m3Koral Beton152,000.00123,120.000.1200m3Kayu Kelas II balok5,280,000.00633,600.002.8000lbrPlywood 9 mm115,500.00323,400.0032.0000btgDolken Kayu 8" /4 m99,000.003,168,000.005.3000ohPekerja50,000.00265,000.000.2750ohTukang Batu76,000.0020,900.001.3000ohTukang Kayu82,000.00106,600.001.0500ohTukang Besi79,000.0082,950.000.2650ohKepala Tukang88,000.0023,320.000.2650ohMandor95,000.0025,175.00523,945.007,305,197.507,829,142.50

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

261 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)0.2400m3Kayu Kelas III2,585,000.00620,400.003.2000kgPaku Biasa 5' - 12'15,400.0049,280.001.6000ltrMinyak Bekisting33,550.0053,680.00157.5000kgBesi Beton10,000.001,575,000.002.2500kgKawat Beton13,750.0030,937.50336.0000kgSemen Portland1,340.00450,240.000.5400m3Pasir Beton131,000.0070,740.000.8100m3Koral Beton152,000.00123,120.000.1600m3Kayu Kelas II balok5,280,000.00844,800.002.8000lbrPlywood 9 mm115,500.00323,400.0024.0000btgDolken Kayu 8" /4 m99,000.002,376,000.005.3000ohPekerja50,000.00265,000.000.2750ohTukang Batu76,000.0020,900.001.3000ohTukang Kayu82,000.00106,600.001.0500ohTukang Besi79,000.0082,950.000.2620ohKepala Tukang88,000.0023,056.000.2650ohMandor95,000.0025,175.00523,681.006,517,597.507,041,278.50271 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING)0.2500m3Kayu Kelas III2,585,000.00646,250.003.0000kgPaku Biasa 5' - 12'15,400.0046,200.001.2000ltrMinyak Bekisting33,550.0040,260.00210.0000kgBesi Beton10,000.002,100,000.003.0000kgKawat Beton13,750.0041,250.00336.0000kgSemen Portland1,340.00450,240.000.5400m3Pasir Beton131,000.0070,740.000.8100m3Koral Beton152,000.00123,120.000.1050m3Kayu Kelas II balok5,280,000.00554,400.002.5000lbrPlywood 9 mm115,500.00288,750.0014.0000btgDolken Kayu 8" /4 m99,000.001,386,000.005.6500ohPekerja50,000.00282,500.000.2750ohTukang Batu76,000.0020,900.001.5600ohTukang Kayu82,000.00127,920.001.4000ohTukang Besi79,000.00110,600.000.3230ohKepala Tukang88,000.0028,424.000.2830ohMandor95,000.0026,885.00597,229.005,747,210.006,344,439.00161 M2 PASANG BEKISTING UNTUK BALOK0.0400m3Kayu Kelas III2,585,000.00103,400.000.4000kgPaku Biasa 5' - 12'15,400.006,160.000.2000ltrMinyak Bekisting33,550.006,710.000.0180m3Kayu Usuk 4/62,585,000.0046,530.000.3500lbrPlywood 9 mm115,500.0040,425.002.0000btgDolken Kayu 8" - 10"/4m99,000.00198,000.000.6600ohPekerja50,000.0033,000.000.3300ohTukang Kayu82,000.0027,060.000.0330ohKepala Tukang88,000.002,904.000.0330ohMandor95,000.003,135.00Total :66,099.00401,225.00467,324.00

171 M2 PASANG BEKISTING UNTUK LANTAI0.0400m3Kayu Kelas III2,585,000.00103,400.000.4000kgPaku Biasa 5' - 12'15,400.006,160.000.2000ltrMinyak Bekisting33,550.006,710.000.0150m3Kayu Usuk 4/62,585,000.0038,775.000.3500lbrPlywood 9 mm115,500.0040,425.006.0000btgDolken Kayu 8" - 10"/4m99,000.00594,000.00 0.6600ohPekerja50,000.0033,000.000.3300ohTukang Kayu82,000.0027,060.000.0330ohKepala Tukang88,000.002,904.000.0330ohMandor95,000.003,135.00Total :66,099.00789,470.00855,569.00181 M2 PASANG BEKISTING UNTUK DINDING0.0300M3Kayu Kelas III2,585,000.0077,550.000.4000KgPaku Biasa 5' - 12'15,400.006,160.000.2000LtrMinyak Bekisting33,550.006,710.000.0200M3Kayu Usuk 4/62,585,000.0051,700.000.3500LbrPlywood 9 mm115,500.0040,425.003.0000BtngDolken Kayu 8" - 10"/4m99,000.00297,000.004.0000BhFormite/penjaga jarak bekisting/spacer2,000.008,000.000.6600OhPekerja50,000.0033,000.000.3300OhTukang Kayu82,000.0027,060.000.0330OhKepala Tukang88,000.002,904.000.0330OhMandor95,000.003,135.0066,099.00487,545.00553,644.00191 M2 PASANG BEKISTING UNTUK TANGGA0.0300m3Kayu Kelas III2,585,000.0077,550.000.4000kgPaku Biasa 5' - 12'15,400.006,160.000.1500ltrMinyak Bekisting33,550.005,032.500.0150m3Kayu Usuk 4/62,585,000.0038,775.000.3500lbrPlywood 9 mm115,500.0040,425.002.0000btgDolken Kayu 8" - 10"/4m99,000.00198,000.000.6600ohPekerja50,000.0033,000.000.3300ohTukang Kayu82,000.0027,060.000.0330ohKepala Tukang88,000.002,904.000.0330ohMandor95,000.003,135.00Total :66,099.00365,942.50432,041.50201 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON0.0264m3Kayu Kelas III (Papan)2,585,000.0068,244.000.6000kgPaku Biasa 5' - 12'15,400.009,240.000.5000btgDolken Kayu 8" - 10"/4m99,000.0049,500.000.1500ohPekerja50,000.007,500.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang 88,000.00440.000.0080ohMandor95,000.00760.00Total :12,800.00126,984.00139,784.00211 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)0.0020m3Kayu Kelas III2,585,000.005,170.000.0100kgPaku Biasa 5' - 12'15,400.00154.003.0000kgBesi Beton10,000.0030,000.000.0450kgKawat Beton13,750.00618.754.0000kgSemen Portland1,340.005,360.000.0060m3Pasir Beton131,000.00786.000.0090m3Koral Beton152,000.001,368.000.1800ohPekerja50,000.009,000.000.0200ohTukang Batu76,000.001,520.000.0200ohTukang Kayu82,000.001,640.000.0200ohTukang Besi79,000.001,580.000.0060ohKepala Tukang88,000.00528.000.0090ohMandor95,000.00855.00Total :15,123.0043,456.7558,579.75

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

SNI 03-2836-200230MEMBUAT 1 M BETON TUMBUK (1 PC : 3 PS : 5 KR)218.0000kgSemen Portland1,340.00292,120.000.5200m3Pasir Beton131,000.0068,120.000.8700m3Koral Beton152,000.00132,240.001.6500ohPekerja50,000.0082,500.000.2500ohTukang Batu76,000.0019,000.000.0250ohKepala Tukang88,000.002,200.000.0800ohMandor95,000.007,600.00Total :111,300.00492,480.00603,780.0031MEMBUAT 1 M BETON CAMPURAN (1 PC : 2 PS : 3 KR)232.0000kgSemen Portland1,340.00310,880.000.5200m3Pasir Beton131,000.0068,120.000.7800m3Koral Beton152,000.00118,560.001.6500ohPekerja50,000.0082,500.000.2500ohTukang Batu76,000.0019,000.000.0250ohKepala Tukang88,000.002,200.000.0800ohMandor95,000.007,600.00Total :111,300.00497,560.00608,860.0032MEMBUAT 1 M BETON BERTULANG CAMPURAN (1 PC : 1,5 PS : 2,5 KR)386.0000kgSemen Portland1,340.00517,240.000.4700m3Pasir Beton131,000.0061,570.000.7800m3Koral Beton152,000.00118,560.001.6500ohPekerja50,000.0082,500.000.2500ohTukang Batu76,000.0019,000.000.0250ohKepala Tukang88,000.002,200.000.0800ohMandor95,000.007,600.00Total :111,300.00697,370.00808,670.0033MEMBUAT 1 M3 TIANG PANCANG PRESTRESSED BETON440.0000KgSemen Portland1,340.00589,600.000.5000m3Pasir Beton131,000.0065,500.000.120.8000m3Koral Beton152,000.00121,600.002.4600GlnRapidrant0.00.00.2000ohPekerja50,000.0010,000.000.0750ohTukang Batu76,000.005,700.000.0075ohKepala Tukang88,000.00660.000.0200ohMandor95,000.001,900.00Total :18,260.00776,700.00794,960.0033MEMBUAT 1 M' PASANG BUIS BETON 1/2 DIAMETRE 50 CM1.0000BjBuis Beton 1/2 Diameter 50 cm82,500.0082,500.000.1200KgSemen1,340.00160.800.120.0130m3Pasir Pasangan152,000.001,976.000.2000ohPekerja50,000.0010,000.000.0750ohTukang Batu76,000.005,700.000.0075ohKepala Tukang88,000.00660.000.0200ohMandor95,000.001,900.00Total :18,260.0084,636.80102,896.8034MEMBUAT 1 M' PASANG BUIS BETON 1/2 DIAMETRE 25 CM1.0000BjBuis Beton 1/2 Diameter 25 cm47,000.0047,000.000.1200KgSemen1,340.00160.800.0130m3Pasir Pasangan152,000.001,976.000.2000ohPekerja50,000.0010,000.000.0750ohTukang Batu76,000.005,700.000.0075ohKepala Tukang88,000.00660.000.0200ohMandor95,000.001,900.00Total :18,260.0049,136.8067,396.80221 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)0.0030m3Kayu Kelas III2,585,000.007,755.000.0200kgPaku Biasa 5' - 12'15,400.00308.003.6000kgBesi Beton10,000.0036,000.000.0500kgKawat Beton13,750.00687.505.5000kgSemen Portland1,340.007,370.000.0090m3Pasir Beton131,000.001,179.000.0150m3Koral Beton152,000.002,280.000.2970ohPekerja50,000.0014,850.000.0330ohTukang Batu76,000.002,508.000.0330ohTukang Kayu82,000.002,706.000.0330ohTukang Besi79,000.002,607.000.0100ohKepala Tukang88,000.00880.000.0150ohMandor95,000.001,425.00Total :24,976.0055,579.5080,555.50

SNI 03-3436-2002

231 M2 PERANCAH / STEGER (MENGGUNAKAN BURUH)0.5769LsDolken Kayu 8" - 10"/4m99,000.0057,113.100.0179m3Kayu Perancah2,585,000.0046,271.501.0000KgPaku15,400.0015,400.000.1795ohPekerja Tidak Terlatih50,000.008,975.000.0769ohPekerja Terlatih60,000.004,614.000.1026ohTukang kayu82,000.008,413.200.0256ohMandor95,000.002,432.00Total :24,434.20118,784.60143,218.80241 M3 COR BETON BASEMENT0.0M2Bekisting 0.0150.000KgBesi Beton11,708.851,756,327.501.000M3Beton K300865,678.18865,678.18Total :0.02,622,005.682,622,005.68

251 M3 COR BETON PONDASI2.000M2Bekisting ( 3 X Pakai)54,484.33108,968.67110.000KgBesi Beton11,708.851,287,973.501.000M3Beton K300865,678.18865,678.18Total :0.02,262,620.352,262,620.35

261 M3 COR BETON DINDING5.000M2Bekisting ( 3 X Pakai)184,548.00922,740.00150.000KgBesi Beton11,708.851,756,327.501.000M3Beton K300865,678.18865,678.18Total :0.03,544,745.683,544,745.68

271 M3 COR SLOOF 4.000M2Bekisting ( 3 X Pakai)58,792.67235,170.67200.000KgBesi Beton11,708.852,341,770.001.000M3Beton K300865,678.18865,678.18Total :0.03,442,618.853,442,618.85281 M3 COR BETON LANTAI7.000M2Bekisting ( 2 X Pakai)427,784.502,994,491.501.000M2Pekerjaan Steger143,218.80143,218.80100.000KgBesi Beton11,708.851,170,885.001.000M3Beton K300865,678.18865,678.18Total :0.05,174,273.485,174,273.48291 M3 COR BETON KOLOM6.667M2Bekisting ( 3 X Pakai)153,189.671,021,315.51200.000KgBesi Beton11,708.852,341,770.001.000M3Beton K300865,678.18865,678.18Total :0.04,228,763.694,228,763.69

301 M3 COR BETON BALOK6.250M2Bekisting ( 3 X Pakai)155,774.67973,591.67300.000KgBesi Beton11,708.853,512,655.001.000M3Beton K300865,678.18865,678.18Total :0.05,351,924.855,351,924.85

311 M3 COR BETON TANGGA10.500M2Bekisting ( 3 X Pakai)144,013.831,512,145.25150.000KgBesi Beton11,708.851,756,327.501.000M3Beton K300865,678.18865,678.18Total :0.04,134,150.934,134,150.93

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

VIIIPEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)11 M2 PASANG ATAP GENTENG KODOK KARANG PILANG SETARA GOOD YEAR21.0000bhGenteng Kodok Good Year4,200.0088,200.000.1500ohPekerja50,000.007,500.000.0750ohTukang Kayu82,000.006,150.000.0075ohKepala Tukang88,000.00660.000.0080ohMandor95,000.00760.00Total :15,070.0088,200.00103,270.0021 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT25.0000bhGenteng Plentong Dicat2,400.0060,000.000.1500ohPekerja50,000.007,500.000.0750ohTukang Kayu82,000.006,150.000.0075ohKepala Tukang 88,000.00660.000.0080ohMandor95,000.00760.00Total :15,070.0060,000.0075,070.0031 M2 PASANG BUBUNGAN GENTENG KODOK KARANG PILANG3.5000bhGenteng bubungan15,000.0052,500.008.0000kgSemen Portland1,340.0010,720.000.0320m3Pasir Pasang152,000.004,864.000.4000ohPekerja50,000.0020,000.000.2000ohTukang Kayu82,000.0016,400.000.0200ohKepala Tukang88,000.001,760.000.0020ohMandor95,000.00190.00Total :38,350.0068,084.00106,434.0041 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM0.7500lbrAsbes Gelombang 1.8 mx0.92mx5mm42,000.0031,500.000.1200kgPaku Pancing 60 x 23027,500.003,300.000.1400ohPekerja50,000.007,000.000.0700ohTukang Kayu82,000.005,740.000.0070ohKepala Tukang Kayu88,000.00616.000.0070ohMandor95,000.00665.00Total :14,021.0034,800.0048,821.0051 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M2.4000lbrBubungan Stel Gelombang49,500.00118,800.006.0000kgPaku Skrup 3,5"27,500.00165,000.000.0840ohPekerja50,000.004,200.000.1250ohTukang Kayu82,000.0010,250.000.0130ohKepala Tukang88,000.001,144.000.0040ohMandor95,000.00380.00Total :15,974.00283,800.00299,774.0061 M2 PEKERJAAN ATAP SIRAP60.0000bhGenteng Sirap7,700.00462,000.000.2000kgPaku Biasa 1/2" - 1"27,500.005,500.000.1660ohPekerja50,000.008,300.000.2500ohTukang Kayu82,000.0020,500.000.0250ohKepala Tukang88,000.002,200.000.0080ohMandor95,000.00760.00Total :31,760.00467,500.00499,260.0071 M2 PEKERJAAN ATAP NOK SIRAP0.4000lbrSeng plat 3" x 6" BJLS 2855,000.0022,000.000.0600kgPaku biasa 1/2" - 1"27,500.001,650.000.0500kgPaku biasa 2" - 5"15,400.00770.000.0040m3Kayu papan 3 cm8,800,000.0035,200.000.1250ohPekerja50,000.006,250.000.2500ohTukang kayu82,000.0020,500.000.0250ohKepala Tukang88,000.002,200.000.0060ohMandor95,000.00570.00Total :29,520.0059,620.0089,140.0081 M2 PASANG ATAP ALANG-ALANG 3 M16.5000lbrAlang - alang13,750.0089,375.000.5000glgTali pengikat16,500.008,250.000.2000ohPekerja50,000.0010,000.000.0050ohMandor95,000.00475.00Total :10,475.0097,625.00108,100.0081 M2 PEKERJAAN ATAP SENG GELOMBANG0.7000lbrSeng Gelombang 3" x 6" BJLS 2899,000.0069,300.000.0200kgPaku Biasa 1/2" - 1"27,500.00550.000.1200ohPekerja50,000.006,000.000.0600ohTukang Kayu82,000.004,920.000.0060ohKepala Tukang 88,000.00528.000.0060ohMandor95,000.00570.00Total :12,018.0069,850.0081,868.0091 M2 PASANGAN LAPISAN ALUMINIUM FOIL1.0500m2Aluminium Foil203,500.00213,675.000.1500ohPekerja50,000.007,500.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang 88,000.00440.000.0080ohMandor95,000.00760.00Total :12,800.00213,675.00226,475.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

131 M' PKERJAAN TALANG PATAHAN ATAP0.5000LbrSeng Plat44,000.0022,000.000.0150kgPaku27,500.00412.500.0190M3Kayu Papan Kruing5,830,000.00110,770.000.4000ohTukang Kayu82,000.0032,800.000.0250ohKepala Tukang Kayu88,000.002,200.000.0400ohPekerja / Pekerja Tak Terlatih50,000.002,000.000.0013ohMandor95,000.00123.50Total :37,123.50133,182.50170,306.00131 M' PASANGAN LIST PLAFOND1.0500MList Kayu Profit33,000.0034,650.000.0100kgPaku27,500.00275.000.0210ohTukang Kayu82,000.001,722.000.0020ohKepala Tukang Kayu88,000.00176.000.0210ohPekerja / Pekerja Tak Terlatih50,000.001,050.000.0010ohMandor95,000.0095.00Total :3,043.0034,925.0037,968.00141 M2 PASANGAN KREPYAK JARO0.0225M3Kayu Kamper Papan8,800,000.00198,000.002.2500ohTukang Kayu82,000.00184,500.000.2250ohKepala Tukang Kayu88,000.0019,800.000.7500ohPekerja / Pekerja Tak Terlatih50,000.0037,500.000.0375ohMandor95,000.003,562.50Total :3,562.50198,000.00201,562.50101 M1 PASANG NOK SENG GELOMBANG0.3000lbrSeng Plat 3" x 6" BJLS 2855,000.0016,500.000.0400kgPaku biasa 1/2" - 1"27,500.001,100.000.1500ohPekerja50,000.007,500.000.0700ohTukang Kayu82,000.005,740.000.0080ohKepala Tukang 88,000.00704.000.0060ohMandor95,000.00570.00Total :14,514.0017,600.0032,114.00111 BH PEKERJAAN PASANGAN MURDA/BETALA/IKUT CELEDU1.0000BHMurda / Puntal Paras275,000.00275,000.000.0130kgSemen1,340.0017.420.0500ohPekerja / Pekerja Tak Terlatih50,000.002,500.000.0250ohMandor95,000.002,375.00Total :4,875.00275,017.42279,892.42

IXPEKERJAAN PLAFOND / LANGIT - LANGIT (SNI 2839-2008)1MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM1.1000lbrAsbes semen16,500.0018,150.000.0100kgPaku Biasa 1/2" - 1"27,500.00275.000.0300ohPekerja50,000.001,500.000.0700ohTukang Kayu82,000.005,740.000.0070ohKepala Tukang 88,000.00616.000.0040ohMandor95,000.00380.00Total :8,236.0018,425.0026,661.0021 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/3 MM, 4MM, 6MM0.3750lbrTRIPLEKS71,500.0026,812.500.0300kgPaku Biasa 1/2" - 1"27,500.00825.000.1000ohPekerja50,000.005,000.000.1000ohTukang Kayu82,000.008,200.000.0100ohKepala Tukang 88,000.00880.000.0050ohMandor95,000.00475.00Total :14,555.0027,637.5042,192.5031 M2 PASANG LANGIT-LANGIT LAMBRIZIRING0.0150m3Kayu Papan 8,800,000.00132,000.000.0100kgPaku Biasa 1/2" - 1"27,500.00275.000.8000ohPekerja50,000.0040,000.000.8000ohTukang Kayu82,000.0065,600.000.0800ohKepala Tukang 88,000.007,040.000.0400ohMandor95,000.003,800.00Total :116,440.00132,275.00248,715.0041 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL1.0500m1List Kayu Profil 4/5 cm33,000.0034,650.000.1000kgPaku list 27,500.002,750.000.0500ohPekerja50,000.002,500.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang 88,000.00440.000.0030ohMandor95,000.00285.00Total :7,325.0037,400.0044,725.0051 M2 PASANG LANGIT-LANGIT AKUSTIK UKURAN (60 x 120) CM + RANGKA ALUMINIUM3.6000m1Profil Aluminium "T"181,500.00653,400.000.1500kgKawat Diameter 4 mm23,000.003,450.001.0500m1Ramset12,000.0012,600.001.5000LembrAkustik 60 cm x 120 cm45,100.0067,650.000.5000ohPekerja50,000.0025,000.000.5000ohTukang Besi79,000.0039,500.000.0500ohKepala Tukang 88,000.004,400.000.0250ohMandor95,000.002,375.00Total :71,275.00737,100.00808,375.00 SNI 03-2836-200261 M2 PASANG LANGIT-LANGIT ASBES + RANGKA0.0120m3Kamper Usuk 4/6 cm5,170,000.0062,040.000.0600kgPaku Biasa 2" - 5"27,500.001,650.001.1000lbrAsbes16,500.0018,150.000.1800ohPekerja50,000.009,000.000.3200ohTukang Kayu82,000.0026,240.000.0320ohKepala Tukang88,000.002,816.000.0090ohMandor95,000.00855.00Total :38,911.0081,840.00120,751.0071 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM0.1100kgPaku Sekrup22,000.002,420.000.3640lbrGypsum Board (120x240x9)62,700.0022,822.80

0.1000ohPekerja50,000.005,000.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang88,000.00440.000.0050ohMandor95,000.00475.00Total :10,015.0025,242.8035,257.8081 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM0.1100kgPaku Kalsiboard27,500.003,025.000.3640lbrKalsiboard 4.5 mm62,700.0022,822.800.1000ohPekerja50,000.005,000.000.0500ohTukang Kayu82,000.004,100.000.0050ohKepala Tukang88,000.00440.000.0050ohMandor95,000.00475.00Total :10,015.0025,847.8035,862.80

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

71 M2 PLAFOND GYPSUM, RANGKA KAYU0.364LbrGypsum Board (120x240x9)62,700.0022,822.800.023M3Kayu Kruing Usuk5,170,000.00118,910.000.260KgPaku Kalsiboard27,500.007,150.000.300OHPekerja50,000.0015,000.000.350OHTukang Kayu82,000.0028,700.000.035OHKepala Tukang Kayu88,000.003,080.000.0150OHMandor95,000.001,425.00Total :4,505.00148,882.80153,387.8081 M2 PLAFOND GYPSUM, RANGKA HOLO0.364LbrGypsum Board (120x240x9)62,700.0022,822.801.500BtgRangka Holo25,300.0037,950.000.110KgPaku Kalsiboard33,000.003,630.000.34722222220.300OHPekerja50,000.0015,000.000.350OHTukang Kayu82,000.0028,700.000.035OHKepala Tukang Kayu88,000.003,080.000.0150ohMandor95,000.001,425.00Total :33,205.0064,402.8097,607.8091 M2 PLAFOND KALSIBOARD, RANGKA KAYU0.034LbrKalsiboard (4,5 x 1220 x 2420) mm93,500.003,179.000.023M3Kayu Kruing Usuk5,170,000.00118,910.000.260KgPaku Kalsiboard27,500.007,150.000.300OHPekerja50,000.0015,000.000.350OHTukang Kayu82,000.0028,700.000.035OHKepala Tukang Kayu88,000.003,080.000.0150OHMandor95,000.001,425.00Total :4,505.00129,239.00133,744.00101 M2 PLAFOND KALSIBOARD, RANGKA HOLO0.034LbrKalsiboard (4,5 x 1220 x 2420) mm93,500.003,179.001.500BtgRangka Holo25,300.0037,950.000.110KgPaku Kalsiboard33,000.003,630.000.300OHPekerja50,000.0015,000.000.350OHTukang Kayu82,000.0028,700.000.035OHKepala Tukang Kayu88,000.003,080.000.0150ohMandor95,000.001,425.00Total :33,205.0044,759.0077,964.00XPEKERJAAN SANITASI ( SNI 2002 )1MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK0.03387074921.0000bhKloset duduk/ monoblok2,354,000.002,354,000.006% x harga klosetPerlengkapan141,240.003.3000ohPekerja50,000.00165,000.001.1000ohTukang batu76,000.0083,600.000.0010ohKepala Tukang88,000.0088.000.1600ohMandor95,000.0015,200.00Total :263,888.002,495,240.002,759,128.002MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN1.0000bhKloset jongkok porselen159,500.00159,500.006.0000kgSemen Portland1,340.008,040.000.0100m3Pasir Pasang152,000.001,520.001.0000ohPekerja50,000.0050,000.001.5000ohTukang batu76,000.00114,000.001.5000ohKepala Tukang88,000.00132,000.000.1600ohMandor95,000.0015,200.00Total :311,200.00169,060.00480,260.003MEMASANG 1 BUAH URINOIR1.0000bhUrinoir2,376,000.002,376,000.0030% x harga UrinPerlengkapan712,800.006.0000kgSemen Portland1,340.008,040.000.0100m3Pasir Pasang152,000.001,520.001.0000ohPekerja50,000.0050,000.001.0000ohTukang batu76,000.0076,000.000.1000ohKepala Tukang88,000.008,800.000.1000ohMandor95,000.009,500.00Total :144,300.003,098,360.003,242,660.004MEMASANG 1 BUAH WASHTAFEL KIA1.0000bhWashtafel203,500.00203,500.0012% x harga wastPerlengkapan24,420.006.0000kgSemen Portland1,340.008,040.000.0100m3Pasir Pasang152,000.001,520.001.2000ohPekerja50,000.0060,000.001.4500ohTukang batu76,000.00110,200.000.1500ohKepala Tukang88,000.0013,200.000.1000ohMandor95,000.009,500.00Total :192,900.00237,480.00430,380.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

51 M2 PASANG LANTAI UBIN TERALUX UKURAN (40 X 40) CM 6.6300bhUbin Teralux Kerang132,000.00875,160.009.8000kgSemen Portland1,340.0013,132.000.0450m3Pasir Pasang152,000.006,840.001.3000kgSemen warna/semen grouting11,000.0014,300.000.2500ohPekerja50,000.0012,500.000.1250ohTukang batu76,000.009,500.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :24,379.00909,432.00933,811.0061 M2 PASANG LANTAI UBIN TERALUX UKURAN (30 X 30) CM 11.8700bhUbin Teralux Kerang132,000.001,566,840.0010.0000kgSemen Portland1,340.0013,400.000.0450m3Pasir Pasang152,000.006,840.001.5000kgSemen warna/semen grouting11,000.0016,500.000.2600ohPekerja50,000.0013,000.000.1300ohTukang batu76,000.009,880.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :25,259.001,603,580.001,628,839.0071 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN (60 X 60) CM 3.1000bhUbin Teralux Marmer 132,000.00409,200.009.8000kgSemen Portland1,340.0013,132.000.0450m3Pasir Pasang152,000.006,840.001.3000kgSemen warna/semen grouting11,000.0014,300.000.2500ohPekerja50,000.0012,500.000.1250ohTukang batu76,000.009,500.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :24,379.00443,472.00467,851.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

5MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M31.0000bhBak Fibreglass253,000.00253,000.0018% x harga wastPerlengkapan45,540.001.8000ohPekerja50,000.0090,000.002.7000ohTukang batu76,000.00205,200.000.5400ohKepala Tukang88,000.0047,520.000.1100ohMandor95,000.0010,450.00Total :353,170.00298,540.00651,710.006MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "1.2000m1Pipa galvanis193,600.00232,320.0035% x harga pipaPerlengkapan67,760.000.0540ohPekerja50,000.002,700.000.0900ohTukang Pipa76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0270ohMandor95,000.002,565.00Total :12,897.00300,080.00312,977.007MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"1.2000M'Pipa galvanis627,000.00752,400.0035% x harga pipaPerlengkapan219,450.000.1080OhPekerja50,000.005,400.000.1800OhTukang Pipa76,000.0013,680.000.0180OhKepala Tukang88,000.001,584.000.0054OhMandor95,000.00513.00Total :21,177.00971,850.00993,027.008MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"1.2000m1Pipa PVC17,425.0020,910.0035% x harga pipaPerlengkapan6,098.750.0360ohPekerja50,000.001,800.000.0600ohTukang Pipa76,000.004,560.000.0060ohKepala Tukang88,000.00528.000.0018ohMandor95,000.00171.00Total :7,059.0027,008.7534,067.759MEMASANG 1 M1 PIPA PVC TYPE AW f 2"1.2000m1Pipa PVC25,825.0030,990.0035% x harga pipaPerlengkapan9,038.750.0540ohPekerja50,000.002,700.000.0900ohTukang Pipa76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0027ohMandor95,000.00256.50Total :10,588.5040,028.7550,617.2510MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"1.2000m1Pipa PVC68,950.0082,740.0035% x harga pipaPerlengkapan24,132.500.0810ohPekerja50,000.004,050.000.1350ohTukang Pipa76,000.0010,260.000.0135ohKepala Tukang88,000.001,188.000.0041ohMandor95,000.00389.50Total :15,887.50106,872.50122,760.0011MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"1.0000bhKran air22,000.0022,000.000.0250bhSeal tape3,300.0082.500.0100ohPekerja50,000.00500.000.1000ohTukang Pipa76,000.007,600.000.0100ohKepala Tukang88,000.00880.000.0050ohMandor95,000.00475.00Total :9,455.0022,082.5031,537.50121 UNIT PEKERJAAN SEPTICTANK DAN PERESAPAN3.5000mPekerjaan Galian Tanah39,875.00139,562.509.0000mPasangan Batu Bata 1pc : 3ps204,743.751,842,693.750.1250mPekerjaan beton rabat652,542.5781,567.820.3000mPekerjaan beton bertulang754,346.06226,303.8236.0000kgPembesian11,708.85421,518.602.4000mPekerjaan Bekisting553,644.001,328,745.609.0000mPekerjaan Plesteran 1pc : 2ps46,243.00416,187.004.0000mPipa Hawa D2,5"53,840.00215,360.004.0000mPipa PVC D4"104,408.75417,635.002.0000mPipa Galvanis D1"35,000.0070,000.001.0000bhT Galvanis D1"32,500.0032,500.001.0000bhElbow PVC D2.5"9,000.009,000.0040.0000kgIjuk37,500.001,500,000.000.4000mPekerjaan Urugan Pasir177,950.0071,180.000.4000mBatu Karang143,000.0057,200.000.2000mKoral/Kerikil152,000.0030,400.00Total :702,995.006,156,859.096,859,854.090.0003ohMandor100,000.0030.00Total :703,025.007,857,139.098,560,164.093MENGERJAKAN 100 KG PEKERJAAN PERAKITAN1.0000ltSolar13,200.0013,200.000.1000ltMinyak Pelumas33,550.003,355.000.1000ohPekerja9,000.00900.000.1000ohTukang besi37,500.003,750.000.0010ohKepala TukangTotal :ERROR:#VALUE!0.0050ohMandor100,000.00500.000.8000JamSewa Alat0.00.0Total :ERROR:#VALUE!16,555.00ERROR:#VALUE!4 1M2 MEMBUAT PINTU BESI PLAT BAJA TEBAL 2 MM RANGKAP, RANGKA BAJA SIKU15.0000KgBesi Siku L 30,30,353,900.00808,500.0032.8000kgBesi Plat BajaERROR:#REF!ERROR:#REF!0.0500kgKawat Las71,500.003,575.001.0500ohPekerja652,542.57685,169.701.0500ohTukang Las Biasa754,346.06792,063.370.1050ohKepala Tukang11,708.851,229.430.0520ohMandor553,644.0028,789.49Total :1,507,251.98ERROR:#REF!ERROR:#REF!51 M2 PASANG ROLLING DOOR BESI1.0000m2Pintu gulung besi0.00.00.2000ohPekerja652,542.57130,508.510.2000ohTukang besi754,346.06150,869.210.0200ohKepala Tukang11,708.85234.180.0010ohMandor553,644.00553.64Total :282,165.550.0282,165.55

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456XIPEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)11 KG PASANG RANGKA ATAP BAJA1.1500kgBesi Profil WF0.00.00.0060ohPekerja0.00.00.0600ohTukang besi0.00.00.0060ohKepala Tukang45,000.00270.000.0003ohMandor45,000.0013.50Total :283.500.0283.5021 KG MEMASANG RANGKA KUDA - KUDA BAJA IWF1.1500kgBesi Baja IWF0.00.00.0060ohPekerja0.00.00.0600ohTukang besi0.00.00.0060ohKepala Tukang0.00.0

31 M2 PASANG ROLLING DOOR ALLUMINIUM1.0000m2Rolling Door Alluminium236,500.00236,500.001.0000ohPekerja50,000.0050,000.001.0000ohTukang Aluminium76,000.0076,000.000.1000ohKepala Tukang88,000.008,800.000.0500ohMandor95,000.004,750.00Total :139,550.00236,500.00376,050.0041 M2 PASANG KUSEN PINTU ALLUMINIUM1.1000mProfil Aluminium10,500.0011,550.002.0000bhSekruf fixer440.00880.000.0600TubeSealant22,000.001,320.000.0430ohPekerja50,000.002,150.000.0430ohTukang Alumium76,000.003,268.000.0043ohKepala Tukang88,000.00378.400.0021ohMandor95,000.00199.50Total :5,995.9013,750.0019,745.9051 M2 PASANG PINTU KACA RANGKA ALLUMINIUM4.4000mPintu Aluminium10,500.0046,200.004.5000mProfil Kaca8,250.0037,125.000.2700TubeSealant22,000.005,940.000.0850ohPekerja50,000.004,250.000.0850ohTukang Alumium76,000.006,460.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :11,977.0089,265.00101,242.00

61 M2 PASANG VENETIONS BLINDS DAN VERTICAL BLINDS1.0000m2Venetions Blinds dan Vertical Blinds (Tirai)0.00.00.3500ohPekerja50,000.0017,500.000.3500ohTukang Alumium76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.0180ohMandor95,000.001,710.00Total :48,890.000.048,890.0061 M2 PASANG TERALI BESI STRIP (2 x 3 ) mm6.1770kgBesi strip20,000.00123,540.0027.0800cmPengelasan12,000.00324,960.001.6700ohPekerja50,000.0083,500.001.6700ohTukang Las 76,000.00126,920.000.1670ohKepala Tukang88,000.0014,696.000.0830ohMandor95,000.007,885.00Total :233,001.00448,500.00681,501.0071 M2 KAWAT NYAMUK1.1000m2Kawat Nyamuk22,000.0024,200.0011.1100cmPengelasan12,000.00133,320.001.7160kgBaja Strip (0,2 x 2) cm20,000.0034,320.000.1000ohPekerja50,000.005,000.000.1000ohTukang Besi79,000.007,900.000.0100ohKepala Tukang88,000.00880.000.0050ohMandor95,000.00475.00Total :14,255.00191,840.00206,095.0081 M2 PASANG JENDELA NAKO & TRALIS1.1000m2Rangka + Kaca Nako32,000.0035,200.0010.0000bhPaku biasa 1 cm - 2,5 cm27,500.00275,000.007.0000m'Besi strip8,800.0061,600.000.2000ohPekerja50,000.0010,000.000.2000ohTukang besi79,000.0015,800.000.0200ohKepala Tukang88,000.001,760.000.0010ohMandor95,000.0095.00Total :27,655.00371,800.00399,455.0091 M1 PASANG TALANG DATAR, SENG BJLS 281.0500lbrSeng plat55,000.0057,750.000.0150kgPaku biasa 0,5" - 1" 27,500.00412.500.0190m3Kayu papan kelas II/III8,800,000.00167,200.000.2000ohPekerja50,000.0010,000.000.4000ohTukang besi79,000.0031,600.000.0250ohKepala Tukang88,000.002,200.000.0100ohMandor95,000.00950.00Total :44,750.00225,362.50270,112.50101 M2 PEK. KUDA -KUDA BAJA RINGAN SETARA SURYA TRUSS0.2630btgRangka C 85085 @ 7 Galvalume225,000.0059,175.000.4240btgRangka C 85085 @ 7 Galvalume181,500.0076,956.000.9560btgReng (Butten 30) @ 6 Galvalume70,000.0066,920.000.0670btgReng Pengikat Kuda-Kuda @6 Galvalume70,000.004,690.000.0070btgTalang Valley @ 3166,000.001,162.000.1940btgPlat Strip @ 12,750.00533.5034.9990bhBaut Kuda-Kuda SDS 6 - 19320.0011,199.6822.0000bhBaut Reng SDS 6 - 16195.004,290.000.4720bhBaut Listplank 6 - 70780.00368.160.4720bhDinabold 10 - 652,150.001,014.801.0000m2Upah Pasang24,000.0024,000.001.0000LsMaterial dan Alat Bantu11,500.0011,500.00Total :24,000.00237,809.14261,809.14XIIPEKERJAAN KUNCI DAN KACA (SNI 2002)11 BH PASANG KUNCI TANAM BIASA1.0000bhKunci tanam biasa24,200.0024,200.000.0100ohPekerja50,000.00500.000.5000ohTukang besi79,000.0039,500.000.0100ohKepala Tukang88,000.00880.000.0050ohMandor95,000.00475.00Total :41,355.0024,200.0065,555.0021 PS PASANG ENGSEL PINTU1.0000psEngsel pintu60,500.0060,500.000.0150ohPekerja50,000.00750.000.1500ohTukang besi79,000.0011,850.000.0150ohKepala Tukang88,000.001,320.000.0008ohMandor95,000.0076.00Total :13,996.0060,500.0074,496.00

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

41 M PASANG PLINT UBIN TERALUX UKURAN (10 X 40) CM 2.6500bhPlint Ubin Teralux Kerang132,000.00349,800.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00352,883.60365,490.6051 M PASANG PLINT UBIN TERALUX MARMER UKURAN (10 X 60) CM 1.7000bhPlint Ubin Teralux Marmer 132,000.00224,400.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00227,483.60240,090.6061 M PASANG PLINT UBIN TERALUX MARMER UKURAN (10 X 40) CM 2.6500bhUbin Teralux Marmer 132,000.00349,800.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00352,883.60365,490.6071 M PASANG PLINT UBIN TERALUX MARMER UKURAN (10 X 30) CM 3.5300bhUbin Teralux Marmer 132,000.00465,960.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00469,043.60481,650.60

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

151 M PASANG PLINT UBIN TERALUX UKURAN (10 X 30) CM 3.5300bhPlint Ubin Teralux Kerang132,000.00465,960.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00469,043.60481,650.60

51 M1 PASANG PLIN KERAMIK 10 X 30 CM5.3000bhKeramik 30 x 30 cm5,290.9128,041.821.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.0250kgSemen warna/semen grouting11,000.00275.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.0030,300.4242,907.42

111 M1 PASANG PLIN KERAMIK 10 X 20 CM5.3000bhPlint Keramik 10 x 20 cm132,000.00699,600.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.0250kgSemen warna/semen grouting11,000.00275.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00701,858.60714,465.6031 PS PASANG ENGSEL JENDELA KUPU-KUPU1.0000psEngsel jendela54,000.0054,000.000.0100ohPekerja50,000.00500.000.1000ohTukang besi79,000.007,900.000.0100ohKepala Tukang88,000.00880.000.0005ohMandor95,000.0047.50Total :9,327.5054,000.0063,327.5041 BH PASANG KAIT ANGIN1.0000psKait angin45,700.0045,700.000.0150ohPekerja50,000.00750.000.1500ohTukang besi79,000.0011,850.000.0150ohKepala Tukang88,000.001,320.000.0008ohMandor95,000.0076.00Total :13,996.0045,700.0059,696.0051 BH PASANG KUNCI SLOT1.0000bhKunci slot20,200.0020,200.000.0200ohPekerja50,000.001,000.000.2000ohTukang besi79,000.0015,800.000.0200ohKepala Tukang88,000.001,760.000.0010ohMandor95,000.0095.00Total :18,655.0020,200.0038,855.0061 M2 PASANG KACA, TEBAL 3 - 5 MM1.1000bhKaca121,000.00133,100.000.0150ohPekerja50,000.00750.000.1500ohTukang besi79,000.0011,850.000.0150ohKepala Tukang88,000.001,320.000.0008ohMandor95,000.0076.00Total :13,996.00133,100.00147,096.00XIIIPEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008)11 M2 PASANG LANTAI UBIN TERASO UKURAN (40 X 40) CM 6.6300bhUbin Teraso132,000.00875,160.009.8000kgSemen Portland1,340.0013,132.000.0450m3Pasir Pasang152,000.006,840.001.3000kgSemen warna/semen grouting11,000.0014,300.000.2500ohPekerja50,000.0012,500.000.1250ohTukang batu76,000.009,500.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :24,379.00909,432.00933,811.0021 M2 PASANG LANTAI UBIN TERASO UKURAN (30 X 30) CM 11.8700bhUbin Teraso132,000.001,566,840.0010.0000kgSemen Portland1,340.0013,400.000.0450m3Pasir Pasang152,000.006,840.001.5000kgSemen warna/semen grouting11,000.0016,500.000.2600ohPekerja50,000.0013,000.000.1300ohTukang batu76,000.009,880.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :25,259.001,603,580.001,628,839.0011 M2 PASANG LANTAI UBIN GRANIT UKURAN (40 X 40) CM 6.6300bhUbin Granit242,000.001,604,460.009.8000kgSemen Portland1,340.0013,132.000.0450m3Pasir Pasang152,000.006,840.001.3000kgSemen warna/semen grouting11,000.0014,300.000.2500ohPekerja50,000.0012,500.000.1250ohTukang batu76,000.009,500.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :24,379.001,638,732.001,663,111.0011 M2 PASANG LANTAI GERANIT 60 X 60 CM SETARA GRANITO1.0500m2Geranit 60 x 60 cm setara granito247,500.00259,875.0011.3800kgSemen Portland1,340.0015,249.200.0420m3Pasir Pasang152,000.006,384.001.5000kgSemen warna/semen grouting11,000.0016,500.000.6200ohPekerja50,000.0031,000.0031,000.000.3500ohTukang batu76,000.0026,600.0026,600.000.0350ohKepala Tukang88,000.003,080.000.0030ohMandor95,000.00285.00Total :60,965.00355,608.20416,573.2021 M PASANG PLINT UBIN GRANIT UKURAN (10 X 40) CM 2.6500bhPlint Ubin Granit132,000.00349,800.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00352,883.60365,490.6081 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN (40 X 40) CM 6.6300bhUbin Teralux Marmer 132,000.00875,160.009.8000kgSemen Portland1,340.0013,132.000.0450m3Pasir Pasang152,000.006,840.001.3000kgSemen warna/semen grouting11,000.0014,300.000.2500ohPekerja50,000.0012,500.000.1250ohTukang batu76,000.009,500.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :24,379.00909,432.00933,811.0091 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN (30 X 30) CM 11.8700bhUbin Teralux Marmer 132,000.001,566,840.0010.0000kgSemen Portland1,340.0013,400.000.0450m3Pasir Pasang152,000.006,840.001.5000kgSemen warna/semen grouting11,000.0016,500.000.2600ohPekerja50,000.0013,000.000.1300ohTukang batu76,000.009,880.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :25,259.001,603,580.001,628,839.00101 M PASANG PLINT UBIN TERASO UKURAN (10 X 30) CM 6.6300bhPlint Ubin Teraso132,000.00875,160.009.8000kgSemen Portland1,340.0013,132.000.0450m3Pasir Pasang152,000.006,840.001.3000kgSemen warna/semen grouting11,000.0014,300.000.2500ohPekerja50,000.0012,500.000.1250ohTukang batu76,000.009,500.000.0130ohKepala Tukang88,000.001,144.000.0130ohMandor95,000.001,235.00Total :24,379.00909,432.00933,811.00111 M PASANG PLINT UBIN TERASO UKURAN (10 X 40) CM 2.6500bhPlint Ubin Teraso132,000.00349,800.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00352,883.60365,490.6031 M PASANG PLINT UBIN GRANIT UKURAN (10 X 30) CM 3.5300bhPlint Ubin Granit132,000.00465,960.001.1400kgSemen Portland1,340.001,527.600.0030m3Pasir Pasang152,000.00456.000.1000kgSemen warna/semen grouting11,000.001,100.000.0900ohPekerja50,000.004,500.000.0900ohTukang batu76,000.006,840.000.0090ohKepala Tukang88,000.00792.000.0050ohMandor95,000.00475.00Total :12,607.00469,043.60481,650.601 M PASANG PLINT KERAMIK PLATINUM 10 X 60 CM0.3500bhKeramik 60 x 60 cm Platinum22,500.007,875.001.6500kgSemen Portland1,160.001,914.000.0030m3Pasir Pasang155,000.00465.000.1000kgSemen warna15,000.001,500.000.0600ohPekerja50,000.003,000.000.0300ohTukang Batu76,000.002,280.000.0030ohKepala Tukang88,000.00264.000.0030ohMandor95,000.00285.00Total :5,829.0011,754.0017,583.0021 M2 PASANG LANTAI KERAMIK 30 X 30 CM11.8700bhKeramik 30 x 30 cm5,290.9162,803.0910.0000kgSemen Portland1,340.0013,400.000.0450m3Pasir Pasang152,000.006,840.001.5000kgSemen warna/semen grouting11,000.0016,500.000.7000ohPekerja50,000.0035,000.000.3500ohTukang batu76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.0350ohMandor95,000.003,325.00Total :68,005.0099,543.09167,548.0931 M2 PASANG LANTAI KERAMIK 20 X 20 CM26.5000bhKeramik 20 x 20 cm2,064.0054,696.0010.4000kgSemen Portland1,340.0013,936.000.0450m3Pasir Pasang152,000.006,840.001.6200kgSemen warna/semen grouting11,000.0017,820.000.7000ohPekerja50,000.0035,000.000.3500ohTukang batu76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.0350ohMandor95,000.003,325.00Total :68,005.0093,292.00161,297.0041 M2 PASANG LANTAI MARMER 100 X 100 CM1.0600bhMarmer 165,000.00174,900.008.1900kgSemen Portland1,340.0010,974.600.0450m3Pasir Pasang152,000.006,840.000.6500kgSemen warna/semen grouting11,000.007,150.000.7000ohPekerja50,000.0035,000.000.3500ohTukang batu76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.0350ohMandor95,000.003,325.00Total :68,005.00199,864.60267,869.60

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

51 M2 PASANG DINDING KERAMIK 20 X 50 CM1.0500mKeramik 20 x 50 cm76,000.0079,800.009.3000kgSemen Portland1,340.0012,462.000.0180m3Pasir Pasang152,000.002,736.001.9400kgSemen warna/semen grouting11,000.0021,340.000.9000ohPekerja50,000.0045,000.000.4500ohTukang batu76,000.0034,200.000.0450ohKepala Tukang88,000.003,960.000.0450ohMandor95,000.004,275.00Total :87,435.00116,338.00203,773.0061 M2 PASANG DINDING MARMER 100 X 100 CM1.0600bhMarmer 165,000.00174,900.003.0030bhPaku 12 cm27,500.0012.4400kgSemen Portland1,340.0016,669.600.0250m3Pasir Pasang152,000.003,800.000.6500kgSemen warna/semen grouting11,000.007,150.001.3000ohPekerja50,000.0065,000.000.6500ohTukang batu76,000.0049,400.000.0650ohKepala Tukang88,000.005,720.000.0650ohMandor95,000.006,175.00Total :126,295.00202,519.60328,814.6071 M1 PASANG PLIN KAYU 2 X 10 CM0.0030m3Papan Kayu Kelas II8,800,000.0026,400.000.0500kgPaku sekrup 3,5'27,500.001,375.000.1200ohPekerja50,000.006,000.000.1200ohTukang kayu82,000.009,840.000.0120ohKepala Tukang88,000.001,056.000.0060ohMandor95,000.00570.00Total :17,466.0027,775.0045,241.0071 M2 PASANG DINDING BATA PELAPIS UKURAN (3 X 7 X 24)63.0000bhBata Pelapis Dinding5,500.00346,500.0012.4400kgSemen Portland1,340.0016,669.600.0250m3Pasir Pasang152,000.003,800.002.7500kgSemen warna/semen grouting11,000.0030,250.001.0000ohPekerja50,000.0050,000.000.5000ohTukang batu76,000.0038,000.000.0500ohKepala Tukang88,000.004,400.000.0500ohMandor95,000.004,750.00Total :97,150.00397,219.60494,369.6081 M2 PASANG DINDING BATU PARAS (30 X 15)22.0000bhBatu Paras16,500.00363,000.0011.7500kgSemen Portland1,340.0015,745.000.0350m3Pasir Pasang152,000.005,320.000.7000ohPekerja50,000.0035,000.000.3500ohTukang batu76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.0350ohMandor95,000.003,325.00Total :68,005.00384,065.00452,070.0091 M2 PASANG DINDING BATU CANDI HITAM1.1000m2Batu Candi Hitam (20 x 20 x 3 Cm)99,000.00108,900.0011.7500kgSemen Portland1,340.0015,745.000.0350m3Pasir Pasang152,000.005,320.000.7000ohPekerja50,000.0035,000.000.3500ohTukang batu76,000.0026,600.000.0350ohKepala Tukang88,000.003,080.000.0350ohMandor95,000.003,325.00Total :68,005.00129,965.00197,970.00 SNI 03-2836-2002101 M2 PASANGAN TEGEL DAN SPESI0.0230m2Pasir Pasangan152,000.003,496.001.4400KgSemen1,340.001,929.601.0000M2Tegel 30 x30 TB PC71,500.0071,500.000.2500ohTukang Batu76,000.0019,000.000.0250ohKepala Tukang Batu88,000.002,200.000.5000ohPekerja / Pekerja Tak Terlatih50,000.0025,000.000.0250ohMandor95,000.002,375.00Total :27,375.0076,925.60104,300.60111 M2 PASANGAN TEGEL WARNA KUNING DENGAN SPESI0.0230m2Pasir Pasangan152,000.003,496.001.4400KgSemen1,340.001,929.601.0000M2Tegel 30 x30 TB PC71,500.0071,500.000.2500ohTukang Batu76,000.0019,000.000.0250ohKepala Tukang Batu88,000.002,200.000.5000ohPekerja / Pekerja Tak Terlatih50,000.0025,000.000.0250ohMandor95,000.002,375.00Total :48,575.0076,925.60125,500.60

NOURAIANHARGAHARGAHARGAHARGASATUANUPAHBAHANJUMLAH(Rp)(Rp)(Rp)(Rp)123456

101 M2 PASANG WALL PAPER, LEBAR 50 CM2.2